National Energy Board Act
Version of section 58.3 from 2002-12-31 to 2013-07-02:
Marginal note:Exceptions
58.3 (1) No approval under the Navigable Waters Protection Act is required for the construction of any work if leave for its construction is first obtained under section 58.29.
Marginal note:Exemptions
(2) The Minister of Transport may provide that leave under section 58.29 is not necessary if the power line is constructed across, on, along or under a navigable water or a railway, as the case may be, in accordance with the orders, regulations, plans and specifications made, adopted or approved by the Minister for those purposes.
- 1990, c. 7, s. 23
- 1996, c. 10, s. 240