Government of Canada / Gouvernement du Canada
Symbol of the Government of Canada

Search

Newfoundland Offshore Petroleum Drilling and Production Regulations (SOR/2009-316)

Regulations are current to 2020-07-28 and last amended on 2014-12-31. Previous Versions

PART 8Production Conservation (continued)

Gas Flaring and Venting

 No operator shall flare or vent gas unless

  • (a) it is otherwise permitted in the approval issued under subsection 52(4) or in the authorization; or

  • (b) it is necessary to do so because of an emergency situation and the Board is notified in the daily drilling report, daily production report or in any other written or electronic form, as soon as the circumstances permit, of the flaring or venting and of the amount flared or vented.

Oil Burning

 No operator shall burn oil unless

  • (a) it is otherwise permitted in the approval issued under subsection 52(4) or in the authorization; or

  • (b) it is necessary to do so because of an emergency situation and the Board is notified in the daily drilling report, daily production report or in any other written or electronic form, as soon as the circumstances permit, of the burning and the amount burned.

PART 9Support Operations

Support Craft

 The operator shall ensure that all support craft are designed, constructed and maintained to supply the necessary support functions and operate safely in the foreseeable physical environmental conditions prevailing in the area in which they operate.

  •  (1) The operator of a manned installation shall ensure that at least one support craft is

    • (a) available at a distance that is not greater than that required for a return time of twenty minutes; and

    • (b) suitably equipped to supply the necessary emergency services including rescue and first aid treatment for all personnel on the installation in the event of an emergency.

  • (2) If the support craft exceeds the distance referred to in paragraph (1)(a), both the installation manager and the person in charge of the support craft shall log this fact and the reason why the distance or time was exceeded.

  • (3) Under the direction of the installation manager, the support craft crew shall keep the craft in close proximity to the installation, maintain open communication channels with the installation and be prepared to conduct rescue operations during any activity or condition that presents an increased level of risk to the safety of personnel or the installation.

Safety Zone

  •  (1) For the purposes of this section, the safety zone around an installation consists of the area within a line enclosing and drawn at a distance of 500 m from the outer edge of the installation.

  • (2) A support craft shall not enter the safety zone without the consent of the installation manager.

  • (3) The operator shall take all reasonable measures to warn persons who are in charge of vessels and aircraft of the safety zone boundaries, of the facilities within the safety zone and of any related potential hazards.

PART 10Training and Competency

 The operator shall ensure that

  • (a) all personnel have, before assuming their duties, the necessary experience, training and qualifications and are able to conduct their duties safely, competently and in compliance with these Regulations; and

  • (b) records of the experience, training and qualifications of all personnel are kept and made available to the Board upon request.

Impairment and Fatigue

  •  (1) Subject to subsection (2), the operator shall ensure that no person works when their ability to function is impaired and that no person is required to work

    • (a) any shift in excess of 12.5 continuous hours; or

    • (b) two successive shifts of any duration unless that person has had at least eight hours’ rest between the shifts.

  • (2) The operator may allow a person to work in excess of the hours or without the rest period referred to in subsection (1) if the operator has assessed the risk associated with the person working the extra hours and determined that such work can be carried out without increased risk to safety or to the environment.

  • (3) If an operator allows a person to work in excess of the hours or without the rest period referred to in subsection (1), the operator shall ensure that a description of the work, the names of the persons performing the work, the hours worked and the risk assessment referred to in subsection (2) are recorded.

PART 11Submissions, Notifications, Records and Reports

Reference to Names and Designations

 When submitting any information for the purposes of these Regulations, the operator shall refer to each well, pool and field by the name given to it under sections 3 and 4, or if a zone, by its designation by the Board under section 4.

Surveys

  •  (1) The operator shall ensure that a survey is used to confirm the location of the well on the seafloor.

  • (2) The survey shall be certified by a person licensed under the Canada Lands Surveyors Act.

  • (3) The operator shall ensure that a copy of the survey plan filed with the Canada Lands Surveys Records is submitted to the Board.

Incidents and Near-misses

  •  (1) The operator shall ensure that

    • (a) the Board is notified of any incident or near-miss as soon as the circumstances permit; and

    • (b) the Board is notified at least 24 hours in advance of any press release or press conference held by the operator concerning any incident or near-miss during any activity to which these Regulations apply, except in an emergency situation, in which case it shall be notified without delay before the press release or press conference.

  • (2) The operator shall ensure that

    • (a) any incident or near-miss is investigated, its root cause and causal factors identified and corrective action taken; and

    • (b) for any of the following incidents or near-misses, a copy of an investigation report identifying the root cause, causal factors and corrective action taken is submitted to the Board no later than 21 days after the day on which the incident or near-miss occurred:

      • (i) a lost or restricted workday injury,

      • (ii) death,

      • (iii) fire or explosion,

      • (iv) a loss of containment of any fluid from a well,

      • (v) an imminent threat to the safety of a person, installation or support craft, or

      • (vi) a significant pollution event.

Submission of Data and Analysis

  •  (1) The operator shall ensure that a final copy of the results, data, analyses and schematics obtained from the following sources is submitted to the Board:

    • (a) testing, sampling and pressure surveys carried out as part of the well and field data acquisition programs referred to in section 49 and testing and sampling of formations referred to in section 51; and

    • (b) any segregation test or well operation.

  • (2) Unless otherwise indicated in these Regulations, the operator shall ensure that the results, data, analyses and schematics are submitted within 60 days after the day on which any activity referred to in paragraphs (1)(a) and (b) is completed.

Records

 The operator shall ensure that records are kept of

  • (a) all persons arriving, leaving or present on the installation;

  • (b) the location and movement of support craft, the emergency drills and exercises, incidents, near-misses, the quantities of consumable substances that are required to ensure the safety of operations and other observations and information critical to the safety of persons on the installation or the protection of the environment;

  • (c) daily maintenance and operating activities, including any activity that may be critical to the safety of persons on the installation, the protection of the environment or the prevention of waste;

  • (d) in the case of a production installation,

    • (i) the inspection of the installation and related equipment for corrosion and erosion and any resulting maintenance carried out,

    • (ii) the pressure, temperature and flow rate data for compressors and treating and processing facilities,

    • (iii) the calibration of meters and instruments,

    • (iv) the testing of surface and subsurface safety valves,

    • (v) the status of each well and the status of well operations, and

    • (vi) the status of the equipment and systems critical to safety and protection of the environment including any unsuccessful test result or equipment failure leading to an impairment of the systems; and

  • (e) in the case of a floating installation, all installation movements, data, observations, measurements and calculations related to the stability and station-keeping capability of the installation.

 
Date modified: