[...]
The approach surfaces, shown on Charlottetown Airport Zoning Plan Nos. S-1857-0 to S-1857-12 inclusive, dated February 12, 1988, are surfaces abutting each end of the strips associated with runways designated 03-21 and l0-28 and are described as follows:
-
(a) a surface abutting the end of the strip associated with runway approach 03 consisting of an inclined plane having a ratio of 1 m measured vertically to 50 m measured horizontally rising to an imaginary horizontal line drawn at right angles to the projected centre line of the strip and distant 15 000 m measured horizontally from the end of the strip; the outer ends of the imaginary horizontal line being 2 400 m from the projected centre line; said imaginary horizontal line being 300 m above the elevation at the end of the strip;
-
(b) a surface abutting the end of the strip associated with runway approach 21 consisting of an inclined plane having a ratio of 1 m measured vertically to 50 m measured horizontally rising to an imaginary horizontal line drawn at right angles to the projected centre line of the strip and distant 15 000 m measured horizontally from the end of the strip; the outer ends of the imaginary horizontal line being 2 400 m from the projected centre line; said imaginary horizontal line being 300 m above the elevation at the end of the strip;
-
(c) a surface abutting the end of the strip associated with runway approach l0 consisting of an inclined plane having a ratio of 1 m measured vertically to 50 m measured horizontally rising to an imaginary horizontal line drawn at right angles to the projected centre line of the strip and distant l5 000 m measured horizontally from the end of the strip; the outer ends of the imaginary horizontal line being 2 400 m from the projected centre line; said imaginary horizontal line being 300 m above the elevation at the end of the strip; and
-
(d) a surface abutting the end of the strip associated with runway approach 28 consisting of an inclined plane having a ratio of 1 m measured vertically to 50 m measured horizontally rising to an imaginary horizontal line drawn at right angles to the projected centre line of the strip and distant l5 000 m measured horizontally from the end of the strip; the outer ends of the imaginary horizontal line being 2 400 m from the projected centre line; said imaginary horizontal line being 300 m above the elevation at the end of the strip.
[...]