Advanced Search

Search Form
Keyword(s):
Filter(s):
 
Display / Hide Categories
Results 1-5 of 18
Didn't find what you're looking for?
Search Canada.ca

  1. Nova Scotia Offshore Petroleum Drilling and Production Regulations - SOR/2009-317 (Section 1)
    Nova Scotia Offshore Petroleum Drilling and Production Regulations
    •  (1) The following definitions apply in these Regulations.

      flow system

      flow system means the flow meters, auxiliary equipment attached to the flow meters, fluid sampling devices, production test equipment, the master meter and meter prover used to measure and record the rate and volumes at which fluids are

      • [...]

      • (b) used as a fuel;

      zone

      zone means any stratum or any sequence of strata and includes, for the purposes of the definition commingled production , section 7, subsection 61(2), sections 64 to 66 and 74, subsection 83(2) and section 86, a zone that has been designated as such by the Board under section 4. (couche)

    • (2) In these Regulations, delineation well , development well and exploratory well have the same meaning as in subsection 122(1) of the Act.

    • (3) In these Regulations, drilling installation , drilling rig , drilling unit , drill site , installation , production installation , production operation , production site and subsea production system have the same meaning as in subsection 2(1) of the Nova Scotia Offshore Petroleum Installations Regulations.

    • [...]

    • (5) For the purpose of section 198.2 of the Act, any installation is prescribed as an installation.


  2. Nova Scotia Offshore Petroleum Drilling and Production Regulations - SOR/2009-317 (Section 46)
    Nova Scotia Offshore Petroleum Drilling and Production Regulations
    •  (1) An operator that completes a well shall ensure that

      • [...]

      • (e) each packer is set as close as practical to the top of the completion interval and that the pressure testing of the packer to a differential pressure is greater than the maximum differential pressure anticipated under the production or injection conditions;

      • [...]

      • (h) if different pressure and inflow characteristics of two or more pools might adversely affect the recovery from any of those pools, the well is operated as a single pool well or as a segregated multi-pool well;


  3. Nova Scotia Offshore Petroleum Drilling and Production Regulations - SOR/2009-317 (Section 82)
    Nova Scotia Offshore Petroleum Drilling and Production Regulations

     The operator shall ensure that

    • [...]

    • (b) in respect of all wells, a formation flow test report is submitted to the Board as soon as the circumstances permit, following completion of the test.


  4. Nova Scotia Offshore Petroleum Drilling and Production Regulations - SOR/2009-317 (Section 76)
    Nova Scotia Offshore Petroleum Drilling and Production Regulations
    •  (1) The operator shall ensure that

      • (a) the Board is notified of any incident or near-miss as soon as the circumstances permit; and


  5. Nova Scotia Offshore Petroleum Drilling and Production Regulations - SOR/2009-317 (Section 68)
    Nova Scotia Offshore Petroleum Drilling and Production Regulations

     No operator shall burn oil unless

    • [...]

    • (b) it is necessary to do so because of an emergency situation and the Board is notified in the daily drilling report, daily production report or in any other written or electronic form, as soon as the circumstances permit, of the burning and the amount burned.



Date modified: