Advanced Search

Search Form
Keyword(s):
Filter(s):
 
Display / Hide Categories
Results 1-5 of 13
Didn't find what you're looking for?
Search Canada.ca

  1. National Energy Board Onshore Pipeline Regulations - SOR/99-294 (Section 1)
    National Energy Board Onshore Pipeline Regulations

     The definitions in this section apply in these Regulations.

    accountable officer

    accountable officer means a person appointed as accountable officer under subsection 6.2(1). (dirigeant responsable)

    class location

    class location means a class location as defined in CSA Z662 and as determined in accordance with that standard. (classe d’emplacement)

    component

    component means a component as defined in CSA Z662. (élément)

    CSA Z246.1

    CSA Z246.1 means CSA Standard Z246.1 entitled Security Management for Petroleum and Natural Gas Industry Systems, as amended from time to time. (norme CSA Z246.1)

    CSA Z276

    CSA Z276 means CSA Standard Z276 entitled Liquefied Natural Gas (LNG) - Production, Storage and Handling, as amended from time to time. (norme CSA Z276)

    CSA Z341

    CSA Z341 means CSA Standard Z341 entitled Storage of Hydrocarbons in Underground Formations, as amended from time to time. (norme CSA Z341)

    CSA Z662

    CSA Z662 means CSA Standard Z662 entitled Oil and Gas Pipeline Systems, as amended from time to time. (norme CSA Z662)

    HVP

    HVP means high vapour pressure as defined in CSA Z662. (HPV)

    incident

    incident means an occurrence that results in

    • [...]

    • (f) the operation of a pipeline beyond its design limits as determined under CSA Z662 or CSA Z276 or any operating limits imposed by the Board. (incident)

    LVP

    LVP means low vapour pressure as defined in CSA Z662. (BPV)

    maximum operating pressure

    maximum operating pressure means maximum operating pressure as defined in CSA Z662. (pression maximale de service)

    [...]


  2. National Energy Board Onshore Pipeline Regulations - SOR/99-294 (Section 38)
    National Energy Board Onshore Pipeline Regulations
    • [...]

    • (2) If a company performs welding referred to in subsection (1), the company shall treat the weld as a temporary installation and replace that installation with a permanent one as soon as is practicable.

    • (3) Despite subsections (1) and (2) and section 16, if a company intends to perform welding on a liquid-filled pipeline with a carbon equivalent of 0.50% or greater and to treat it as a permanent installation, the company shall submit the welding specifications and procedures and the results of the procedure qualification tests to the Board for approval.


  3. National Energy Board Onshore Pipeline Regulations - SOR/99-294 (Section 56)
    National Energy Board Onshore Pipeline Regulations

     A company shall, in addition to complying with the record retention requirements set out in the CSA standards referred to in section 4, retain

    • [...]

    • (e) for as long as the installations referred to in section 38 remain on the pipeline, detailed records of those installations, including

      [...]

    [...]


  4. National Energy Board Onshore Pipeline Regulations - SOR/99-294 (Section 53)
    National Energy Board Onshore Pipeline Regulations
    •  (1) A company shall conduct inspections on a regular basis and audits, with a maximum interval of three years, to ensure that its pipeline is designed, constructed, operated and abandoned in compliance with

      • [...]

      • (b) Part V of the Act, as it relates to the protection of property and the environment and the safety and security of the public and of the company’s employees;

      • [...]

      • (d) the terms and conditions of any certificate or order issued by the Board, as they relate to the protection of property and the environment and the safety of the public and of the company’s employees.

    [...]


  5. National Energy Board Onshore Pipeline Regulations - SOR/99-294 (Section 52)
    National Energy Board Onshore Pipeline Regulations
    •  (1) A company shall immediately notify the Board of any incident relating to the construction, operation or abandonment of its pipeline and shall submit a preliminary and detailed incident report to the Board as soon as is practicable.



Date modified: