Secondary Lead Smelter Release Regulations (SOR/91-155)

Regulations are current to 2013-05-20

SCHEDULE I

(Subsection 9(1))

RELEASE MEASUREMENT REPORT

Name of Owner or Operator

Address of Smelter

Telephone Number of Smelter

Unit or Process Tested

Date of Measurement

Test Data

Detailed Calculations to be Appended or Forwarded Within 30 Days after Submission of this Report

Test Run No.123456
Production at time of test run (tonnes of lead/h)
Average flue gas volume at time of test run (norm. m3/min)
Particulate matter released (g/norm. m3)
Lead content of particulate matter (%)

(Signature)

(Title)

(Date)

Valid Test runs

Test result (average of valid test runs)

  • (a) particulate matter (g/norm. m3)

  • (b) lead content of particulate matter (%)

Signature of Attending Enforcement Officer

(if applicable)

  • SOR/2000-102, s. 4.