<?xml version="1.0"?><Regulation lims:pit-date="2022-09-27" hasPreviousVersion="true" lims:lastAmendedDate="2022-09-27" lims:current-date="2022-10-05" lims:inforce-start-date="2013-06-18" lims:fid="781992" lims:id="781992" gazette-part="II" in-force="yes" regulation-type="SOR" xml:lang="fr" xmlns:lims="http://justice.gc.ca/lims"><Identification lims:inforce-start-date="2013-06-18" lims:fid="781993" lims:id="781993"><InstrumentNumber>DORS/2013-138</InstrumentNumber><RegistrationDate><Date><YYYY>2013</YYYY><MM>6</MM><DD>18</DD></Date></RegistrationDate><ConsolidationDate lims:inforce-start-date="2013-06-18"><Date><YYYY>2022</YYYY><MM>10</MM><DD>6</DD></Date></ConsolidationDate><EnablingAuthority lims:inforce-start-date="2013-06-18" lims:fid="781995" lims:id="781995"><XRefExternal reference-type="act" link="N-7">LOI SUR L’OFFICE NATIONAL DE L’ÉNERGIE</XRefExternal></EnablingAuthority><LongTitle lims:inforce-start-date="2022-09-27" lims:enacted-date="2022-09-27" lims:fid="781996" lims:id="1365624">Règlement sur les sanctions administratives pécuniaires (Régie canadienne de l’énergie)</LongTitle><RegulationMakerOrder><RegulationMaker>C.P.</RegulationMaker><OrderNumber>2013-825</OrderNumber><Date><YYYY>2013</YYYY><MM>6</MM><DD>18</DD></Date></RegulationMakerOrder></Identification><Order lims:inforce-start-date="2013-06-18" lims:fid="781997" lims:id="781997"><Provision lims:inforce-start-date="2013-06-18" lims:fid="781998" lims:id="781998" format-ref="indent-0-0" language-align="yes"><Text>En vertu de l’article 134<FootnoteRef idref="nbp_a">a</FootnoteRef> de la <XRefExternal reference-type="act" link="N-7">Loi sur l’Office national de l’énergie</XRefExternal><FootnoteRef idref="nbp_b">b</FootnoteRef>, l’Office national de l’énergie prend le <XRefExternal reference-type="regulation" link="DORS-2013-138">Règlement sur les sanctions administratives pécuniaires (Office national de l’énergie)</XRefExternal>, ci-après.</Text></Provision><Provision lims:inforce-start-date="2013-06-18" lims:fid="781999" lims:id="781999" format-ref="indent-0-0" language-align="yes"><Text>Calgary (Alberta), le 17 mai 2013</Text><SignatureBlock justification="right" width="20pc"><SignatureTitle justification="right" topmarginspacing="8"><Emphasis style="italic">La secrétaire de l’Office national de l’énergie</Emphasis></SignatureTitle><SignatureName justification="right">SHERI YOUNG</SignatureName></SignatureBlock></Provision><Provision lims:inforce-start-date="2013-06-18" lims:fid="782000" lims:id="782000" format-ref="indent-0-0" language-align="yes"><Text>Sur recommandation du ministre des Ressources naturelles et en vertu de l’article 134<FootnoteRef idref="nbp_a">a</FootnoteRef> de la <XRefExternal reference-type="act">Loi sur l’Office nationale de l’énergie</XRefExternal><FootnoteRef idref="nbp_b">b</FootnoteRef>, Son Excellence le Gouverneur général en conseil approuve le <XRefExternal reference-type="regulation" link="DORS-2013-138">Règlement sur les sanctions administratives pécuniaires (Office national de l’énergie)</XRefExternal>, pris par l’Office national de l’énergie le 17 mai 2013.</Text></Provision><Footnote id="nbp_a" placement="page" status="official"><Label>a</Label><Text>L.C. 2012, ch. 19, art. 98</Text></Footnote><Footnote id="nbp_b" placement="page" status="official"><Label>b</Label><Text>L.R., ch. N-7</Text></Footnote></Order><Body lims:inforce-start-date="2013-06-18" lims:fid="782001" lims:id="782001"><Heading lims:inforce-start-date="2013-06-18" lims:fid="782002" lims:id="782002" level="1"><TitleText>Définition</TitleText></Heading><Section lims:inforce-start-date="2022-09-27" lims:enacted-date="2022-09-27" lims:lastAmendedDate="2022-09-27" lims:fid="782003" lims:id="1365625"><MarginalNote lims:inforce-start-date="2022-09-27" lims:enacted-date="2022-09-27" lims:fid="1365626" lims:id="1365626">Définition de Loi</MarginalNote><Label>1</Label><Text>Dans le présent règlement, <DefinedTermFr>Loi</DefinedTermFr> s’entend de la <XRefExternal reference-type="act" link="C-15.1">Loi sur la Régie canadienne de l’énergie</XRefExternal>.</Text><HistoricalNote><HistoricalNoteSubItem lims:inforce-start-date="2022-09-27" lims:enacted-date="2022-09-27" lims:fid="1365628" lims:id="1365628" lims:enactId="1365222">DORS/2022-199, art. 3</HistoricalNoteSubItem></HistoricalNote></Section><Heading lims:inforce-start-date="2013-06-18" lims:fid="782005" lims:id="782005" level="1"><TitleText>Désignations</TitleText></Heading><Section lims:inforce-start-date="2013-07-03" lims:lastAmendedDate="2022-09-27" lims:fid="782006" lims:id="782006"><MarginalNote lims:inforce-start-date="2022-09-27" lims:enacted-date="2022-09-27" lims:fid="782007" lims:id="1365629">Dispositions de la Loi et de ses règlements</MarginalNote><Label>2</Label><Subsection lims:inforce-start-date="2022-09-27" lims:enacted-date="2022-09-27" lims:fid="782008" lims:id="1365630"><Label>(1)</Label><Text>La contravention à toute disposition de la Loi ou de ses règlements figurant dans la colonne 1 de l’annexe 1 est désignée comme une violation punissable au titre des articles 116 à 135 de la Loi.</Text></Subsection><Subsection lims:inforce-start-date="2022-09-27" lims:enacted-date="2022-09-27" lims:fid="782009" lims:id="1365631"><MarginalNote lims:inforce-start-date="2022-09-27" lims:enacted-date="2022-09-27" lims:fid="1365632" lims:id="1365632">Ordonnances et décisions</MarginalNote><Label>(2)</Label><Text>La contravention à toute ordonnance ou décision rendue sous le régime de la Loi est désignée comme une violation punissable au titre des articles 116 à 135 de la Loi.</Text></Subsection><Subsection lims:inforce-start-date="2022-09-27" lims:enacted-date="2022-09-27" lims:fid="782011" lims:id="1365633"><MarginalNote lims:inforce-start-date="2022-09-27" lims:enacted-date="2022-09-27" lims:fid="1365634" lims:id="1365634">Conditions</MarginalNote><Label>(3)</Label><Text>La contravention à toute condition d’un certificat, d’une licence, d’un permis, d’une autorisation ou d’une dispense délivré ou accordée, selon le cas, sous le régime de la Loi est désignée comme une violation punissable au titre des articles 116 à 135 de la Loi.</Text></Subsection><Subsection lims:inforce-start-date="2013-07-03" lims:fid="782013" lims:id="782013"><MarginalNote lims:inforce-start-date="2013-07-03" lims:fid="782014" lims:id="782014">Incompatibilité</MarginalNote><Label>(4)</Label><Text>En cas d’incompatibilité entre le sommaire figurant à l’annexe 1 et la disposition correspondante, la disposition l’emporte.</Text></Subsection><HistoricalNote><HistoricalNoteSubItem lims:inforce-start-date="2022-09-27" lims:enacted-date="2022-09-27" lims:fid="1365636" lims:id="1365636" lims:enactId="1365224">DORS/2022-199, art. 4</HistoricalNoteSubItem></HistoricalNote></Section><Heading lims:inforce-start-date="2013-06-18" lims:fid="782015" lims:id="782015" level="1"><TitleText>Qualification</TitleText></Heading><Section lims:inforce-start-date="2013-07-03" lims:lastAmendedDate="2022-09-27" lims:fid="782016" lims:id="782016"><MarginalNote lims:inforce-start-date="2013-07-03" lims:fid="782017" lims:id="782017">Disposition mentionnée</MarginalNote><Label>3</Label><Subsection lims:inforce-start-date="2013-07-03" lims:fid="782018" lims:id="782018"><Label>(1)</Label><Text>La violation d’une disposition mentionnée dans la colonne 1 de l’annexe 1 est qualifiée de type A ou de type B, selon ce qui est prévu à la colonne 3.</Text></Subsection><Subsection lims:inforce-start-date="2022-09-27" lims:enacted-date="2022-09-27" lims:fid="782019" lims:id="1365637"><MarginalNote lims:inforce-start-date="2022-09-27" lims:enacted-date="2022-09-27" lims:fid="1365638" lims:id="1365638">Ordonnance, décision ou condition</MarginalNote><Label>(2)</Label><Text>La contravention à toute ordonnance ou décision visée au paragraphe 2(2) ou à toute condition visée au paragraphe 2(3) est une violation de type B.</Text></Subsection><HistoricalNote><HistoricalNoteSubItem lims:inforce-start-date="2022-09-27" lims:enacted-date="2022-09-27" lims:fid="1365640" lims:id="1365640" lims:enactId="1365226">DORS/2022-199, art. 5</HistoricalNoteSubItem></HistoricalNote></Section><Heading lims:inforce-start-date="2013-06-18" lims:fid="782021" lims:id="782021" level="1"><TitleText>Pénalités</TitleText></Heading><Section lims:inforce-start-date="2013-07-03" lims:lastAmendedDate="2022-09-27" lims:fid="782022" lims:id="782022"><MarginalNote lims:inforce-start-date="2013-07-03" lims:fid="782023" lims:id="782023">Montant de la pénalité</MarginalNote><Label>4</Label><Subsection lims:inforce-start-date="2013-07-03" lims:fid="782024" lims:id="782024"><Label>(1)</Label><Text>Le montant de la pénalité applicable à une violation est le montant prévu à la colonne 2 ou 3 de l’annexe 2 pour la cote de gravité figurant à la colonne 1, selon le type de violation et selon que le contrevenant est une personne physique ou non.</Text></Subsection><Subsection lims:inforce-start-date="2013-07-03" lims:fid="782025" lims:id="782025"><MarginalNote lims:inforce-start-date="2013-07-03" lims:fid="782026" lims:id="782026">Cote de gravité</MarginalNote><Label>(2)</Label><Text>La cote de gravité globale applicable à une violation est établie à partir des éléments prévus à la colonne 1 du tableau du présent article, en attribuant à chacun des éléments présents la valeur appropriée, selon les circonstances entourant la violation, prévue à la colonne 2 et en additionnant les valeurs ainsi attribuées.</Text><TableGroup lims:inforce-start-date="2013-07-03" lims:fid="782027" lims:id="782027" pointsize="7" topmarginspacing="4"><Caption lims:inforce-start-date="2013-07-03" lims:fid="782028" lims:id="782028" position="over">TABLEAU</Caption><table lims:inforce-start-date="2013-07-03" lims:fid="782029" lims:id="782029" frame="topbot"><tgroup lims:inforce-start-date="2013-07-03" lims:fid="782030" lims:id="782030" cols="3"><colspec colname="1" colwidth="11.78*" /><colspec colname="2" colwidth="66.00*" /><colspec colname="3" colwidth="21.20*" /><thead lims:inforce-start-date="2013-07-03" lims:fid="782031" lims:id="782031"><row topdouble="yes"><entry colsep="0" rowsep="0" valign="bottom" /><entry colsep="0" rowsep="0" valign="top">Colonne 1</entry><entry colsep="0" rowsep="0" valign="top">Colonne 2</entry></row><row><entry colsep="0" rowsep="1">Article</entry><entry colsep="0" rowsep="1" valign="bottom">Éléments</entry><entry colsep="0" rowsep="1" valign="bottom">Valeurs</entry></row></thead><tbody lims:inforce-start-date="2013-07-03" lims:fid="782032" lims:id="782032"><row height="10pt"><entry colsep="0" rowsep="0">1</entry><entry colsep="0" rowsep="0">Les antécédents du contrevenant relatifs à des violations commises au cours des sept dernières années</entry><entry colsep="0" rowsep="0">De 0 à +2</entry></row><row rowsep="0"><entry colname="1" colsep="0" rowsep="0" valign="top">2</entry><entry colname="2" colsep="0" rowsep="0" valign="top">Les avantages concurrentiels ou économiques que le contrevenant a pu retirer de la violation commise</entry><entry colname="3" colsep="0" rowsep="0" valign="top">De 0 à +2</entry></row><row rowsep="0"><entry colname="1" colsep="0" rowsep="0" valign="top">3</entry><entry colname="2" colsep="0" rowsep="0" valign="top">Les efforts que le contrevenant a pu déployer afin d’atténuer ou de neutraliser les incidences de la violation commise</entry><entry colname="3" colsep="0" rowsep="0" valign="top">De –2 à +2</entry></row><row rowsep="0"><entry colname="1" colsep="0" rowsep="0" valign="top">4</entry><entry colname="2" colsep="0" rowsep="0" valign="top">La négligence du contrevenant</entry><entry colname="3" colsep="0" rowsep="0" valign="top">De 0 à +2</entry></row><row lims:inforce-start-date="2022-09-27" lims:enacted-date="2022-09-27" lims:fid="1365283" lims:id="1365673" rowsep="0"><entry colname="1" colsep="0" rowsep="0" valign="top">5</entry><entry colname="2" colsep="0" rowsep="0" valign="top">Le degré de collaboration dont le contrevenant a pu faire preuve à l’endroit de la Régie relativement à la violation commise</entry><entry colname="3" colsep="0" rowsep="0" valign="top">De –2 à +2</entry></row><row lims:inforce-start-date="2022-09-27" lims:enacted-date="2022-09-27" lims:fid="1365284" lims:id="1365674" rowsep="0"><entry colname="1" colsep="0" rowsep="0" valign="top">6</entry><entry colname="2" colsep="0" rowsep="0" valign="top">La rapidité avec laquelle, après avoir pris connaissance de la violation commise, le contrevenant a pu en faire rapport à la Régie</entry><entry colname="3" colsep="0" rowsep="0" valign="top">De –2 à +2</entry></row><row rowsep="0"><entry colname="1" colsep="0" rowsep="0" valign="top">7</entry><entry colname="2" colsep="0" rowsep="0" valign="top">Les mesures que le contrevenant a pu prendre afin d’éviter que la violation commise ne se reproduise</entry><entry colname="3" colsep="0" rowsep="0" valign="top">De –2 à +2</entry></row><row rowsep="0"><entry colname="1" colsep="0" rowsep="0" valign="top">8</entry><entry colname="2" colsep="0" rowsep="0" valign="top">Dans le cas d’une violation de type B, le fait que les exigences enfreintes aient pu toucher principalement la production de rapports ou la tenue de registres</entry><entry colname="3" colsep="0" rowsep="0" valign="top">De –2 à 0</entry></row><row rowsep="0"><entry colname="1" colsep="0" rowsep="0" valign="top">9</entry><entry colname="2" colsep="0" rowsep="0" valign="top">Tout autre facteur aggravant qui a une incidence sur les personnes et l’environnement</entry><entry colname="3" colsep="0" rowsep="0" valign="top">De 0 à +3</entry></row></tbody></tgroup></table></TableGroup></Subsection><HistoricalNote><HistoricalNoteSubItem lims:inforce-start-date="2022-09-27" lims:enacted-date="2022-09-27" lims:fid="1365676" lims:id="1365676" lims:enactId="1365245">DORS/2022-199, art. 15</HistoricalNoteSubItem></HistoricalNote></Section><Heading lims:inforce-start-date="2013-06-18" lims:fid="782033" lims:id="782033" level="1"><TitleText>Signification de documents</TitleText></Heading><Section lims:inforce-start-date="2013-07-03" lims:lastAmendedDate="2022-09-27" lims:fid="782034" lims:id="782034"><MarginalNote lims:inforce-start-date="2013-07-03" lims:fid="782035" lims:id="782035">Méthodes</MarginalNote><Label>5</Label><Subsection lims:inforce-start-date="2013-07-03" lims:fid="782036" lims:id="782036"><Label>(1)</Label><Text lims:inforce-start-date="2022-09-27" lims:enacted-date="2022-09-27" lims:fid="1365280" lims:id="1365641">La signification de tout document autorisé ou exigé aux paragraphes 120(1) ou 128(2) de la Loi se fait selon l’une des méthodes suivantes :</Text><Paragraph lims:inforce-start-date="2013-07-03" lims:fid="782037" lims:id="782037"><Label>a)</Label><Text>s’il s’agit d’une personne physique :</Text><Subparagraph lims:inforce-start-date="2013-07-03" lims:fid="782038" lims:id="782038"><Label>(i)</Label><Text>par remise d’une copie à son destinataire en main propre,</Text></Subparagraph><Subparagraph lims:inforce-start-date="2013-07-03" lims:fid="782039" lims:id="782039"><Label>(ii)</Label><Text>par remise d’une copie à quiconque semble être un membre adulte du même ménage à la dernière adresse connue ou au lieu de résidence habituel du destinataire,</Text></Subparagraph><Subparagraph lims:inforce-start-date="2013-07-03" lims:fid="782040" lims:id="782040"><Label>(iii)</Label><Text>par envoi d’une copie par courrier recommandé, service de messagerie, télécopieur ou autre moyen électronique à la dernière adresse connue ou au lieu de résidence habituel du destinataire;</Text></Subparagraph></Paragraph><Paragraph lims:inforce-start-date="2013-07-03" lims:fid="782041" lims:id="782041"><Label>b)</Label><Text>s’il s’agit d’une personne morale :</Text><Subparagraph lims:inforce-start-date="2013-07-03" lims:fid="782042" lims:id="782042"><Label>(i)</Label><Text>par remise d’une copie, au siège ou à l’établissement de la personne morale, à un dirigeant ou à une autre personne physique qui semble diriger ou gérer le siège ou l’établissement,</Text></Subparagraph><Subparagraph lims:inforce-start-date="2013-07-03" lims:fid="782043" lims:id="782043"><Label>(ii)</Label><Text>par envoi d’une copie par courrier recommandé, service de messagerie ou télécopieur au siège ou à l’établissement de la personne morale,</Text></Subparagraph><Subparagraph lims:inforce-start-date="2013-07-03" lims:fid="782044" lims:id="782044"><Label>(iii)</Label><Text>par envoi d’une copie par un moyen électronique autre que le télécopieur à toute personne physique visée au sous-alinéa (i).</Text></Subparagraph></Paragraph></Subsection><Subsection lims:inforce-start-date="2013-07-03" lims:fid="782045" lims:id="782045"><MarginalNote lims:inforce-start-date="2013-07-03" lims:fid="782046" lims:id="782046">Date de la signification</MarginalNote><Label>(2)</Label><Text>La signification d’un document qui n’est pas remis à son destinataire en main propre est réputée avoir lieu à l’une des dates suivantes :</Text><Paragraph lims:inforce-start-date="2013-07-03" lims:fid="782047" lims:id="782047"><Label>a)</Label><Text>dans le cas d’une copie remise à un adulte visé au sous-alinéa (1)a)(ii), la date à laquelle le document lui est effectivement remis;</Text></Paragraph><Paragraph lims:inforce-start-date="2013-07-03" lims:fid="782048" lims:id="782048"><Label>b)</Label><Text>dans le cas d’une copie envoyée par courrier recommandé ou par service de messagerie, le dixième jour suivant la date indiquée sur l’accusé de réception;</Text></Paragraph><Paragraph lims:inforce-start-date="2013-07-03" lims:fid="782049" lims:id="782049"><Label>c)</Label><Text>dans le cas d’une copie envoyée par télécopieur ou un autre moyen électronique, la date de la transmission.</Text></Paragraph></Subsection><HistoricalNote><HistoricalNoteSubItem lims:inforce-start-date="2022-09-27" lims:enacted-date="2022-09-27" lims:fid="1365643" lims:id="1365643" lims:enactId="1365228">DORS/2022-199, art. 6</HistoricalNoteSubItem></HistoricalNote></Section><Heading lims:inforce-start-date="2013-06-18" lims:fid="782050" lims:id="782050" level="1"><TitleText>Entrée en vigueur</TitleText></Heading><Section lims:inforce-start-date="2013-06-18" lims:lastAmendedDate="2013-06-18" lims:fid="782051" lims:id="782051"><MarginalNote lims:inforce-start-date="2013-06-18" lims:fid="782052" lims:id="782052">L.C. 2012, ch. 19</MarginalNote><Label><FootnoteRef idref="fn_IndF88D_hq_12394">*</FootnoteRef>6</Label><Text>Le présent règlement entre en vigueur à la date d’entrée en vigueur de l’article 98 de la <XRefExternal reference-type="act" link="J-0.8">Loi sur l’emploi, la croissance et la prospérité durable</XRefExternal> ou, s’il est enregistré après cette date, à la date de son enregistrement.</Text><Footnote id="fn_IndF88D_hq_12394" placement="section" status="editorial"><Label>*</Label><Text>[Note : Règlement en vigueur le 3 juillet 2013, <Emphasis style="italic">voir</Emphasis> TR/2013-69.]</Text></Footnote></Section></Body><Schedule lims:inforce-start-date="2016-06-19" lims:lastAmendedDate="2022-09-27" lims:fid="782053" lims:id="782053"><ScheduleFormHeading lims:inforce-start-date="2016-06-19" lims:fid="782054" lims:id="782054"><Label>ANNEXE 1</Label><OriginatingRef>(paragraphes 2(1), (4) et 3(1))</OriginatingRef><TitleText>Violations</TitleText></ScheduleFormHeading><TableGroup lims:inforce-start-date="2022-09-27" lims:enacted-date="2022-09-27" lims:fid="782055" lims:id="1365644" pointsize="7" topmarginspacing="10"><Caption lims:inforce-start-date="2022-09-27" lims:enacted-date="2022-09-27" lims:fid="1365645" lims:id="1365645" position="over">PARTIE 1</Caption><table lims:inforce-start-date="2022-09-27" lims:enacted-date="2022-09-27" lims:fid="1365646" lims:id="1365646" frame="topbot"><title lims:inforce-start-date="2022-09-27" lims:enacted-date="2022-09-27" lims:fid="1365647" lims:id="1365647">Loi sur la Régie canadienne de l’énergie</title><tgroup lims:inforce-start-date="2022-09-27" lims:enacted-date="2022-09-27" lims:fid="1365648" lims:id="1365648" align="left" cols="4"><colspec colname="col1" colwidth="106.25*" /><colspec colname="col2" colwidth="166.26*" /><colspec colname="col3" colwidth="444.97*" /><colspec colname="col4" colwidth="170.52*" /><thead lims:inforce-start-date="2022-09-27" lims:enacted-date="2022-09-27" lims:fid="1365649" lims:id="1365649"><row topdouble="yes"><entry colsep="0" rowsep="0" valign="bottom" /><entry colsep="0" rowsep="0" valign="top">Colonne 1</entry><entry colsep="0" rowsep="0" valign="top">Colonne 2</entry><entry colsep="0" rowsep="0" valign="top">Colonne 3</entry></row><row><entry colsep="0" rowsep="1" valign="bottom">Article</entry><entry colsep="0" rowsep="1" valign="bottom">Disposition</entry><entry colsep="0" rowsep="1" valign="bottom">Sommaire</entry><entry colsep="0" rowsep="1" valign="bottom">Qualification</entry></row></thead><tbody lims:inforce-start-date="2022-09-27" lims:enacted-date="2022-09-27" lims:fid="1365650" lims:id="1365650"><row><entry colsep="0" rowsep="0">1</entry><entry colsep="0" rowheader="yes" rowsep="0">103(4)</entry><entry colsep="0" rowsep="0">Omission de prêter assistance</entry><entry colsep="0" rowsep="0">Type B</entry></row><row><entry colsep="0" rowsep="0">2</entry><entry colsep="0" rowheader="yes" rowsep="0">179(1)</entry><entry colsep="0" rowsep="0">Construction, exploitation ou cessation d’exploitation d’un pipeline par une personne autre qu’une compagnie</entry><entry colsep="0" rowsep="0">Type B</entry></row><row><entry colsep="0" rowsep="0">3</entry><entry colsep="0" rowheader="yes" rowsep="0">180(1)</entry><entry colsep="0" rowsep="0">Exploitation d’un pipeline en l’absence du certificat et de l’autorisation de mise en service</entry><entry colsep="0" rowsep="0">Type B</entry></row><row><entry colsep="0" rowsep="0">4</entry><entry colsep="0" rowheader="yes" rowsep="0">181(1)</entry><entry colsep="0" rowsep="0">Omission d’obtenir l’autorisation exigée</entry><entry colsep="0" rowsep="0">Type B</entry></row><row><entry colsep="0" rowsep="0">5</entry><entry colsep="0" rowheader="yes" rowsep="0">198a)</entry><entry colsep="0" rowsep="0">Commencer la construction d’un pipeline en l’absence du certificat</entry><entry colsep="0" rowsep="0">Type B</entry></row><row><entry colsep="0" rowsep="0">6</entry><entry colsep="0" rowheader="yes" rowsep="0">198c)</entry><entry colsep="0" rowsep="0">Commencer la construction d’un pipeline en l’absence des plan, profil et livre de renvoi approuvés</entry><entry colsep="0" rowsep="0">Type B</entry></row><row><entry colsep="0" rowsep="0">7</entry><entry colsep="0" rowheader="yes" rowsep="0">211(1)</entry><entry colsep="0" rowsep="0">Omission de soumettre pour approbation les plan, profil et livre de renvoi</entry><entry colsep="0" rowsep="0">Type B</entry></row><row><entry colsep="0" rowsep="0">8</entry><entry colsep="0" rowheader="yes" rowsep="0">213(1)</entry><entry colsep="0" rowsep="0">Mise en service d’un pipeline ou d’une section de celui‑ci pour le transport de produits sans autorisation</entry><entry colsep="0" rowsep="0">Type B</entry></row><row><entry colsep="0" rowsep="0">9</entry><entry colsep="0" rowheader="yes" rowsep="0">217(1)</entry><entry colsep="0" rowsep="0">Construction d’un pipeline sans certificat ou ordonnance</entry><entry colsep="0" rowsep="0">Type B</entry></row><row><entry colsep="0" rowsep="0">10</entry><entry colsep="0" rowheader="yes" rowsep="0">218</entry><entry colsep="0" rowsep="0">Construction ou exploitation d’un pipeline sans certificat ou ordonnance</entry><entry colsep="0" rowsep="0">Type B</entry></row><row><entry colsep="0" rowsep="0">11</entry><entry colsep="0" rowheader="yes" rowsep="0">241(1)</entry><entry colsep="0" rowsep="0">Cesser d’exploiter un pipeline sans autorisation</entry><entry colsep="0" rowsep="0">Type B</entry></row><row><entry colsep="0" rowsep="0">12</entry><entry colsep="0" rowheader="yes" rowsep="0">247</entry><entry colsep="0" rowsep="0">Construction ou exploitation d’une ligne internationale en l’absence du permis ou du certificat</entry><entry colsep="0" rowsep="0">Type B</entry></row><row><entry colsep="0" rowsep="0">13</entry><entry colsep="0" rowheader="yes" rowsep="0">265a)</entry><entry colsep="0" rowsep="0">Commencer la construction d’une ligne internationale ou interprovinciale en l’absence des plan, profil et livre de renvoi approuvés</entry><entry colsep="0" rowsep="0">Type B</entry></row><row><entry colsep="0" rowsep="0">14</entry><entry colsep="0" rowheader="yes" rowsep="0">267</entry><entry colsep="0" rowsep="0">Construction ou exploitation d’une ligne internationale ou interprovinciale sans permis ou certificat</entry><entry colsep="0" rowsep="0">Type B</entry></row><row><entry colsep="0" rowsep="0">15</entry><entry colsep="0" rowheader="yes" rowsep="0">273(1)</entry><entry colsep="0" rowsep="0">Construction d’une installation ou exercice d’une activité qui occasionne un remuement du sol sans autorisation</entry><entry colsep="0" rowsep="0">Type B</entry></row><row><entry colsep="0" rowsep="0">16</entry><entry colsep="0" rowheader="yes" rowsep="0">273(2)</entry><entry colsep="0" rowsep="0">Franchissement d’une ligne internationale ou interprovinciale par un véhicule ou de l’équipement mobile en contravention du paragraphe 273(2) de la Loi</entry><entry colsep="0" rowsep="0">Type B</entry></row><row><entry colsep="0" rowsep="0">17</entry><entry colsep="0" rowheader="yes" rowsep="0">277(1)</entry><entry colsep="0" rowsep="0">Cessation d’exploitation d’une ligne internationale ou interprovinciale désignée par un décret sans autorisation</entry><entry colsep="0" rowsep="0">Type B</entry></row><row><entry colsep="0" rowsep="0">18</entry><entry colsep="0" rowheader="yes" rowsep="0">314</entry><entry colsep="0" rowsep="0">Omission de causer le moins de dommages possibles dans l’exercice des pouvoirs conférés et d’indemniser les intéressés des dommages qu’ils ont subis</entry><entry colsep="0" rowsep="0">Type B</entry></row><row><entry colsep="0" rowsep="0">19</entry><entry colsep="0" rowheader="yes" rowsep="0">335(1)</entry><entry colsep="0" rowsep="0">Construction d’une installation ou exercice d’une activité qui occasionne le remuement du sol sans autorisation</entry><entry colsep="0" rowsep="0">Type B</entry></row><row><entry colsep="0" rowsep="0">20</entry><entry colsep="0" rowheader="yes" rowsep="0">335(2)</entry><entry colsep="0" rowsep="0">Franchissement d’un pipeline par un véhicule ou de l’équipement mobile en contravention du paragraphe 335(2) de la Loi</entry><entry colsep="0" rowsep="0">Type B</entry></row><row><entry colsep="0" rowsep="0">21</entry><entry colsep="0" rowheader="yes" rowsep="0">338(1)</entry><entry colsep="0" rowsep="0">Prospection et exploitation de gisements sans autorisation</entry><entry colsep="0" rowsep="0">Type B</entry></row></tbody></tgroup></table></TableGroup><TableGroup lims:inforce-start-date="2016-06-19" lims:fid="782062" lims:id="782062" pointsize="7" topmarginspacing="10"><Caption lims:inforce-start-date="2016-06-19" lims:fid="782063" lims:id="782063" position="over">PARTIE 2</Caption><table lims:inforce-start-date="2016-06-19" lims:fid="782064" lims:id="782064" frame="topbot"><title lims:inforce-start-date="2022-09-27" lims:enacted-date="2022-09-27" lims:fid="782065" lims:id="1365654">Règlement de la Régie canadienne de l’énergie sur les pipelines terrestres</title><tgroup lims:inforce-start-date="2016-06-19" lims:fid="782066" lims:id="782066" align="left" cols="4"><colspec colname="col1" colwidth="106.41*" /><colspec colname="col2" colwidth="167.05*" /><colspec colname="col3" colwidth="444.61*" /><colspec colname="col4" colwidth="169.93*" /><thead lims:inforce-start-date="2016-06-19" lims:fid="782067" lims:id="782067"><row topdouble="yes" valign="top"><entry colsep="0" morerows="1" rowsep="1" valign="bottom">Article</entry><entry colsep="0" rowsep="0">Colonne 1</entry><entry colsep="0" rowsep="0">Colonne 2</entry><entry colsep="0" rowsep="0">Colonne 3</entry></row><row valign="top"><entry colsep="0" rowsep="1" valign="bottom">Disposition</entry><entry colsep="0" rowsep="1" valign="bottom">Sommaire</entry><entry colsep="0" rowsep="1" valign="bottom">Qualification</entry></row></thead><tbody lims:inforce-start-date="2016-06-19" lims:fid="782068" lims:id="782068"><row valign="top"><entry colsep="0" rowsep="0">1</entry><entry colsep="0" rowheader="yes" rowsep="0">4</entry><entry colsep="0" rowsep="0">Omission de veiller à ce qu’un pipeline soit conçu, construit ou exploité, ou que son exploitation cesse, tel qu’exigé</entry><entry colsep="0" rowsep="0">Type B</entry></row><row valign="top"><entry colsep="0" rowsep="0">2</entry><entry colsep="0" rowheader="yes" rowsep="0">5.1(1)</entry><entry colsep="0" rowsep="0">Omission de soumettre les documents exigés pour approbation</entry><entry colsep="0" rowsep="0">Type B</entry></row><row lims:inforce-start-date="2022-09-27" lims:enacted-date="2022-09-27" lims:fid="1365281" lims:id="1365655" valign="top"><entry colsep="0" rowsep="0">3</entry><entry colsep="0" nameend="col4" namest="col2" rowheader="yes" rowsep="0"><Repealed>[Abrogé, DORS/2022-199, art. 9]</Repealed></entry></row><row valign="top"><entry colsep="0" rowsep="0">4</entry><entry colsep="0" rowheader="yes" rowsep="0">6.1</entry><entry colsep="0" rowsep="0">Omission d’établir, de mettre en œuvre et de maintenir un système de gestion tel qu’exigé</entry><entry colsep="0" rowsep="0">Type B</entry></row><row valign="top"><entry colsep="0" rowsep="0">5</entry><entry colsep="0" rowheader="yes" rowsep="0">6.2(1)</entry><entry colsep="0" rowsep="0">Omission de nommer un dirigeant responsable pour veiller à ce que le système de gestion soit établi, mis en œuvre et maintenu tel qu’exigé</entry><entry colsep="0" rowsep="0">Type B</entry></row><row lims:inforce-start-date="2022-09-27" lims:enacted-date="2022-09-27" lims:fid="1365285" lims:id="1365677" valign="top"><entry colsep="0" rowsep="0">6</entry><entry colsep="0" rowheader="yes" rowsep="0">6.2(2)</entry><entry colsep="0" rowsep="0">Omission de faire à la Régie la communication exigée</entry><entry colsep="0" rowsep="0">Type A</entry></row><row valign="top"><entry colsep="0" rowsep="0">7</entry><entry colsep="0" rowheader="yes" rowsep="0">6.2(3)</entry><entry colsep="0" rowsep="0">Omission de veiller à ce que le dirigeant responsable exerce les pouvoirs tel qu’exigé</entry><entry colsep="0" rowsep="0">Type B</entry></row><row valign="top"><entry colsep="0" rowsep="0">8</entry><entry colsep="0" rowheader="yes" rowsep="0">6.3(1)</entry><entry colsep="0" rowsep="0">Omission d’établir des politiques et des buts tel qu’exigé</entry><entry colsep="0" rowsep="0">Type B</entry></row><row valign="top"><entry colsep="0" rowsep="0">9</entry><entry colsep="0" rowheader="yes" rowsep="0">6.3(2)</entry><entry colsep="0" rowsep="0">Omission de fonder le système de gestion sur les politiques et les buts établis tel qu’exigé</entry><entry colsep="0" rowsep="0">Type B</entry></row><row valign="top"><entry colsep="0" rowsep="0">10</entry><entry colsep="0" rowheader="yes" rowsep="0">6.3(3)</entry><entry colsep="0" rowsep="0">Omission du dirigeant responsable de rédiger et de communiquer l’énoncé de politique exigé</entry><entry colsep="0" rowsep="0">Type B</entry></row><row valign="top"><entry colsep="0" rowsep="0">11</entry><entry colsep="0" rowheader="yes" rowsep="0">6.4</entry><entry colsep="0" rowsep="0">Omission de se doter d’une structure organisationnelle tel qu’exigé</entry><entry colsep="0" rowsep="0">Type B</entry></row><row valign="top"><entry colsep="0" rowsep="0">12</entry><entry colsep="0" rowheader="yes" rowsep="0">6.5</entry><entry colsep="0" rowsep="0">Omission d’établir, d’élaborer, de mettre en œuvre, de maintenir et de documenter des processus tel qu’exigé</entry><entry colsep="0" rowsep="0">Type B</entry></row><row valign="top"><entry colsep="0" rowsep="0">13</entry><entry colsep="0" rowheader="yes" rowsep="0">6.6</entry><entry colsep="0" rowsep="0">Omission d’établir un rapport annuel et de présenter une déclaration tel qu’exigé</entry><entry colsep="0" rowsep="0">Type B</entry></row><row lims:inforce-start-date="2022-09-27" lims:enacted-date="2022-09-27" lims:fid="1365282" lims:id="1365662" valign="top"><entry colsep="0" rowsep="0">14</entry><entry colsep="0" rowheader="yes" rowsep="0">9</entry><entry colsep="0" rowsep="0">Omission de concevoir en détail le pipeline et de soumettre à la Régie la conception lorsqu’elle l’exige</entry><entry colsep="0" rowsep="0">Type B</entry></row><row valign="top"><entry colsep="0" rowsep="0">15</entry><entry colsep="0" rowheader="yes" rowsep="0">10(1)</entry><entry colsep="0" rowsep="0">Omission de préparer une évaluation des risques documentée tel qu’exigé</entry><entry colsep="0" rowsep="0">Type B</entry></row><row lims:inforce-start-date="2022-09-27" lims:enacted-date="2022-09-27" lims:fid="1365286" lims:id="1365678" valign="top"><entry colsep="0" rowsep="0">16</entry><entry colsep="0" rowheader="yes" rowsep="0">10(2)</entry><entry colsep="0" rowsep="0">Omission de soumettre l’évaluation documentée des risques à la Régie lorsqu’elle l’exige</entry><entry colsep="0" rowsep="0">Type A</entry></row><row valign="top"><entry colsep="0" rowsep="0">17</entry><entry colsep="0" rowheader="yes" rowsep="0">11</entry><entry colsep="0" rowsep="0">Omission de concevoir la station et de la pourvoir d’installations tel qu’exigé</entry><entry colsep="0" rowsep="0">Type B</entry></row><row valign="top"><entry colsep="0" rowsep="0">18</entry><entry colsep="0" rowheader="yes" rowsep="0">12</entry><entry colsep="0" rowsep="0">Omission de munir la station de compression ou de pompage d’une source d’énergie auxiliaire tel qu’exigé</entry><entry colsep="0" rowsep="0">Type B</entry></row><row valign="top"><entry colsep="0" rowsep="0">19</entry><entry colsep="0" rowheader="yes" rowsep="0">13</entry><entry colsep="0" rowsep="0">Omission de situer, de pourvoir ou de concevoir l’installation de stockage tel qu’exigé</entry><entry colsep="0" rowsep="0">Type B</entry></row><row lims:inforce-start-date="2022-09-27" lims:enacted-date="2022-09-27" lims:fid="1365287" lims:id="1365679" valign="top"><entry colsep="0" rowsep="0">20</entry><entry colsep="0" rowheader="yes" rowsep="0">14</entry><entry colsep="0" rowsep="0">Omission d’établir les exigences techniques et de les soumettre à la Régie lorsqu’elle l’exige</entry><entry colsep="0" rowsep="0">Type B</entry></row><row valign="top"><entry colsep="0" rowsep="0">21</entry><entry colsep="0" rowheader="yes" rowsep="0">15</entry><entry colsep="0" rowsep="0">Omission d’établir un programme d’assurance de la qualité tel qu’exigé</entry><entry colsep="0" rowsep="0">Type B</entry></row><row lims:inforce-start-date="2022-09-27" lims:enacted-date="2022-09-27" lims:fid="1365288" lims:id="1365680" valign="top"><entry colsep="0" rowsep="0">22</entry><entry colsep="0" rowheader="yes" rowsep="0">16</entry><entry colsep="0" rowsep="0">Omission d’établir le programme d’assemblage exigé et de le soumettre à la Régie lorsqu’elle l’exige</entry><entry colsep="0" rowsep="0">Type B</entry></row><row valign="top"><entry colsep="0" rowsep="0">23</entry><entry colsep="0" rowheader="yes" rowsep="0">17</entry><entry colsep="0" rowsep="0">Omission de vérifier chaque joint tel qu’exigé</entry><entry colsep="0" rowsep="0">Type B</entry></row><row valign="top"><entry colsep="0" rowsep="0">24</entry><entry colsep="0" rowheader="yes" rowsep="0">18</entry><entry colsep="0" rowsep="0">Omission d’obtenir des services par contrat tel qu’exigé</entry><entry colsep="0" rowsep="0">Type B</entry></row><row valign="top"><entry colsep="0" rowsep="0">25</entry><entry colsep="0" rowheader="yes" rowsep="0">19a)</entry><entry colsep="0" rowsep="0">Omission de veiller à ce que les travaux de construction ne constituent pas un danger pour le public ou pour l’environnement</entry><entry colsep="0" rowsep="0">Type B</entry></row><row valign="top"><entry colsep="0" rowsep="0">26</entry><entry colsep="0" rowheader="yes" rowsep="0">19b)</entry><entry colsep="0" rowsep="0">Omission d’informer les personnes des pratiques et procédures de sécurité tel qu’exigé</entry><entry colsep="0" rowsep="0">Type B</entry></row><row lims:inforce-start-date="2022-09-27" lims:enacted-date="2022-09-27" lims:fid="1365289" lims:id="1365681" valign="top"><entry colsep="0" rowsep="0">27</entry><entry colsep="0" rowheader="yes" rowsep="0">20(1)</entry><entry colsep="0" rowsep="0">Omission d’établir un manuel sur la sécurité en matière de construction et de le soumettre à la Régie</entry><entry colsep="0" rowsep="0">Type B</entry></row><row valign="top"><entry colsep="0" rowsep="0">28</entry><entry colsep="0" rowheader="yes" rowsep="0">20(1.1)</entry><entry colsep="0" rowsep="0">Omission d’inclure les responsabilités tel qu’exigé</entry><entry colsep="0" rowsep="0">Type B</entry></row><row valign="top"><entry colsep="0" rowsep="0">29</entry><entry colsep="0" rowheader="yes" rowsep="0">20(2)</entry><entry colsep="0" rowsep="0">Omission de conserver un exemplaire du manuel sur la sécurité en matière de construction ou de ses parties pertinentes tel qu’exigé</entry><entry colsep="0" rowsep="0">Type B</entry></row><row valign="top"><entry colsep="0" rowsep="0">30</entry><entry colsep="0" rowheader="yes" rowsep="0">21</entry><entry colsep="0" rowsep="0">Omission de remettre en état l’emprise et les aires de travail temporaires du pipeline tel qu’exigé</entry><entry colsep="0" rowsep="0">Type B</entry></row><row valign="top"><entry colsep="0" rowsep="0">31</entry><entry colsep="0" rowheader="yes" rowsep="0">22</entry><entry colsep="0" rowsep="0">Omission de veiller à ce que l’utilisation de l’installation de service public ou de la route privée ne soit pas indûment gênée par la construction du pipeline</entry><entry colsep="0" rowsep="0">Type B</entry></row><row lims:inforce-start-date="2022-09-27" lims:enacted-date="2022-09-27" lims:fid="1365290" lims:id="1365682" valign="top"><entry colsep="0" rowsep="0">32</entry><entry