[...]
15 The expansion of an existing
-
[...]
-
(d) facility for the liquefaction, storage or regasification of liquefied natural gas that would result in an increase in the liquefied natural gas processing or storage capacity of 50% or more and a total liquefied natural gas processing capacity of 3 000 t/day or more or a total liquefied natural gas storage capacity of 55 000 t or more, as the case may be;
[...]
23 The low-level flying of military fixed-wing jet aircraft for more than 150 days in a calendar year as part of a training program at an altitude below 330 m above ground level on a route or in an area that was not established before October 7, 1994 by or under the authority of the Minister of National Defence or the Chief of the Defence Staff as a route or area set aside for low-level flying training.
24 The construction, operation, decommissioning and abandonment of a new
[...]
26 The construction, operation, decommissioning and abandonment of a new
[...]