﻿<?xml version="1.0" encoding="utf-8"?><Regulation regulation-type="SOR" xml:lang="en" startdate="20060322"><Identification Code="id=&quot;&quot;"><LimsAuthority><Alpha>T-7</Alpha><AuthorityTitle>Territorial Lands Act</AuthorityTitle></LimsAuthority><InstrumentNumber>C.R.C., c. 1524</InstrumentNumber><ConsolidationDate><Date><YYYY>2013</YYYY><MM>01</MM><DD>28</DD></Date></ConsolidationDate><LastModifiedDate><Date><YYYY>2011</YYYY><MM>5</MM><DD>9</DD></Date></LastModifiedDate><EnablingAuthority Code="id=&quot;&quot;,ea=&quot;&quot;"><XRefExternal reference-type="act">TERRITORIAL LANDS ACT</XRefExternal></EnablingAuthority><LongTitle Code="id=&quot;&quot;,lt=&quot;&quot;">Territorial Land Use Regulations</LongTitle></Identification><Body><Section Code="se=&quot;1&quot;"><Label>1.</Label><Text><Repealed>[Repealed, SOR/2003-126, s. 4]</Repealed></Text></Section><Heading Code="ga=&quot;s_2&quot;,h1=&quot;&quot;" level="1"><TitleText Code="ga=&quot;s_2&quot;,h1=&quot;&quot;,t1=&quot;&quot;,nb=&quot;1&quot;">INTERPRETATION</TitleText></Heading><Section Code="se=&quot;2&quot;"><Label>2.</Label><Text>In these Regulations,</Text><Definition generate-in-text="no" Code="se=&quot;2&quot;,df=&quot;{Act}{Loi}&quot;"><Text><DefinedTermEn>Act</DefinedTermEn> means the <XRefExternal reference-type="act" link="T-7">Territorial Lands Act</XRefExternal>; (<DefinedTermFr>Loi</DefinedTermFr>)</Text></Definition><Definition generate-in-text="no" Code="se=&quot;2&quot;,df=&quot;{Class A Permit}{permis de catégorie A}&quot;"><Text><DefinedTermEn>Class A Permit</DefinedTermEn> means a permit issued pursuant to section 25; (<DefinedTermFr>permis de catégorie A</DefinedTermFr>)</Text></Definition><Definition generate-in-text="no" Code="se=&quot;2&quot;,df=&quot;{Class B Permit}{permis de catégorie B}&quot;"><Text><DefinedTermEn>Class B Permit</DefinedTermEn> means a permit issued pursuant to section 27; (<DefinedTermFr>permis de catégorie B</DefinedTermFr>)</Text></Definition><Definition generate-in-text="no" Code="se=&quot;2&quot;,df=&quot;{crossing}{passage}&quot;"><Text><DefinedTermEn>crossing</DefinedTermEn> means any bridge, causeway or structure or any embankment, cutting, excavation, land clearing or other works used or intended to be used to enable persons, vehicles or machinery to cross any stream, highway or road; (<DefinedTermFr>passage</DefinedTermFr>)</Text></Definition><Definition generate-in-text="no" Code="se=&quot;2&quot;,df=&quot;{district oil and gas conservation engineer}{ingénieur de district pour la conservation du pétrole et du gaz}&quot;"><Text><DefinedTermEn>district oil and gas conservation engineer</DefinedTermEn> means a conservation engineer appointed pursuant to the <XRefExternal reference-type="act">Oil and Gas Production and Conservation Act</XRefExternal>; (<DefinedTermFr>ingénieur de district pour la conservation du pétrole et du gaz</DefinedTermFr>)</Text></Definition><Definition generate-in-text="no" Code="se=&quot;2&quot;,df=&quot;{Dominion Geodesist}{géodésien fédéral}&quot;"><Text><DefinedTermEn>Dominion Geodesist</DefinedTermEn> means the Dominion Geodesist and Director of the Geodetic Survey, in the Department of Energy, Mines and Resources; (<DefinedTermFr>géodésien fédéral</DefinedTermFr>)</Text></Definition><Definition generate-in-text="no" Code="se=&quot;2&quot;,df=&quot;{engineer}{ingénieur}&quot;"><Text><DefinedTermEn>engineer</DefinedTermEn> means, with respect to particular lands, the engineer designated by the Minister pursuant to section 4 to serve the area in which the lands are located; (<DefinedTermFr>ingénieur</DefinedTermFr>)</Text></Definition><Definition generate-in-text="no" Code="se=&quot;2&quot;,df=&quot;{geophysical survey}{levé géophysique}&quot;"><Text><DefinedTermEn>geophysical survey</DefinedTermEn> means any investigation carried out on the surface of the ground to determine the nature and structure of the subsurface; (<DefinedTermFr>levé géophysique</DefinedTermFr>)</Text></Definition><Definition generate-in-text="no" Code="se=&quot;2&quot;,df=&quot;{inspector}{inspecteur}&quot;"><Text><DefinedTermEn>inspector</DefinedTermEn> means an inspector designated by the Minister pursuant to section 5; (<DefinedTermFr>inspecteur</DefinedTermFr>)</Text></Definition><Definition generate-in-text="no" Code="se=&quot;2&quot;,df=&quot;{land use operation}{exploitation des terres}&quot;"><Text><DefinedTermEn>land use operation</DefinedTermEn> means any work or undertaking on territorial lands that requires a permit; (<DefinedTermFr>exploitation des terres</DefinedTermFr>)</Text></Definition><Definition generate-in-text="no" Code="se=&quot;2&quot;,df=&quot;{letter of clearance}{lettre d’acquittement}&quot;"><Text><DefinedTermEn>letter of clearance</DefinedTermEn> means a letter issued by the engineer pursuant to section 37; (<DefinedTermFr>lettre d’acquittement</DefinedTermFr>)</Text></Definition><Definition generate-in-text="no" Code="se=&quot;2&quot;,df=&quot;{line}{ligne de levé}&quot;"><Text><DefinedTermEn>line</DefinedTermEn> means a route used to give surface access to any land for the purpose of carrying out a geophysical, geological or engineering survey; (<DefinedTermFr>ligne de levé</DefinedTermFr>)</Text></Definition><Definition generate-in-text="no" Code="se=&quot;2&quot;,df=&quot;{man-day}{jour-homme}&quot;"><Text><DefinedTermEn>man-day</DefinedTermEn>, with respect to the use of a campsite, means the use of that campsite by one person for 24 hours; (<DefinedTermFr>jour-homme</DefinedTermFr>)</Text></Definition><Definition generate-in-text="no" Code="se=&quot;2&quot;,df=&quot;{Minister}{ministre}&quot;"><Text><DefinedTermEn>Minister</DefinedTermEn> means the Minister of Indian Affairs and Northern Development; (<DefinedTermFr>ministre</DefinedTermFr>)</Text></Definition><Definition generate-in-text="no" Code="se=&quot;2&quot;,df=&quot;{monument}{borne-signal}&quot;"><Text><DefinedTermEn>monument</DefinedTermEn> means any post, stake, peg, mound, pit, trench or any other object, thing or device used to officially mark the boundary of any surveyed lands, or placed or established for any topographic, geodetic or cadastral purpose; (<DefinedTermFr>borne-signal</DefinedTermFr>)</Text></Definition><Definition generate-in-text="no" Code="se=&quot;2&quot;,df=&quot;{permit}{permis}&quot;"><Text><DefinedTermEn>permit</DefinedTermEn> means a Class A Permit or a Class B Permit; (<DefinedTermFr>permis</DefinedTermFr>)</Text></Definition><Definition generate-in-text="no" Code="se=&quot;2&quot;,df=&quot;{permittee}{détenteur de permis}&quot;"><Text><DefinedTermEn>permittee</DefinedTermEn> means the holder of a permit and includes a person engaged in a land use operation or anyone employed by a permittee to conduct a land use operation; (<DefinedTermFr>détenteur de permis</DefinedTermFr>)</Text></Definition><Definition generate-in-text="no" Code="se=&quot;2&quot;,df=&quot;{rig release date}{date de renvoi de l’équipe}&quot;"><Text><DefinedTermEn>rig release date</DefinedTermEn> means the date on which, in the opinion of a district oil and gas conservation engineer, a well drilled for the purpose of discovering or producing oil and gas has been properly terminated; (<DefinedTermFr>date de renvoi de l’équipe</DefinedTermFr>)</Text></Definition><Definition generate-in-text="no" Code="se=&quot;2&quot;,df=&quot;{rock trenching}{forage dans le roc}&quot;"><Text><DefinedTermEn>rock trenching</DefinedTermEn> means any excavation carried out on a mineral claim for the purpose of obtaining geological information; (<DefinedTermFr>forage dans le roc</DefinedTermFr>)</Text></Definition><Definition generate-in-text="no" Code="se=&quot;2&quot;,df=&quot;{spud-in}{percée}&quot;"><Text><DefinedTermEn>spud-in</DefinedTermEn> means the initial penetration of the ground for the purpose of drilling an oil or gas well; (<DefinedTermFr>percée</DefinedTermFr>)</Text></Definition><Definition generate-in-text="no" Code="se=&quot;2&quot;,df=&quot;{stream}{cours d’eau}&quot;"><Text><DefinedTermEn>stream</DefinedTermEn> means any lake, river, pond, swamp, marsh, channel, gully, coulee or draw that continuously or intermittently contains water; (<DefinedTermFr>cours d’eau</DefinedTermFr>)</Text></Definition><Definition generate-in-text="no" Code="se=&quot;2&quot;,df=&quot;{Surveyor General}{arpenteur général}&quot;"><Text><DefinedTermEn>Surveyor General</DefinedTermEn> means the Surveyor General as defined in the <XRefExternal reference-type="act" link="L-6">Canada Lands Surveys Act</XRefExternal>; (<DefinedTermFr>arpenteur général</DefinedTermFr>)</Text></Definition><Definition generate-in-text="no" Code="se=&quot;2&quot;,df=&quot;{territorial lands}{terres territoriales}&quot;"><Text><DefinedTermEn>territorial lands</DefinedTermEn> means lands in the Northwest Territories that are vested in the Crown or of which the Government of Canada has power to dispose and that are under the control, management and administration of the Minister. (<DefinedTermFr>terres territoriales</DefinedTermFr>) </Text></Definition><HistoricalNote><ul><li>SOR/88-169, s. 1;</li><li> 1998, c. 14, s. 101(F);</li><li> SOR/2003-126, s. 5.</li></ul></HistoricalNote></Section><Heading Code="ga=&quot;s_3&quot;,h1=&quot;&quot;" level="1"><TitleText Code="ga=&quot;s_3&quot;,h1=&quot;&quot;,t1=&quot;&quot;,nb=&quot;1&quot;">ESTABLISHMENT OF LAND MANAGEMENT ZONES</TitleText></Heading><Section Code="se=&quot;3&quot;"><Label>3.</Label><Text>The Northwest Territories is hereby set apart and appropriated as a land management zone.</Text><HistoricalNote><ul><li>SOR/2003-126, s. 6.</li></ul></HistoricalNote></Section><Heading Code="ga=&quot;s_4&quot;,h1=&quot;&quot;" level="1"><TitleText Code="ga=&quot;s_4&quot;,h1=&quot;&quot;,t1=&quot;&quot;,nb=&quot;1&quot;">DESIGNATION OF ENGINEERS</TitleText><HistoricalNote>[SOR/82-217, s. 1]</HistoricalNote></Heading><Section Code="se=&quot;4&quot;"><Label>4.</Label><Text>The Minister may designate any officer of the Department of Indian Affairs and Northern Development as an engineer for the purposes of these Regulations.</Text><HistoricalNote><ul><li>SOR/82-217, s. 1;</li><li> SOR/88-169, s. 2.</li></ul></HistoricalNote></Section><Heading Code="ga=&quot;s_5&quot;,h1=&quot;&quot;" level="1"><TitleText Code="ga=&quot;s_5&quot;,h1=&quot;&quot;,t1=&quot;&quot;,nb=&quot;1&quot;">DESIGNATION OF INSPECTORS</TitleText></Heading><Section Code="se=&quot;5&quot;"><Label>5.</Label><Text>The Minister may designate any person as an inspector for the purposes of these Regulations.</Text></Section><Heading Code="ga=&quot;s_6&quot;,h1=&quot;&quot;" level="1"><TitleText Code="ga=&quot;s_6&quot;,h1=&quot;&quot;,t1=&quot;&quot;,nb=&quot;1&quot;">EXEMPTION FROM REGULATIONS</TitleText></Heading><Section Code="se=&quot;6&quot;"><Label>6.</Label><Text>These Regulations do not apply to</Text><Paragraph Code="se=&quot;6&quot;,p1=&quot;a&quot;"><Label>(<Emphasis style="italic">a</Emphasis>)</Label><Text>anything done by a resident of the Northwest Territories in the normal course of hunting, fishing or trapping;</Text></Paragraph><Paragraph Code="se=&quot;6&quot;,p1=&quot;b&quot;"><Label>(<Emphasis style="italic">b</Emphasis>)</Label><Text>anything done in the course of prospecting, staking or locating a mineral claim unless it requires a use of equipment or material that normally requires a permit;</Text></Paragraph><Paragraph Code="se=&quot;6&quot;,p1=&quot;c&quot;"><Label>(<Emphasis style="italic">c</Emphasis>)</Label><Text>lands whose surface rights have all been disposed of by the Minister; and</Text></Paragraph><Paragraph Code="se=&quot;6&quot;,p1=&quot;d)&quot;"><Label>(<Emphasis style="italic">d</Emphasis>) and (<Emphasis style="italic">e</Emphasis>)</Label><Text><Repealed>[Repealed, SOR/2003-126, s. 7]</Repealed></Text></Paragraph><Paragraph Code="se=&quot;6&quot;,p1=&quot;f&quot;"><Label>(<Emphasis style="italic">f</Emphasis>)</Label><Text>land-use operations in the Mackenzie Valley, as that area is defined in section 2 of the <XRefExternal reference-type="act" link="M-0.2">Mackenzie Valley Resource Management Act</XRefExternal>, other than</Text><Subparagraph Code="se=&quot;6&quot;,p1=&quot;f&quot;,p2=&quot;i&quot;"><Label>(i)</Label><Text>a land-use operation authorized by a permit issued under these Regulations prior to the coming into force of Part 3 of that Act,</Text></Subparagraph><Subparagraph Code="se=&quot;6&quot;,p1=&quot;f&quot;,p2=&quot;ii&quot;"><Label>(ii)</Label><Text>a land-use operation for which an application for a permit under these Regulations was pending on the coming into force of Part 3 of that Act, and</Text></Subparagraph><Subparagraph Code="se=&quot;6&quot;,p1=&quot;f&quot;,p2=&quot;iii&quot;"><Label>(iii)</Label><Text>a land-use operation in respect of which an application is made under section 156 of that Act.</Text></Subparagraph></Paragraph><HistoricalNote><ul><li>SOR/88-169, s. 3;</li><li> SOR/98-430, s. 1;</li><li> SOR/2003-126, s. 7.</li></ul></HistoricalNote></Section><Section Code="se=&quot;7&quot;"><Label>7.</Label><Text>No person shall engage in a land use operation except in accordance with these Regulations and the <XRefExternal reference-type="act">Northern Inland Waters Act</XRefExternal> and regulations made thereunder.</Text></Section><Heading Code="ga=&quot;s_8&quot;,h1=&quot;&quot;" level="1"><TitleText Code="ga=&quot;s_8&quot;,h1=&quot;&quot;,t1=&quot;&quot;,nb=&quot;1&quot;">PROHIBITIONS</TitleText></Heading><Section Code="se=&quot;8&quot;"><Label>8.</Label><Text>No person shall, without a Class A Permit, carry on any work or undertaking on territorial lands that involves</Text><Paragraph Code="se=&quot;8&quot;,p1=&quot;a&quot;"><Label>(<Emphasis style="italic">a</Emphasis>)</Label><Text>the use, in any 30-day period, of more than 150 kg of explosives;</Text></Paragraph><Paragraph Code="se=&quot;8&quot;,p1=&quot;b&quot;"><Label>(<Emphasis style="italic">b</Emphasis>)</Label><Text>the use, except on a public road or trail maintained wholly or in part by federal funds, of any vehicle that exceeds 10 t net vehicle weight;</Text></Paragraph><Paragraph Code="se=&quot;8&quot;,p1=&quot;c&quot;"><Label>(<Emphasis style="italic">c</Emphasis>)</Label><Text>the use of any power driven machinery for earth drilling purposes whose operating weight, excluding the weight of drill rods or stems, bits, pumps and other ancillary equipment, exceeds 2.5 t;</Text></Paragraph><Paragraph Code="se=&quot;8&quot;,p1=&quot;d&quot;"><Label>(<Emphasis style="italic">d</Emphasis>)</Label><Text>the establishment of any campsite that is to be used for more than 400 man-days;</Text></Paragraph><Paragraph Code="se=&quot;8&quot;,p1=&quot;e&quot;"><Label>(<Emphasis style="italic">e</Emphasis>)</Label><Text>the establishment of any petroleum fuel storage facility exceeding 80 000 <Emphasis style="italic">l</Emphasis> capacity or the use of a single container for the storage of petroleum fuel that has a capacity exceeding 4 000 <Emphasis style="italic">l</Emphasis>;</Text></Paragraph><Paragraph Code="se=&quot;8&quot;,p1=&quot;f&quot;"><Label>(<Emphasis style="italic">f</Emphasis>)</Label><Text>the use of any self-propelled power driven machine for moving earth or clearing land of vegetation;</Text></Paragraph><Paragraph Code="se=&quot;8&quot;,p1=&quot;g&quot;"><Label>(<Emphasis style="italic">g</Emphasis>)</Label><Text>the use of any stationary power driven machine for hydraulic prospecting, moving earth or clearing land, other than a power saw; or</Text></Paragraph><Paragraph Code="se=&quot;8&quot;,p1=&quot;h&quot;"><Label>(<Emphasis style="italic">h</Emphasis>)</Label><Text>the levelling, grading, clearing, cutting or snowploughing of any line, trail or right-of-way exceeding 1.5 m in width and exceeding 4 ha in area.</Text></Paragraph></Section><Section Code="se=&quot;9&quot;"><Label>9.</Label><Text>No person shall, without a Class B Permit, carry on any work or undertaking on territorial lands that involves</Text><Paragraph Code="se=&quot;9&quot;,p1=&quot;a&quot;"><Label>(<Emphasis style="italic">a</Emphasis>)</Label><Text>the use, in any 30-day period, of more than 50 kg but less than 150 kg of explosives;</Text></Paragraph><Paragraph Code="se=&quot;9&quot;,p1=&quot;b&quot;"><Label>(<Emphasis style="italic">b</Emphasis>)</Label><Text>the use, except on a public road or trail maintained wholly or in part by federal funds, of any vehicle that is more than 5 t but less than 10 t net vehicle weight, or the use of any vehicle of any weight that exerts pressure on the ground in excess of 35 k pa;</Text></Paragraph><Paragraph Code="se=&quot;9&quot;,p1=&quot;c&quot;"><Label>(<Emphasis style="italic">c</Emphasis>)</Label><Text>the use of any power driven machinery for earth drilling purposes whose operating weight, excluding the weight of drill rods or stems and bits, pumps and other ancillary equipment, is more than 500 kg but less than 2.5 t;</Text></Paragraph><Paragraph Code="se=&quot;9&quot;,p1=&quot;d&quot;"><Label>(<Emphasis style="italic">d</Emphasis>)</Label><Text>the establishment of any campsite that is to be used by more than two people for more than 100 but less than 400 man-days;</Text></Paragraph><Paragraph Code="se=&quot;9&quot;,p1=&quot;e&quot;"><Label>(<Emphasis style="italic">e</Emphasis>)</Label><Text>the establishment of any petroleum fuel storage facility that has a capacity of more than 4 000 <Emphasis style="italic">l</Emphasis> but less than 80 000 <Emphasis style="italic">l</Emphasis> or the use of a single container for the storage of petroleum fuel that has a capacity of more than 2 000 <Emphasis style="italic">l</Emphasis> but less than 4 000 <Emphasis style="italic">l</Emphasis>; or</Text></Paragraph><Paragraph Code="se=&quot;9&quot;,p1=&quot;f&quot;"><Label>(<Emphasis style="italic">f</Emphasis>)</Label><Text>the levelling, grading, clearing, cutting or snowploughing of any line, trail or right-of-way exceeding 1.5 m in width but not exceeding 4 ha in area.</Text></Paragraph></Section><Section Code="se=&quot;10&quot;"><Label>10.</Label><Text>No permittee shall, unless expressly authorized in his permit or expressly authorized in writing by an inspector,</Text><Paragraph Code="se=&quot;10&quot;,p1=&quot;a&quot;"><Label>(<Emphasis style="italic">a</Emphasis>)</Label><Text>conduct a land use operation within 30 m of a known monument or a known or suspected archaeological site or burial ground;</Text></Paragraph><Paragraph Code="se=&quot;10&quot;,p1=&quot;b&quot;"><Label>(<Emphasis style="italic">b</Emphasis>)</Label><Text>when excavating territorial land within 100 m of any stream, excavate at a point that is below the normal high water mark of that stream;</Text></Paragraph><Paragraph Code="se=&quot;10&quot;,p1=&quot;c&quot;"><Label>(<Emphasis style="italic">c</Emphasis>)</Label><Text>deposit on the bed of any stream any excavated material; or</Text></Paragraph><Paragraph Code="se=&quot;10&quot;,p1=&quot;d&quot;"><Label>(<Emphasis style="italic">d</Emphasis>)</Label><Text>when placing a fuel or supply cache within 100 m of any stream, place the fuel or supply cache below the normal high water mark of that stream.</Text></Paragraph></Section><Heading Code="ga=&quot;s_11&quot;,h1=&quot;&quot;" level="1"><TitleText Code="ga=&quot;s_11&quot;,h1=&quot;&quot;,t1=&quot;&quot;,nb=&quot;1&quot;">SMALL FUEL CACHES</TitleText></Heading><Section Code="se=&quot;11&quot;"><Label>11.</Label><Text>Every person who establishes a fuel cache of more than 400 <Emphasis style="italic">l</Emphasis> and less than 4 000 <Emphasis style="italic">l</Emphasis> on territorial land for which a permit is not required shall, within 30 days of the establishment thereof, notify the engineer in writing, giving details of the cache including the amount and type of fuel, size of containers and method of storage and proposed date of removal of the cache.</Text><HistoricalNote><ul><li>SOR/88-169, s. 6(E).</li></ul></HistoricalNote></Section><Heading Code="ga=&quot;s_12&quot;,h1=&quot;&quot;" level="1"><TitleText Code="ga=&quot;s_12&quot;,h1=&quot;&quot;,t1=&quot;&quot;,nb=&quot;1&quot;">EXCAVATION</TitleText></Heading><Section Code="se=&quot;12&quot;"><Label>12.</Label><Text>Subject to the terms and conditions of his permit or the express written authority of an inspector, every permittee shall replace all materials removed by him in the course of excavating, other than rock trenching, and shall level and compact the area of the excavation.</Text></Section><Heading Code="ga=&quot;s_13&quot;,h1=&quot;&quot;" level="1"><TitleText Code="ga=&quot;s_13&quot;,h1=&quot;&quot;,t1=&quot;&quot;,nb=&quot;1&quot;">WATER CROSSINGS</TitleText></Heading><Section Code="se=&quot;13&quot;"><Label>13.</Label><Subsection Code="se=&quot;13&quot;,ss=&quot;1&quot;"><Label>(1)</Label><Text>Subject to the terms and conditions of his permit or the express written authority of an inspector, every permittee shall</Text><Paragraph Code="se=&quot;13&quot;,ss=&quot;1&quot;,p1=&quot;a&quot;"><Label>(<Emphasis style="italic">a</Emphasis>)</Label><Text>remove any material or debris deposited in any stream in the course of a land use operation, whether for the purpose of constructing a crossing or otherwise, and</Text></Paragraph><Paragraph Code="se=&quot;13&quot;,ss=&quot;1&quot;,p1=&quot;b&quot;"><Label>(<Emphasis style="italic">b</Emphasis>)</Label><Text>restore the channel and bed of the stream to their original alignment and cross-section,</Text></Paragraph><ContinuedSectionSubsection><Text>prior to the completion of the land use operation or prior to the commencement of spring break-up, whichever occurs first.</Text></ContinuedSectionSubsection></Subsection><Subsection Code="se=&quot;13&quot;,ss=&quot;2&quot;"><Label>(2)</Label><Text>Subsection (1) shall not be deemed to permit any person to deposit any material or debris in a stream contrary to the <XRefExternal reference-type="act">Northern Inland Waters Act</XRefExternal> or the <XRefExternal reference-type="act" link="F-14">Fisheries Act</XRefExternal> or any regulations made under those Acts.</Text></Subsection></Section><Heading Code="ga=&quot;s_14&quot;,h1=&quot;&quot;" level="1"><TitleText Code="ga=&quot;s_14&quot;,h1=&quot;&quot;,t1=&quot;&quot;,nb=&quot;1&quot;">CLEARING OF LINES, TRAILS OR RIGHTS-OF-WAY</TitleText></Heading><Section Code="se=&quot;14&quot;"><Label>14.</Label><Subsection Code="se=&quot;14&quot;,ss=&quot;1&quot;"><Label>(1)</Label><Text>Unless expressly authorized in a permit, no permittee shall</Text><Paragraph Code="se=&quot;14&quot;,ss=&quot;1&quot;,p1=&quot;a&quot;"><Label>(<Emphasis style="italic">a</Emphasis>)</Label><Text>clear a new line, trail or right-of-way where there is an existing line, trail or right-of-way that he can use;</Text></Paragraph><Paragraph Code="se=&quot;14&quot;,ss=&quot;1&quot;,p1=&quot;b&quot;"><Label>(<Emphasis style="italic">b</Emphasis>)</Label><Text>clear a line, trail or right-of-way wider than 10 m; or</Text></Paragraph><Paragraph Code="se=&quot;14&quot;,ss=&quot;1&quot;,p1=&quot;c&quot;"><Label>(<Emphasis style="italic">c</Emphasis>)</Label><Text>while clearing a line, trail or right-of-way, leave leaners or debris in standing timber.</Text></Paragraph></Subsection><Subsection Code="se=&quot;14&quot;,ss=&quot;2&quot;"><Label>(2)</Label><Text>Where, in the opinion of an inspector, serious erosion may result from a land use operation, the permittee shall adopt such measures to control erosion as may be required by the inspector.</Text></Subsection></Section><Heading Code="ga=&quot;s_15&quot;,h1=&quot;&quot;" level="1"><TitleText Code="ga=&quot;s_15&quot;,h1=&quot;&quot;,t1=&quot;&quot;,nb=&quot;1&quot;">MONUMENTS</TitleText></Heading><Section Code="se=&quot;15&quot;"><Label>15.</Label><Subsection Code="se=&quot;15&quot;,ss=&quot;1&quot;"><Label>(1)</Label><Text>Where a boundary monument is damaged, destroyed, moved or altered in the course of a land use operation, the permittee shall</Text><Paragraph Code="se=&quot;15&quot;,ss=&quot;1&quot;,p1=&quot;a&quot;"><Label>(<Emphasis style="italic">a</Emphasis>)</Label><Text>report the fact immediately to the Surveyor General and pay to the Surveyor General the costs of</Text><Subparagraph Code="se=&quot;15&quot;,ss=&quot;1&quot;,p1=&quot;a&quot;,p2=&quot;i&quot;"><Label>(i)</Label><Text>investigating such damage, destruction, movement or alteration, and</Text></Subparagraph><Subparagraph Code="se=&quot;15&quot;,ss=&quot;1&quot;,p1=&quot;a&quot;,p2=&quot;ii&quot;"><Label>(ii)</Label><Text>restoring or re-establishing the monument to its original condition or its original place; or</Text></Subparagraph></Paragraph><Paragraph Code="se=&quot;15&quot;,ss=&quot;1&quot;,p1=&quot;b&quot;"><Label>(<Emphasis style="italic">b</Emphasis>)</Label><Text>with the prior written consent of the Surveyor General, cause the monument to be restored or re-established at his own expense.</Text></Paragraph></Subsection><Subsection Code="se=&quot;15&quot;,ss=&quot;2&quot;"><Label>(2)</Label><Text>Where a topographic or geodetic monument is damaged, destroyed or altered in the course of a land use operation, the permittee shall</Text><Paragraph Code="se=&quot;15&quot;,ss=&quot;2&quot;,p1=&quot;a&quot;"><Label>(<Emphasis style="italic">a</Emphasis>)</Label><Text>report the fact immediately to the Dominion Geodesist, and pay to the Dominion Geodesist the costs described in subparagraphs (1)(<Emphasis style="italic">a</Emphasis>)(i) and (ii); or</Text></Paragraph><Paragraph Code="se=&quot;15&quot;,ss=&quot;2&quot;,p1=&quot;b&quot;"><Label>(<Emphasis style="italic">b</Emphasis>)</Label><Text>with the prior written consent of the Dominion Geodesist, cause the monument to be restored or re-established at his own expense.</Text></Paragraph></Subsection><Subsection Code="se=&quot;15&quot;,ss=&quot;3&quot;"><Label>(3)</Label><Text>The restoration or re-establishment of a monument pursuant to subsection (1) or (2) shall be carried out in accordance with instructions from the Surveyor General or Dominion Geodesist, as the case may be.</Text></Subsection><HistoricalNote><ul><li>1998, c. 14, s. 101(F).</li></ul></HistoricalNote></Section><Heading Code="ga=&quot;s_16&quot;,h1=&quot;&quot;" level="1"><TitleText Code="ga=&quot;s_16&quot;,h1=&quot;&quot;,t1=&quot;&quot;,nb=&quot;1&quot;">ARCHAEOLOGICAL SITES</TitleText></Heading><Section Code="se=&quot;16&quot;"><Label>16.</Label><Text>Where, in the course of a land use operation, a suspected archaeological site or burial ground is unearthed or otherwise discovered, the permittee shall immediately</Text><Paragraph Code="se=&quot;16&quot;,p1=&quot;a&quot;"><Label>(<Emphasis style="italic">a</Emphasis>)</Label><Text>suspend the land use operation on the site; and</Text></Paragraph><Paragraph Code="se=&quot;16&quot;,p1=&quot;b&quot;"><Label>(<Emphasis style="italic">b</Emphasis>)</Label><Text>notify the engineer or an inspector of the location of the site and the nature of any unearthed materials, structures or artifacts.</Text></Paragraph><HistoricalNote><ul><li>SOR/88-169, s. 6(E).</li></ul></HistoricalNote></Section><Heading Code="ga=&quot;s_17&quot;,h1=&quot;&quot;" level="1"><TitleText Code="ga=&quot;s_17&quot;,h1=&quot;&quot;,t1=&quot;&quot;,nb=&quot;1&quot;">CAMPSITES</TitleText></Heading><Section Code="se=&quot;17&quot;"><Label>17.</Label><Subsection Code="se=&quot;17&quot;,ss=&quot;1&quot;"><Label>(1)</Label><Text>Subject to the terms and conditions of his permit, every permittee shall dispose of all garbage, waste and debris from any campsite used in connection with a land use operation by removal, burning or burial or by such other method as may be directed by an inspector.</Text></Subsection><Subsection Code="se=&quot;17&quot;,ss=&quot;2&quot;"><Label>(2)</Label><Text>Sanitary sewage produced in connection with land use operations shall be disposed of in accordance with the <XRefExternal reference-type="act">Public Health Act</XRefExternal>, R.S.N.W.T. 1988, c. P-12, and any regulations and orders made under that Act.</Text></Subsection><HistoricalNote><ul><li>SOR/2003-126, s. 8.</li></ul></HistoricalNote></Section><Heading Code="ga=&quot;s_18&quot;,h1=&quot;&quot;" level="1"><TitleText Code="ga=&quot;s_18&quot;,h1=&quot;&quot;,t1=&quot;&quot;,nb=&quot;1&quot;">RESTORATION OF PERMIT AREA</TitleText></Heading><Section Code="se=&quot;18&quot;"><Label>18.</Label><Text>Subject to the terms and conditions of his permit, every permittee shall, after completion of a land use operation, restore the permit area as nearly as possible to the same condition as it was prior to the commencement of the land use operation.</Text></Section><Heading Code="ga=&quot;s_19&quot;,h1=&quot;&quot;" level="1"><TitleText Code="ga=&quot;s_19&quot;,h1=&quot;&quot;,t1=&quot;&quot;,nb=&quot;1&quot;">REMOVAL OF BUILDINGS AND EQUIPMENT</TitleText></Heading><Section Code="se=&quot;19&quot;"><Label>19.</Label><Subsection Code="se=&quot;19&quot;,ss=&quot;1&quot;"><Label>(1)</Label><Text>Subject to subsections (2) and (3), every permittee shall, on completion of a land use operation, remove all buildings, machinery, equipment, materials and fuel drums or other storage containers used in connection with the land use operation.</Text></Subsection><Subsection Code="se=&quot;19&quot;,ss=&quot;2&quot;"><Label>(2)</Label><Text>A permittee may, with the prior written approval of the engineer, leave on territorial lands such buildings, equipment machinery and materials as the permittee deems may be required for future land use operations or other operations in the area, but any equipment, machinery or materials so left shall be stored in a manner, at a location and for a duration approved by the engineer.</Text></Subsection><Subsection Code="se=&quot;19&quot;,ss=&quot;3&quot;"><Label>(3)</Label><Text>Subject to any applicable mining legislation, a permittee may, without the prior approval of the engineer, leave diamond drill cores at a drill site on territorial lands.</Text></Subsection><HistoricalNote><ul><li>SOR/88-169, s. 6(E).</li></ul></HistoricalNote></Section><Heading Code="ga=&quot;s_20&quot;,h1=&quot;&quot;" level="1"><TitleText Code="ga=&quot;s_20&quot;,h1=&quot;&quot;,t1=&quot;&quot;,nb=&quot;1&quot;">EMERGENCIES</TitleText></Heading><Section Code="se=&quot;20&quot;"><Label>20.</Label><Text>Any person may, in an emergency that threatens life, property or natural environment, carry out such operation as he deems necessary to cope with the emergency, whether or not the operation is carried out in accordance with these Regulations or any permit that he may have and such person shall immediately thereafter send a written report to the engineer describing the duration, nature and extent of the operation.</Text><HistoricalNote><ul><li>SOR/88-169, s. 6(E).</li></ul></HistoricalNote></Section><Heading Code="ga=&quot;s_21&quot;,h1=&quot;&quot;" level="1"><TitleText Code="ga=&quot;s_21&quot;,h1=&quot;&quot;,t1=&quot;&quot;,nb=&quot;1&quot;">ELIGIBILITY FOR A PERMIT</TitleText></Heading><Section Code="se=&quot;21&quot;"><Label>21.</Label><Text>In order to be eligible for a permit, a person shall</Text><Paragraph Code="se=&quot;21&quot;,p1=&quot;a&quot;"><Label>(<Emphasis style="italic">a</Emphasis>)</Label><Text>where a right to search for, win or exploit minerals or natural resources is to be exercised by the carrying out of the land use operation authorized by the permit, be</Text><Subparagraph Code="se=&quot;21&quot;,p1=&quot;a&quot;,p2=&quot;i&quot;"><Label>(i)</Label><Text>the holder of that right,</Text></Subparagraph><Subparagraph Code="se=&quot;21&quot;,p1=&quot;a&quot;,p2=&quot;ii&quot;"><Label>(ii)</Label><Text>the manager of operations, where there is more than one holder of that right and such holders have entered into an exploration or operating agreement designating one of them as manager of operations, or</Text></Subparagraph><Subparagraph Code="se=&quot;21&quot;,p1=&quot;a&quot;,p2=&quot;iii&quot;"><Label>(iii)</Label><Text>the person who contracts to have the land use operations carried out, where there is more than one holder of that right and they have not entered into an exploration or operating agreement designating one of them as manager of operations;</Text></Subparagraph></Paragraph><Paragraph Code="se=&quot;21&quot;,p1=&quot;b&quot;"><Label>(<Emphasis style="italic">b</Emphasis>)</Label><Text>where no right to search for, win or exploit minerals or natural resources is to be exercised by the carrying out of the land use operation authorized by the permit, be the person who contracts to have the land use operation carried out; or</Text></Paragraph><Paragraph Code="se=&quot;21&quot;,p1=&quot;c&quot;"><Label>(<Emphasis style="italic">c</Emphasis>)</Label><Text>in any case not provided for in paragraph (<Emphasis style="italic">a</Emphasis>) or (<Emphasis style="italic">b</Emphasis>), be the person who is to carry out the land use operation.</Text></Paragraph></Section><Heading Code="ga=&quot;s_22&quot;,h1=&quot;&quot;" level="1"><TitleText Code="ga=&quot;s_22&quot;,h1=&quot;&quot;,t1=&quot;&quot;,nb=&quot;1&quot;">APPLICATION FOR A PERMIT</TitleText></Heading><Section Code="se=&quot;22&quot;"><Label>22.</Label><Subsection Code="se=&quot;22&quot;,ss=&quot;1&quot;"><Label>(1)</Label><Text>Any person who, in accordance with section 21, is eligible for a permit may submit to the engineer, in duplicate, an application for a permit in a form approved by the Minister.</Text></Subsection><Subsection Code="se=&quot;22&quot;,ss=&quot;2&quot;"><Label>(2)</Label><Text>Every permit application submitted pursuant to subsection (1) shall be accompanied by the application fee set out in Schedule I, the land use fee set out in Schedule II and a preliminary plan showing</Text><Paragraph Code="se=&quot;22&quot;,ss=&quot;2&quot;,p1=&quot;a&quot;"><Label>(<Emphasis style="italic">a</Emphasis>)</Label><Text>the lands proposed to be used and an estimate of their area; and</Text></Paragraph><Paragraph Code="se=&quot;22&quot;,ss=&quot;2&quot;,p1=&quot;b&quot;"><Label>(<Emphasis style="italic">b</Emphasis>)</Label><Text>the approximate location of all</Text><Subparagraph Code="se=&quot;22&quot;,ss=&quot;2&quot;,p1=&quot;b&quot;,p2=&quot;i&quot;"><Label>(i)</Label><Text>existing lines, trails, rights-of-way and cleared areas proposed to be used in the land use operation,</Text></Subparagraph><Subparagraph Code="se=&quot;22&quot;,ss=&quot;2&quot;,p1=&quot;b&quot;,p2=&quot;ii&quot;"><Label>(ii)</Label><Text>new lines, trails, rights-of-way and cleared areas proposed to be used in the land use operation,</Text></Subparagraph><Subparagraph Code="se=&quot;22&quot;,ss=&quot;2&quot;,p1=&quot;b&quot;,p2=&quot;iii&quot;"><Label>(iii)</Label><Text>buildings, campsites, air landing strips, air navigation aids, fuel and supply storage sites, waste disposal sites, excavations and other works and places proposed to be constructed or used during the land use operation, and</Text></Subparagraph><Subparagraph Code="se=&quot;22&quot;,ss=&quot;2&quot;,p1=&quot;b&quot;,p2=&quot;iv&quot;"><Label>(iv)</Label><Text>bridges, dams, ditches, railroads, highways and roads, transmission lines, pipelines, survey lines and monuments, air landing strips, streams and all other features, structures or works that, in the opinion of the applicant, may be affected by the land use operation.</Text></Subparagraph></Paragraph></Subsection><Subsection Code="se=&quot;22&quot;,ss=&quot;3&quot;"><Label>(3)</Label><Text>For the purpose of calculating the land use fee payable where territorial lands are proposed to be used for a line, trail or right-of-way, the width of the line, trail or right-of-way shall, unless otherwise specified by the engineer in the permit, be deemed to be 10 m.</Text></Subsection><HistoricalNote><ul><li>SOR/88-169, s. 6(E);</li><li> SOR/96-113, s. 1.</li></ul></HistoricalNote></Section><Section Code="se=&quot;23&quot;"><Label>23.</Label><Subsection Code="se=&quot;23&quot;,ss=&quot;1&quot;"><Label>(1)</Label><Text>The engineer may, before issuing a permit,</Text><Paragraph Code="se=&quot;23&quot;,ss=&quot;1&quot;,p1=&quot;a&quot;"><Label>(<Emphasis style="italic">a</Emphasis>)</Label><Text>order an inspection of the lands proposed to be used thereunder; and</Text></Paragraph><Paragraph Code="se=&quot;23&quot;,ss=&quot;1&quot;,p1=&quot;b&quot;"><Label>(<Emphasis style="italic">b</Emphasis>)</Label><Text>require an applicant for a permit to provide him with such information and data concerning the proposed use of the lands and the physical and biological characteristics thereof as will enable the engineer to evaluate any quantitative and qualitative effects of the proposed land use operation.</Text></Paragraph></Subsection><Subsection Code="se=&quot;23&quot;,ss=&quot;2&quot;"><Label>(2)</Label><Text>Where an inspector makes an inspection pursuant to an order of the engineer under paragraph (1)(<Emphasis style="italic">a</Emphasis>), he shall investigate and report to the engineer particulars of</Text><Paragraph Code="se=&quot;23&quot;,ss=&quot;2&quot;,p1=&quot;a&quot;"><Label>(<Emphasis style="italic">a</Emphasis>)</Label><Text>the existing biological and physical characteristics of the lands proposed to be used and the surrounding lands;</Text></Paragraph><Paragraph Code="se=&quot;23&quot;,ss=&quot;2&quot;,p1=&quot;b&quot;"><Label>(<Emphasis style="italic">b</Emphasis>)</Label><Text>any disturbance that the proposed land use operation may cause on the lands proposed to be used and the surrounding lands and the biological characteristics thereof; and</Text></Paragraph><Paragraph Code="se=&quot;23&quot;,ss=&quot;2&quot;,p1=&quot;c&quot;"><Label>(<Emphasis style="italic">c</Emphasis>)</Label><Text>the manner in which the disturbance referred to in paragraph (<Emphasis style="italic">b</Emphasis>) may be minimized and controlled.</Text></Paragraph></Subsection><Subsection Code="se=&quot;23&quot;,ss=&quot;3&quot;"><Label>(3)</Label><Text>The engineer may, where he deems it necessary or when requested to do so by an applicant, inform the applicant of the nature of an inspector’s report referred to in subsection (2).</Text></Subsection><HistoricalNote><ul><li>SOR/88-169, s. 6(E).</li></ul></HistoricalNote></Section><Section Code="se=&quot;24&quot;"><Label>24.</Label><Text>Where the engineer receives an application for a Class A Permit that is not made in accordance with these Regulations, he shall, within 10 days thereafter, notify the applicant in writing that his application cannot be accepted and give the reasons therefor.</Text><HistoricalNote><ul><li>SOR/88-169, s. 6(E).</li></ul></HistoricalNote></Section><Section Code="se=&quot;25&quot;"><Label>25.</Label><Subsection Code="se=&quot;25&quot;,ss=&quot;1&quot;"><Label>(1)</Label><Text>The engineer shall, within 10 days after receipt of an application for a Class A Permit made in accordance with these Regulations,</Text><Paragraph Code="se=&quot;25&quot;,ss=&quot;1&quot;,p1=&quot;a&quot;"><Label>(<Emphasis style="italic">a</Emphasis>)</Label><Text>issue a Class A Permit subject to any terms and conditions he may include therein pursuant to subsection 31(1);</Text></Paragraph><Paragraph Code="se=&quot;25&quot;,ss=&quot;1&quot;,p1=&quot;b&quot;"><Label>(<Emphasis style="italic">b</Emphasis>)</Label><Text>notify the applicant that further time is required to issue a permit and give the reasons therefor;</Text></Paragraph><Paragraph Code="se=&quot;25&quot;,ss=&quot;1&quot;,p1=&quot;c&quot;"><Label>(<Emphasis style="italic">c</Emphasis>)</Label><Text>notify the applicant in writing that he has ordered further studies or investigations to be made respecting the lands proposed to be used and state the reasons therefor; or</Text></Paragraph><Paragraph Code="se=&quot;25&quot;,ss=&quot;1&quot;,p1=&quot;d&quot;"><Label>(<Emphasis style="italic">d</Emphasis>)</Label><Text>refuse to issue a permit and notify the applicant in writing of his refusal and the reasons therefor.</Text></Paragraph></Subsection><Subsection Code="se=&quot;25&quot;,ss=&quot;2&quot;"><Label>(2)</Label><Text>Where the engineer has notified an applicant that further time is required to issue a permit pursuant to paragraph (1)(<Emphasis style="italic">b</Emphasis>), he shall, within 42 days after the date of receipt of the application, comply with paragraph (1)(<Emphasis style="italic">a</Emphasis>), (<Emphasis style="italic">c</Emphasis>) or (<Emphasis style="italic">d</Emphasis>).</Text></Subsection><Subsection Code="se=&quot;25&quot;,ss=&quot;3&quot;"><Label>(3)</Label><Text>Where the engineer has notified an applicant that he has ordered further studies or investigations to be made pursuant to paragraph (1)(<Emphasis style="italic">c</Emphasis>), he shall, within 12 months after the date of receipt of the application, comply with paragraph (1)(<Emphasis style="italic">a</Emphasis>) or (<Emphasis style="italic">d</Emphasis>).</Text></Subsection><HistoricalNote><ul><li>SOR/88-169, s. 6(E).</li></ul></HistoricalNote></Section><Section Code="se=&quot;26&quot;"><Label>26.</Label><Text>Where the engineer receives an application for a Class B Permit that is not made in accordance with these Regulations, he shall, within three days thereafter, notify the applicant in writing that his application cannot be accepted and give the reasons therefor.</Text><HistoricalNote><ul><li>SOR/88-169, s. 6(E).</li></ul></HistoricalNote></Section><Section Code="se=&quot;27&quot;"><Label>27.</Label><Text>The engineer shall, within 10 days after receipt of an application for a Class B Permit made in accordance with these Regulations,</Text><Paragraph Code="se=&quot;27&quot;,p1=&quot;a&quot;"><Label>(<Emphasis style="italic">a</Emphasis>)</Label><Text>issue a Class B Permit subject to any terms and conditions he may include therein pursuant to subsection 31(1); or</Text></Paragraph><Paragraph Code="se=&quot;27&quot;,p1=&quot;b&quot;"><Label>(<Emphasis style="italic">b</Emphasis>)</Label><Text>refuse to issue a permit and notify the applicant in writing of his refusal and the reasons therefor.</Text></Paragraph><HistoricalNote><ul><li>SOR/88-169, s. 6(E).</li></ul></HistoricalNote></Section><Section Code="se=&quot;28&quot;"><Label>28.</Label><Text>The engineer may, where he deems it necessary, notify an applicant in writing that his application for a Class B Permit will be considered as an application for a Class A Permit.</Text><HistoricalNote><ul><li>SOR/88-169, s. 6(E).</li></ul></HistoricalNote></Section><Section Code="se=&quot;29&quot;"><Label>29.</Label><Text>The engineer shall assign a number to each permit that he issues.</Text><HistoricalNote><ul><li>SOR/88-169, s. 4.</li></ul></HistoricalNote></Section><Heading Code="ga=&quot;s_30&quot;,h1=&quot;&quot;" level="1"><TitleText Code="ga=&quot;s_30&quot;,h1=&quot;&quot;,t1=&quot;&quot;,nb=&quot;1&quot;">DISPLAY OF PERMIT</TitleText></Heading><Section Code="se=&quot;30&quot;"><Label>30.</Label><Text>Every permittee engaged in a work or an undertaking authorized by a permit shall display</Text><Paragraph Code="se=&quot;30&quot;,p1=&quot;a&quot;"><Label>(<Emphasis style="italic">a</Emphasis>)</Label><Text>an exact copy of the permit, including the conditions thereof, in such manner and at such places as the engineer may require; and</Text></Paragraph><Paragraph Code="se=&quot;30&quot;,p1=&quot;b&quot;"><Label>(<Emphasis style="italic">b</Emphasis>)</Label><Text>the number assigned to the permit on such articles and equipment, in such manner and at such places as the engineer may require.</Text></Paragraph><HistoricalNote><ul><li>SOR/88-169, s. 6(E).</li></ul></HistoricalNote></Section><Heading Code="ga=&quot;s_31&quot;,h1=&quot;&quot;" level="1"><TitleText Code="ga=&quot;s_31&quot;,h1=&quot;&quot;,t1=&quot;&quot;,nb=&quot;1&quot;">TERMS AND CONDITIONS OF PERMITS</TitleText></Heading><Section Code="se=&quot;31&quot;"><Label>31.</Label><Subsection Code="se=&quot;31&quot;,ss=&quot;1&quot;"><Label>(1)</Label><Text>The engineer may include in any permit terms and conditions respecting</Text><Paragraph Code="se=&quot;31&quot;,ss=&quot;1&quot;,p1=&quot;a&quot;"><Label>(<Emphasis style="italic">a</Emphasis>)</Label><Text>the location and the area of territorial lands that may be used;</Text></Paragraph><Paragraph Code="se=&quot;31&quot;,ss=&quot;1&quot;,p1=&quot;b&quot;"><Label>(<Emphasis style="italic">b</Emphasis>)</Label><Text>the times at which any work or undertaking may be carried on;</Text></Paragraph><Paragraph Code="se=&quot;31&quot;,ss=&quot;1&quot;,p1=&quot;c&quot;"><Label>(<Emphasis style="italic">c</Emphasis>)</Label><Text>the type and size of equipment that may be used in the land use operation;</Text></Paragraph><Paragraph Code="se=&quot;31&quot;,ss=&quot;1&quot;,p1=&quot;d&quot;"><Label>(<Emphasis style="italic">d</Emphasis>)</Label><Text>the methods and techniques to be employed by the permittee in carrying out the land use operation;</Text></Paragraph><Paragraph Code="se=&quot;31&quot;,ss=&quot;1&quot;,p1=&quot;e&quot;"><Label>(<Emphasis style="italic">e</Emphasis>)</Label><Text>the type, location, capacity and operation of all facilities to be used by the permittee in the land use operation;</Text></Paragraph><Paragraph Code="se=&quot;31&quot;,ss=&quot;1&quot;,p1=&quot;f&quot;"><Label>(<Emphasis style="italic">f</Emphasis>)</Label><Text>the methods of controlling or preventing ponding of water, flooding, erosion, slides and subsidences of land;</Text></Paragraph><Paragraph Code="se=&quot;31&quot;,ss=&quot;1&quot;,p1=&quot;g&quot;"><Label>(<Emphasis style="italic">g</Emphasis>)</Label><Text>the use, storage, handling and ultimate disposal of any chemical or toxic material to be used in the land use operation;</Text></Paragraph><Paragraph Code="se=&quot;31&quot;,ss=&quot;1&quot;,p1=&quot;h&quot;"><Label>(<Emphasis style="italic">h</Emphasis>)</Label><Text>the protection of wildlife and fisheries habitat;</Text></Paragraph><Paragraph Code="se=&quot;31&quot;,ss=&quot;1&quot;,p1=&quot;i&quot;"><Label>(<Emphasis style="italic">i</Emphasis>)</Label><Text>the protection of objects and places of recreational, scenic and ecological value;</Text></Paragraph><Paragraph Code="se=&quot;31&quot;,ss=&quot;1&quot;,p1=&quot;j&quot;"><Label>(<Emphasis style="italic">j</Emphasis>)</Label><Text>the deposit of security in accordance with section 36;</Text></Paragraph><Paragraph Code="se=&quot;31&quot;,ss=&quot;1&quot;,p1=&quot;k&quot;"><Label>(<Emphasis style="italic">k</Emphasis>)</Label><Text>the establishment of petroleum fuel storage facilities;</Text></Paragraph><Paragraph Code="se=&quot;31&quot;,ss=&quot;1&quot;,p1=&quot;l&quot;"><Label>(<Emphasis style="italic">l</Emphasis>)</Label><Text>the methods and techniques for debris and brush disposal; and</Text></Paragraph><Paragraph Code="se=&quot;31&quot;,ss=&quot;1&quot;,p1=&quot;m&quot;"><Label>(<Emphasis style="italic">m</Emphasis>)</Label><Text>such other matters not inconsistent with these Regulations as the engineer thinks necessary for the protection of the biological or physical characteristics of the land management zone.</Text></Paragraph></Subsection><Subsection Code="se=&quot;31&quot;,ss=&quot;2&quot;"><Label>(2)</Label><Text>The engineer may modify any of the terms or conditions included in a permit on receipt of a written request from the permittee that sets out</Text><Paragraph Code="se=&quot;31&quot;,ss=&quot;2&quot;,p1=&quot;a&quot;"><Label>(<Emphasis style="italic">a</Emphasis>)</Label><Text>the terms or conditions in the permit that the permittee wishes modified; and</Text></Paragraph><Paragraph Code="se=&quot;31&quot;,ss=&quot;2&quot;,p1=&quot;b&quot;"><Label>(<Emphasis style="italic">b</Emphasis>)</Label><Text>the nature of the modification proposed and the reasons therefor.</Text></Paragraph></Subsection><Subsection Code="se=&quot;31&quot;,ss=&quot;3&quot;"><Label>(3)</Label><Text>Where the engineer receives a written request from a permittee pursuant to subsection (2), he shall notify the permittee of his decision and the reasons therefor within 10 days of receipt of the request.</Text></Subsection><Subsection Code="se=&quot;31&quot;,ss=&quot;4&quot;"><Label>(4)</Label><Text>Every permit shall set out the period for which it is valid and such period shall be based on the estimated dates of commencement and completion as set out by the permittee in his application, but in no case shall a permit be valid for a period exceeding two years.</Text></Subsection><Subsection Code="se=&quot;31&quot;,ss=&quot;5&quot;"><Label>(5)</Label><Text>On receipt of a written request from a permittee for an extension of the duration of his permit, the engineer may extend the duration of the permit subject to such conditions not inconsistent with these Regulations as he thinks fit, for such period, not exceeding one year, as he thinks necessary to enable the permittee to complete the land use operation authorized by the permit.</Text></Subsection><HistoricalNote><ul><li>SOR/88-169, s. 6(E).</li></ul></HistoricalNote></Section><Heading Code="ga=&quot;s_32&quot;,h1=&quot;&quot;" level="1"><TitleText Code="ga=&quot;s_32&quot;,h1=&quot;&quot;,t1=&quot;&quot;,nb=&quot;1&quot;">REPORTS</TitleText></Heading><Section Code="se=&quot;32&quot;"><Label>32.</Label><Text>Every permittee shall submit to the inspector or engineer, in a form and on a date satisfactory to the inspector or engineer, such reports as are requested by the inspector or engineer, in order to ascertain the progress of the land use operation.</Text><HistoricalNote><ul><li>SOR/88-169, s. 6(E).</li></ul></HistoricalNote></Section><Heading Code="ga=&quot;s_33&quot;,h1=&quot;&quot;" level="1"><TitleText Code="ga=&quot;s_33&quot;,h1=&quot;&quot;,t1=&quot;&quot;,nb=&quot;1&quot;">FINAL PLAN</TitleText></Heading><Section Code="se=&quot;33&quot;"><Label>33.</Label><Subsection Code="se=&quot;33&quot;,ss=&quot;1&quot;"><Label>(1)</Label><Text>Every permittee shall, within 60 days after the completion of a land use operation or the expiry of his permit, whichever occurs first, submit a final plan in duplicate to the engineer showing</Text><Paragraph Code="se=&quot;33&quot;,ss=&quot;1&quot;,p1=&quot;a&quot;"><Label>(<Emphasis style="italic">a</Emphasis>)</Label><Text>the lands actually subjected to the land use operation;</Text></Paragraph><Paragraph Code="se=&quot;33&quot;,ss=&quot;1&quot;,p1=&quot;b&quot;"><Label>(<Emphasis style="italic">b</Emphasis>)</Label><Text>the location of</Text><Subparagraph Code="se=&quot;33&quot;,ss=&quot;1&quot;,p1=&quot;b&quot;,p2=&quot;i&quot;"><Label>(i)</Label><Text>lines, trails, rights-of-way and cleared areas that were used by the permittee during the land use operation, specifying those that were cleared by the permittee and those that existed before the land use operation began,</Text></Subparagraph><Subparagraph Code="se=&quot;33&quot;,ss=&quot;1&quot;,p1=&quot;b&quot;,p2=&quot;ii&quot;"><Label>(ii)</Label><Text>buildings, campsites, air landing strips, air navigation aids, fuel and supply storage sites, waste disposal sites, excavations and other works and places that were constructed or used by the permittee during the land use operation, and</Text></Subparagraph><Subparagraph Code="se=&quot;33&quot;,ss=&quot;1&quot;,p1=&quot;b&quot;,p2=&quot;iii&quot;"><Label>(iii)</Label><Text>bridges, dams, ditches, railroads, highways and roads, transmission lines, pipelines, survey lines and monuments, air landing strips, streams and all other features, structures or works that were affected by the land use operation; and</Text></Subparagraph></Paragraph><Paragraph Code="se=&quot;33&quot;,ss=&quot;1&quot;,p1=&quot;c&quot;"><Label>(<Emphasis style="italic">c</Emphasis>)</Label><Text>the calculations of the area of territorial lands used in the operation.</Text></Paragraph></Subsection><Subsection Code="se=&quot;33&quot;,ss=&quot;2&quot;"><Label>(2)</Label><Text>The final plan submitted to the engineer pursuant to subsection (1) shall be</Text><Paragraph Code="se=&quot;33&quot;,ss=&quot;2&quot;,p1=&quot;a&quot;"><Label>(<Emphasis style="italic">a</Emphasis>)</Label><Text>certified by the permittee or his agent authorized for the purpose as to the accuracy of</Text><Subparagraph Code="se=&quot;33&quot;,ss=&quot;2&quot;,p1=&quot;a&quot;,p2=&quot;i&quot;"><Label>(i)</Label><Text>locations, distances and areas, and</Text></Subparagraph><Subparagraph Code="se=&quot;33&quot;,ss=&quot;2&quot;,p1=&quot;a&quot;,p2=&quot;ii&quot;"><Label>(ii)</Label><Text>the representation of the land use operation; or</Text></Subparagraph></Paragraph><Paragraph Code="se=&quot;33&quot;,ss=&quot;2&quot;,p1=&quot;b&quot;"><Label>(<Emphasis style="italic">b</Emphasis>)</Label><Text>drawn from and accompanied by positive prints of vertical aerial photographs or aerial photomosaics showing the lands subjected to the land use operation.</Text></Paragraph></Subsection><Subsection Code="se=&quot;33&quot;,ss=&quot;3&quot;"><Label>(3)</Label><Text>On receipt of a written request from a permittee for an extension of the time for filing a final plan, the engineer may extend the time for filing the final plan by not more than 60 days.</Text></Subsection><Subsection Code="se=&quot;33&quot;,ss=&quot;4&quot;"><Label>(4)</Label><Text>The engineer shall reject the final plan if it does not comply with this section and section 35 and the permittee shall, within three weeks after receipt of written notice from the engineer of rejection of the plan, submit to the engineer another final plan that complies with this section and section 35.</Text></Subsection><Subsection Code="se=&quot;33&quot;,ss=&quot;5&quot;"><Label>(5)</Label><Text>Notwithstanding the expiry of a permit or the submission of a final plan, every permittee remains responsible for his obligations arising under the terms and conditions of the permit or under these Regulations until such time as the engineer issues a letter of clearance for the land use operation.</Text></Subsection><HistoricalNote><ul><li>SOR/88-169, s. 6(E).</li></ul></HistoricalNote></Section><Heading Code="ga=&quot;s_34&quot;,h1=&quot;&quot;" level="1"><TitleText Code="ga=&quot;s_34&quot;,h1=&quot;&quot;,t1=&quot;&quot;,nb=&quot;1&quot;">DETERMINATION OF LAND USE FEE</TitleText></Heading><Section Code="se=&quot;34&quot;"><Label>34.</Label><Subsection Code="se=&quot;34&quot;,ss=&quot;1&quot;"><Label>(1)</Label><Text>Within 30 days after the engineer has issued a letter of clearance, the permittee shall calculate the land use fee payable based on the actual area of land used in the operation and the engineer shall,</Text><Paragraph Code="se=&quot;34&quot;,ss=&quot;1&quot;,p1=&quot;a&quot;"><Label>(<Emphasis style="italic">a</Emphasis>)</Label><Text>where the land use fee submitted with the application is greater than the fee so calculated, refund the excess to the permittee; or</Text></Paragraph><Paragraph Code="se=&quot;34&quot;,ss=&quot;1&quot;,p1=&quot;b&quot;"><Label>(<Emphasis style="italic">b</Emphasis>)</Label><Text>where the land use fee submitted with the application is less than the fee so calculated, demand, by notice in writing to the permittee, payment of the deficiency.</Text></Paragraph></Subsection><Subsection Code="se=&quot;34&quot;,ss=&quot;2&quot;"><Label>(2)</Label><Text>Where an application for a permit is refused, the land use fee submitted with the application shall be refunded to the applicant.</Text></Subsection><Subsection Code="se=&quot;34&quot;,ss=&quot;3&quot;"><Label>(3)</Label><Text>No application fee shall be refunded.</Text></Subsection><HistoricalNote><ul><li>SOR/88-169, s. 6(E).</li></ul></HistoricalNote></Section><Heading Code="ga=&quot;s_35&quot;,h1=&quot;&quot;" level="1"><TitleText Code="ga=&quot;s_35&quot;,h1=&quot;&quot;,t1=&quot;&quot;,nb=&quot;1&quot;">LAND DIVISION AND PLANS</TitleText></Heading><Section Code="se=&quot;35&quot;"><Label>35.</Label><Text>Every preliminary plan or final plan submitted under these Regulations shall</Text><Paragraph Code="se=&quot;35&quot;,p1=&quot;a&quot;"><Label>(<Emphasis style="italic">a</Emphasis>)</Label><Text>be drawn to a scale that clearly shows the lands that the applicant for a permit proposes to use or the permittee has used;</Text></Paragraph><Paragraph Code="se=&quot;35&quot;,p1=&quot;b&quot;"><Label>(<Emphasis style="italic">b</Emphasis>)</Label><Text>show the scale to which the plan is drawn; and</Text></Paragraph><Paragraph Code="se=&quot;35&quot;,p1=&quot;c&quot;"><Label>(<Emphasis style="italic">c</Emphasis>)</Label><Text>show locations</Text><Subparagraph Code="se=&quot;35&quot;,p1=&quot;c&quot;,p2=&quot;i&quot;"><Label>(i)</Label><Text>in accordance with sections 5 to 9 of the <XRefExternal reference-type="regulation" link="C.R.C.,_c._1518">Canada Oil and Gas Land Regulations</XRefExternal>, or</Text></Subparagraph><Subparagraph Code="se=&quot;35&quot;,p1=&quot;c&quot;,p2=&quot;ii&quot;"><Label>(ii)</Label><Text>by giving the geographic co-ordinates thereof.</Text></Subparagraph></Paragraph></Section><Heading Code="ga=&quot;s_36&quot;,h1=&quot;&quot;" level="1"><TitleText Code="ga=&quot;s_36&quot;,h1=&quot;&quot;,t1=&quot;&quot;,nb=&quot;1&quot;">SECURITY DEPOSIT</TitleText></Heading><Section Code="se=&quot;36&quot;"><Label>36.</Label><Subsection Code="se=&quot;36&quot;,ss=&quot;1&quot;"><Label>(1)</Label><Text>In order to ensure that a permittee complies with the terms and conditions of his permit and with these Regulations, the engineer may include in the permit a condition that the permittee deposit with the Minister a security deposit not exceeding $100,000.</Text></Subsection><Subsection Code="se=&quot;36&quot;,ss=&quot;2&quot;"><Label>(2)</Label><Text>Where a permit includes a condition requiring a security deposit, the permittee shall not begin the land use operation until a security deposit has been deposited with the Minister.</Text></Subsection><Subsection Code="se=&quot;36&quot;,ss=&quot;3&quot;"><Label>(3)</Label><Text>A security deposit shall be in the form of</Text><Paragraph Code="se=&quot;36&quot;,ss=&quot;3&quot;,p1=&quot;a&quot;"><Label>(<Emphasis style="italic">a</Emphasis>)</Label><Text>a promissory note guaranteed by a chartered bank and payable to the Receiver General;</Text></Paragraph><Paragraph Code="se=&quot;36&quot;,ss=&quot;3&quot;,p1=&quot;b&quot;"><Label>(<Emphasis style="italic">b</Emphasis>)</Label><Text>a certified cheque drawn on a chartered bank in Canada and payable to the Receiver General;</Text></Paragraph><Paragraph Code="se=&quot;36&quot;,ss=&quot;3&quot;,p1=&quot;c&quot;"><Label>(<Emphasis style="italic">c</Emphasis>)</Label><Text>bearer bonds issued or guaranteed by the Government of Canada; or</Text></Paragraph><Paragraph Code="se=&quot;36&quot;,ss=&quot;3&quot;,p1=&quot;d&quot;"><Label>(<Emphasis style="italic">d</Emphasis>)</Label><Text>a combination of the securities described in paragraphs (<Emphasis style="italic">a</Emphasis>) to (<Emphasis style="italic">c</Emphasis>).</Text></Paragraph></Subsection><Subsection Code="se=&quot;36&quot;,ss=&quot;4&quot;"><Label>(4)</Label><Text>A security deposit shall be returned by the Minister when the engineer has issued a letter of clearance in respect of the land use operation.</Text></Subsection><Subsection Code="se=&quot;36&quot;,ss=&quot;5&quot;"><Label>(5)</Label><Text>Where a permittee has not complied with all the terms and conditions of his permit or with these Regulations and the land use operation of the permittee results in damage to the lands, the Minister may retain the whole of the security deposit or such portion of the security deposit as is required to restore the lands to their former condition.</Text></Subsection><Subsection Code="se=&quot;36&quot;,ss=&quot;6&quot;"><Label>(6)</Label><Text>Where the Minister retains a portion of a security deposit pursuant to subsection (5), the Minister shall return the remainder of the security deposit to the permittee.</Text></Subsection><Subsection Code="se=&quot;36&quot;,ss=&quot;7&quot;"><Label>(7)</Label><Text>Where the whole of a security deposit retained by the Minister pursuant to subsection (5) is insufficient to cover the cost of restoring the lands to their former condition, the deficiency shall be collectable as a debt due to the Crown.</Text></Subsection><HistoricalNote><ul><li>SOR/88-169, ss. 5, 6(E).</li></ul></HistoricalNote></Section><Heading Code="ga=&quot;s_37&quot;,h1=&quot;&quot;" level="1"><TitleText Code="ga=&quot;s_37&quot;,h1=&quot;&quot;,t1=&quot;&quot;,nb=&quot;1&quot;">LETTER OF CLEARANCE</TitleText></Heading><Section Code="se=&quot;37&quot;"><Label>37.</Label><Text>When the engineer is satisfied that a permittee has complied with all the terms and conditions of his permit and with the provisions of these Regulations, he shall issue a letter of clearance to the permittee.</Text><HistoricalNote><ul><li>SOR/88-169, s. 6(E).</li></ul></HistoricalNote></Section><Heading Code="ga=&quot;s_38&quot;,h1=&quot;&quot;" level="1"><TitleText Code="ga=&quot;s_38&quot;,h1=&quot;&quot;,t1=&quot;&quot;,nb=&quot;1&quot;">DUTIES AND POWERS OF INSPECTORS</TitleText></Heading><Section Code="se=&quot;38&quot;"><Label>38.</Label><Subsection Code="se=&quot;38&quot;,ss=&quot;1&quot;"><Label>(1)</Label><Text>It shall be a condition of every permit that the permittee shall permit an inspector, at any reasonable time, to enter any place or premises on territorial lands under the permittee’s ownership or occupation, other than a private dwelling, and make such inspections as he thinks necessary to determine whether the terms and conditions of the permit or the provisions of these Regulations are being complied with.</Text></Subsection><Subsection Code="se=&quot;38&quot;,ss=&quot;2&quot;"><Label>(2)</Label><Text>An inspector shall be furnished with a certificate of his appointment as an inspector and on entering any place or premises under subsection (1) shall, if so requested, produce the certificate.</Text></Subsection><Subsection Code="se=&quot;38&quot;,ss=&quot;3&quot;"><Label>(3)</Label><Text>Every person in any place or premises entered by an inspector under subsection (1) shall give the inspector such assistance and furnish him with such information as the inspector may, for the purpose of carrying out his duties under these Regulations, reasonably require.</Text></Subsection></Section><Section Code="se=&quot;39&quot;"><Label>39.</Label><Text>No person shall wilfully obstruct or hinder an inspector in carrying out his duties under these Regulations.</Text></Section><Section Code="se=&quot;40&quot;"><Label>40.</Label><Text>No person shall knowingly make a false or misleading statement either orally or in writing to an inspector engaged in carrying out his duties under these Regulations.</Text></Section><Heading Code="ga=&quot;s_41&quot;,h1=&quot;&quot;" level="1"><TitleText Code="ga=&quot;s_41&quot;,h1=&quot;&quot;,t1=&quot;&quot;,nb=&quot;1&quot;">SUSPENSION OF A LAND USE OPERATION</TitleText></Heading><Section Code="se=&quot;41&quot;"><Label>41.</Label><Subsection Code="se=&quot;41&quot;,ss=&quot;1&quot;"><Label>(1)</Label><Text>Where an inspector is of the opinion that a permittee has failed to comply with any term or condition of his permit or any provision of these Regulations, he shall so inform the permittee and, if the default continues, the inspector may give notice to the permittee that if the default is not corrected within the time specified in the notice the inspector may order the suspension of the land use operation or any part thereof.</Text></Subsection><Subsection Code="se=&quot;41&quot;,ss=&quot;2&quot;"><Label>(2)</Label><Text>If a permittee does not correct a default within the time specified in a notice given by an inspector under subsection (1), the inspector may order the permittee to suspend the land use operation or any part thereof and the permittee shall thereupon suspend the land use operation or part thereof until the inspector authorizes the permittee to resume the land use operation.</Text></Subsection><Subsection Code="se=&quot;41&quot;,ss=&quot;3&quot;"><Label>(3)</Label><Text>An inspector shall authorize a permittee to resume a land use operation or part thereof suspended under subsection (2) when the inspector or the engineer is satisfied that the default has been corrected, unless the permit has in the meantime been cancelled pursuant to section 42.</Text></Subsection><Subsection Code="se=&quot;41&quot;,ss=&quot;4&quot;"><Label>(4)</Label><Text>Where a permittee has been informed of a default pursuant to subsection (1) or an order has been made in respect thereof pursuant to subsection (2), the engineer may, if the permittee fails to correct the default, take such action as he deems necessary to correct the default.</Text></Subsection><Subsection Code="se=&quot;41&quot;,ss=&quot;5&quot;"><Label>(5)</Label><Text>The costs of any action taken by the engineer pursuant to subsection (4) may be recovered from the permittee as a debt due to the Crown.</Text></Subsection><Subsection Code="se=&quot;41&quot;,ss=&quot;6&quot;"><Label>(6)</Label><Text>Nothing in this section relieves a permittee from prosecution for any violation of these Regulations.</Text></Subsection><Subsection Code="se=&quot;41&quot;,ss=&quot;7&quot;"><Label>(7)</Label><Text>No order pursuant to subsection (2) shall be made in respect of an oil or gas drilling site between the time of spud-in and the rig release date without the concurrence of the district oil and gas conservation engineer.</Text></Subsection><HistoricalNote><ul><li>SOR/88-169, s. 6(E).</li></ul></HistoricalNote></Section><Heading Code="ga=&quot;s_42&quot;,h1=&quot;&quot;" level="1"><TitleText Code="ga=&quot;s_42&quot;,h1=&quot;&quot;,t1=&quot;&quot;,nb=&quot;1&quot;">CANCELLATION OF PERMIT</TitleText></Heading><Section Code="se=&quot;42&quot;"><Label>42.</Label><Subsection Code="se=&quot;42&quot;,ss=&quot;1&quot;"><Label>(1)</Label><Text>Where a land use operation has been suspended pursuant to section 41 and the permittee fails or refuses to correct his default in complying with any terms and conditions of a permit or of any provision of these Regulations, the engineer may cancel the permit.</Text></Subsection><Subsection Code="se=&quot;42&quot;,ss=&quot;2&quot;"><Label>(2)</Label><Text>The cancellation of a permit under subsection (1) shall not relieve the permittee from any obligation arising under the terms and conditions of the permit or under these Regulations, or from complying with any notice, direction or order given by an inspector or by the engineer.</Text></Subsection><HistoricalNote><ul><li>SOR/88-169, s. 6(E).</li></ul></HistoricalNote></Section><Heading Code="ga=&quot;s_43&quot;,h1=&quot;&quot;" level="1"><TitleText Code="ga=&quot;s_43&quot;,h1=&quot;&quot;,t1=&quot;&quot;,nb=&quot;1&quot;">DISCONTINUANCE OF A LAND USE OPERATION</TitleText></Heading><Section Code="se=&quot;43&quot;"><Label>43.</Label><Subsection Code="se=&quot;43&quot;,ss=&quot;1&quot;"><Label>(1)</Label><Text>Subject to subsection (2), where a permittee wishes to discontinue a land use operation at any time prior to the date of completion set out in the permit, he shall give notice of discontinuance in writing to the engineer indicating the date upon which he proposes to discontinue the land use operation.</Text></Subsection><Subsection Code="se=&quot;43&quot;,ss=&quot;2&quot;"><Label>(2)</Label><Text>A notice of discontinuance given pursuant to subsection (1) shall be given to the engineer at least 10 days prior to the proposed date of the discontinuance.</Text></Subsection><Subsection Code="se=&quot;43&quot;,ss=&quot;3&quot;"><Label>(3)</Label><Text>On receipt of a notice of discontinuance, the engineer shall amend a copy of the permit accordingly and shall forward the amended copy of the permit to the permittee.</Text></Subsection><Subsection Code="se=&quot;43&quot;,ss=&quot;4&quot;"><Label>(4)</Label><Text>The discontinuance of a land use operation pursuant to this section does not relieve the permittee from any obligations arising under the terms and conditions of the permit or under these Regulations up to the time of discontinuance or from complying with any notice, direction or order given by an inspector or by the engineer.</Text></Subsection><HistoricalNote><ul><li>SOR/88-169, s. 6(E).</li></ul></HistoricalNote></Section><Heading Code="ga=&quot;s_44&quot;,h1=&quot;&quot;" level="1"><TitleText Code="ga=&quot;s_44&quot;,h1=&quot;&quot;,t1=&quot;&quot;,nb=&quot;1&quot;">ASSIGNMENT</TitleText></Heading><Section Code="se=&quot;44&quot;"><Label>44.</Label><Subsection Code="se=&quot;44&quot;,ss=&quot;1&quot;"><Label>(1)</Label><Text>On receipt of an application in writing for approval of an assignment of a permit and of the fee set out in Schedule I, the engineer may approve the assignment in whole or in part.</Text></Subsection><Subsection Code="se=&quot;44&quot;,ss=&quot;2&quot;"><Label>(2)</Label><Text>An application for approval of an assignment shall be forwarded to the engineer at least 10 days prior to the proposed effective date of the assignment and shall include the permit number of the assignor, the name and address of the proposed assignee and particulars of the interests or rights of the assignee to be benefited by the assignment of the permit.</Text></Subsection><HistoricalNote><ul><li>SOR/88-169, s. 6(E);</li><li> SOR/96-113, s. 2.</li></ul></HistoricalNote></Section><Heading Code="ga=&quot;s_45&quot;,h1=&quot;&quot;" level="1"><TitleText Code="ga=&quot;s_45&quot;,h1=&quot;&quot;,t1=&quot;&quot;,nb=&quot;1&quot;">APPEALS</TitleText></Heading><Section Code="se=&quot;45&quot;"><Label>45.</Label><Subsection Code="se=&quot;45&quot;,ss=&quot;1&quot;"><Label>(1)</Label><Text>An applicant for a permit or a permittee may, within 30 days after any decision, direction or order made by the engineer or an inspector, appeal therefrom to the Minister.</Text></Subsection><Subsection Code="se=&quot;45&quot;,ss=&quot;2&quot;"><Label>(2)</Label><Text>An appeal referred to in subsection (1) shall be by notice in writing setting forth</Text><Paragraph Code="se=&quot;45&quot;,ss=&quot;2&quot;,p1=&quot;a&quot;"><Label>(<Emphasis style="italic">a</Emphasis>)</Label><Text>the decision, direction or order appealed from;</Text></Paragraph><Paragraph Code="se=&quot;45&quot;,ss=&quot;2&quot;,p1=&quot;b&quot;"><Label>(<Emphasis style="italic">b</Emphasis>)</Label><Text>the relevant circumstances surrounding the giving of the decision, direction or order; and</Text></Paragraph><Paragraph Code="se=&quot;45&quot;,ss=&quot;2&quot;,p1=&quot;c&quot;"><Label>(<Emphasis style="italic">c</Emphasis>)</Label><Text>the grounds of the appeal.</Text></Paragraph></Subsection><Subsection Code="se=&quot;45&quot;,ss=&quot;3&quot;"><Label>(3)</Label><Text>A person appealing to the Minister pursuant to subsection (1) shall provide the Minister with such further particulars with respect to the appeal as the Minister may require.</Text></Subsection><Subsection Code="se=&quot;45&quot;,ss=&quot;4&quot;"><Label>(4)</Label><Text>The Minister may, after receipt of an appeal pursuant to subsection (1), set aside, confirm or vary the decision, direction or order appealed from or may remit it to the engineer for reconsideration with such instructions as the Minister deems proper.</Text></Subsection><Subsection Code="se=&quot;45&quot;,ss=&quot;5&quot;"><Label>(5)</Label><Text>A decision, direction or order appealed from remains in full force and effect pending the decision of the Minister or an officer appointed by him pursuant to subsection (6).</Text></Subsection><Subsection Code="se=&quot;45&quot;,ss=&quot;6&quot;"><Label>(6)</Label><Text>The Minister may authorize a senior officer of the Department of Indian Affairs and Northern Development, other than the engineer, to exercise the Minister’s powers in respect of any appeal pursuant to this section.</Text></Subsection><HistoricalNote><ul><li>SOR/88-169, s. 6(E).</li></ul></HistoricalNote></Section><Heading Code="ga=&quot;s_46&quot;,h1=&quot;&quot;" level="1"><TitleText Code="ga=&quot;s_46&quot;,h1=&quot;&quot;,t1=&quot;&quot;,nb=&quot;1&quot;">NOTICE</TitleText></Heading><Section Code="se=&quot;46&quot;"><Label>46.</Label><Subsection Code="se=&quot;46&quot;,ss=&quot;1&quot;"><Label>(1)</Label><Text>Any direction, notice or order given to a permittee under these Regulations shall be sufficiently given if sent by registered mail to, or left at, the permittee’s address as stated in his application for the permit and shall be deemed to have been given to the permittee on the date it was so mailed or left.</Text></Subsection><Subsection Code="se=&quot;46&quot;,ss=&quot;2&quot;"><Label>(2)</Label><Text>Where a direction, notice or order is given to a permittee other than in writing, it shall forthwith be confirmed in writing.</Text></Subsection></Section><Heading Code="ga=&quot;s_47&quot;,h1=&quot;&quot;" level="1"><TitleText Code="ga=&quot;s_47&quot;,h1=&quot;&quot;,t1=&quot;&quot;,nb=&quot;1&quot;">FEES</TitleText></Heading><Section Code="se=&quot;47&quot;"><Label>47.</Label><Text>The fee set out in column II of an item of Schedule I is payable for the service set out in column I of that item.</Text><HistoricalNote><ul><li>SOR/96-113, s. 3.</li></ul></HistoricalNote></Section></Body><Schedule spanlanguages="no" bilingual="no" Code="sc=&quot;&quot;,nb=&quot;1&quot;"><ScheduleFormHeading><Label>SCHEDULE I</Label><OriginatingRef>(Sections 22, 44 and 47)</OriginatingRef></ScheduleFormHeading><TableGroup pointsize="10" topmarginspacing="4"><Caption position="over" justification="center">SERVICE FEES</Caption><table frame="topbot"><tgroup cols="3"><colspec colname="1" colwidth="78.12*" htmlwidth="17%" /><colspec colname="2" colwidth="250.35*" htmlwidth="53%" /><colspec colname="3" colwidth="139.63*" htmlwidth="30%" /><thead><row topdouble="yes" topmarginspacing="4"><entry colsep="0" rowsep="0" valign="top" id="t1329h0"></entry><entry colsep="0" rowsep="0" valign="top" id="t1329h1">Column I</entry><entry colsep="0" rowsep="0" valign="top" id="t1329h2">Column II</entry></row><row valign="bottom" topmarginspacing="6"><entry colsep="0" rowsep="1" valign="bottom" id="t1329h3">Item</entry><entry colsep="0" rowsep="1" valign="bottom" id="t1329h4" headers="t1329h1">Service</entry><entry colsep="0" rowsep="1" valign="bottom" id="t1329h5" headers="t1329h2">Fee</entry></row></thead><tbody><row><entry colname="1" colsep="0" rowsep="0" valign="top" headers="t1329h3">1.</entry><entry colname="2" colsep="0" rowsep="0" valign="top" headers="t1329h1 t1329h4">Permit application</entry><entry colname="3" colsep="0" rowsep="0" valign="top" headers="t1329h2 t1329h5">$150</entry></row><row><entry colname="1" colsep="0" rowsep="0" valign="top" headers="t1329h3">2.</entry><entry colname="2" colsep="0" rowsep="0" valign="top" headers="t1329h1 t1329h4">Assignment of permit</entry><entry colname="3" colsep="0" rowsep="0" valign="top" headers="t1329h2 t1329h5">50</entry></row><row><entry colname="1" colsep="0" rowsep="0" valign="top" headers="t1329h3">3.</entry><entry colname="2" colsep="0" rowsep="0" valign="top" headers="t1329h1 t1329h4">Copies of documents</entry><entry colname="3" colsep="0" rowsep="0" valign="top" headers="t1329h2 t1329h5">1.00 per page</entry></row></tbody></tgroup></table></TableGroup><HistoricalNote><ul><li>SOR/96-113, s. 4.</li></ul></HistoricalNote></Schedule><Schedule spanlanguages="no" bilingual="no" Code="sc=&quot;&quot;,nb=&quot;2&quot;"><ScheduleFormHeading><Label>SCHEDULE II</Label><OriginatingRef>(Section 22)</OriginatingRef></ScheduleFormHeading><TableGroup pointsize="8.5" topmarginspacing="4"><Caption position="over" justification="center">LAND USE FEES</Caption><table frame="topbot"><tgroup cols="3"><colspec colname="1" colwidth="54.20*" htmlwidth="12%" /><colspec colname="2" colwidth="259.30*" htmlwidth="55%" /><colspec colname="3" colwidth="154.51*" htmlwidth="33%" /><thead><row topdouble="yes" topmarginspacing="4"><entry colsep="0" rowsep="0" valign="top" id="t1330h0"></entry><entry colsep="0" rowsep="0" valign="top" id="t1330h1">Column I</entry><entry colsep="0" rowsep="0" valign="top" id="t1330h2">Column II</entry></row><row valign="bottom" topmarginspacing="6"><entry colsep="0" rowsep="1" valign="bottom" id="t1330h3">Item</entry><entry colsep="0" rowsep="1" valign="bottom" id="t1330h4" headers="t1330h1">Description</entry><entry colsep="0" rowsep="1" id="t1330h5" headers="t1330h2">Fee</entry></row></thead><tbody><row><entry colname="1" colsep="0" rowsep="0" valign="top" headers="t1330h3">1.</entry><entry colname="2" colsep="0" rowsep="0" valign="top" headers="t1330h1 t1330h4">Where area of lands proposed to be used as shown on the preliminary plan is less than or equal to 2 ha</entry><entry colname="3" colsep="0" rowsep="0" valign="bottom" headers="t1330h2 t1330h5">$50</entry></row><row><entry colname="1" colsep="0" rowsep="0" valign="top" headers="t1330h3">2.</entry><entry colname="2" colsep="0" rowsep="0" valign="top" headers="t1330h1 t1330h4">Where area of lands proposed to be used as shown on the preliminary plan is greater than 2 ha</entry><entry colname="3" colsep="0" rowsep="0" valign="bottom" headers="t1330h2 t1330h5">$50 plus $50/ha for each hectare or portion of a hectare in excess of 2 ha</entry></row></tbody></tgroup></table></TableGroup><HistoricalNote><ul><li>SOR/96-113, s. 4.</li></ul></HistoricalNote></Schedule></Regulation>