colsep="0" rowheader="yes" rowsep="0">23</entry><entry colsep="0" rowsep="0">Omission d’établir le programme exigé relativement aux essais sous pression et de le soumettre à la Régie lorsqu’elle l’exige</entry><entry colsep="0" rowsep="0">Type B</entry></row><row valign="top"><entry colsep="0" rowsep="0">33</entry><entry colsep="0" rowheader="yes" rowsep="0">24</entry><entry colsep="0" rowsep="0">Essai sous pression effectué sans les permis exigés</entry><entry colsep="0" rowsep="0">Type B</entry></row><row valign="top"><entry colsep="0" rowsep="0">34</entry><entry colsep="0" rowheader="yes" rowsep="0">25</entry><entry colsep="0" rowsep="0">Omission d’effectuer les essais sous pression tel qu’exigé</entry><entry colsep="0" rowsep="0">Type B</entry></row><row valign="top"><entry colsep="0" rowsep="0">35</entry><entry colsep="0" rowheader="yes" rowsep="0">26</entry><entry colsep="0" rowsep="0">Omission de limiter autant que possible le nombre de soudures qui ne sont pas soumises à un essai sous pression</entry><entry colsep="0" rowsep="0">Type B</entry></row><row lims:inforce-start-date="2022-09-27" lims:enacted-date="2022-09-27" lims:fid="1365291" lims:id="1365683" valign="top"><entry colsep="0" rowsep="0">36</entry><entry colsep="0" rowheader="yes" rowsep="0">27</entry><entry colsep="0" rowsep="0">Omission d’établir, de réviser régulièrement et de mettre à jour au besoin les manuels d’exploitation et d’entretien tel qu’il est exigé et de les soumettre à la Régie lorsqu’elle l’exige</entry><entry colsep="0" rowsep="0">Type B</entry></row><row valign="top"><entry colsep="0" rowsep="0">37</entry><entry colsep="0" rowheader="yes" rowsep="0">28</entry><entry colsep="0" rowsep="0">Omission d’informer les personnes des pratiques et procédures et de mettre à leur disposition les parties pertinentes des manuels d’exploitation et d’entretien tel qu’exigé</entry><entry colsep="0" rowsep="0">Type B</entry></row><row valign="top"><entry colsep="0" rowsep="0">38</entry><entry colsep="0" rowheader="yes" rowsep="0">29</entry><entry colsep="0" rowsep="0">Omission d’obtenir des services par contrat tel qu’exigé</entry><entry colsep="0" rowsep="0">Type B</entry></row><row valign="top"><entry colsep="0" rowsep="0">39</entry><entry colsep="0" rowheader="yes" rowsep="0">30a)</entry><entry colsep="0" rowsep="0">Omission de prendre les mesures raisonnables pour veiller à ce que les travaux d’entretien ne constituent pas un danger pour le public ou pour l’environnement</entry><entry colsep="0" rowsep="0">Type B</entry></row><row valign="top"><entry colsep="0" rowsep="0">40</entry><entry colsep="0" rowheader="yes" rowsep="0">30b)</entry><entry colsep="0" rowsep="0">Omission de prendre les mesures raisonnables pour informer les personnes des pratiques et procédures pour assurer leur sécurité et la protection de l’environnement tel qu’exigé</entry><entry colsep="0" rowsep="0">Type B</entry></row><row lims:inforce-start-date="2022-09-27" lims:enacted-date="2022-09-27" lims:fid="1365292" lims:id="1365684" valign="top"><entry colsep="0" rowsep="0">41</entry><entry colsep="0" rowheader="yes" rowsep="0">31(1)</entry><entry colsep="0" rowsep="0">Omission d’établir un manuel de sécurité en matière d’entretien et de le soumettre à la Régie lorsqu’elle l’exige</entry><entry colsep="0" rowsep="0">Type B</entry></row><row valign="top"><entry colsep="0" rowsep="0">42</entry><entry colsep="0" rowheader="yes" rowsep="0">31(1.1)</entry><entry colsep="0" rowsep="0">Omission d’inclure les responsabilités tel qu’exigé</entry><entry colsep="0" rowsep="0">Type B</entry></row><row valign="top"><entry colsep="0" rowsep="0">43</entry><entry colsep="0" rowheader="yes" rowsep="0">31(2)</entry><entry colsep="0" rowsep="0">Omission de conserver un exemplaire du manuel de sécurité en matière d’entretien ou de ses parties pertinentes tel qu’exigé</entry><entry colsep="0" rowsep="0">Type B</entry></row><row valign="top"><entry colsep="0" rowsep="0">44</entry><entry colsep="0" rowheader="yes" rowsep="0">32(1)</entry><entry colsep="0" rowsep="0">Omission d’établir, de mettre en œuvre et de maintenir un programme de gestion des situations d’urgence tel qu’exigé</entry><entry colsep="0" rowsep="0">Type B</entry></row><row valign="top"><entry colsep="0" rowsep="0">45</entry><entry colsep="0" rowheader="yes" rowsep="0">32(1.1)</entry><entry colsep="0" rowsep="0">Omission d’élaborer, de réviser régulièrement et de mettre à jour un manuel des mesures d’urgence</entry><entry colsep="0" rowsep="0">Type B</entry></row><row lims:inforce-start-date="2022-09-27" lims:enacted-date="2022-09-27" lims:fid="1365293" lims:id="1365685" valign="top"><entry colsep="0" rowsep="0">46</entry><entry colsep="0" rowheader="yes" rowsep="0">32(2)</entry><entry colsep="0" rowsep="0">Omission de soumettre à la Régie le manuel des mesures d’urgence, ainsi que ses versions révisées</entry><entry colsep="0" rowsep="0">Type A</entry></row><row valign="top"><entry colsep="0" rowsep="0">47</entry><entry colsep="0" rowheader="yes" rowsep="0">33</entry><entry colsep="0" rowsep="0">Omission d’entrer et de demeurer en communication et de consulter tel qu’exigé</entry><entry colsep="0" rowsep="0">Type B</entry></row><row valign="top"><entry colsep="0" rowsep="0">48</entry><entry colsep="0" rowheader="yes" rowsep="0">34</entry><entry colsep="0" rowsep="0">Omission d’informer les personnes qui peuvent être associées à une activité d’intervention en cas d’urgence tel qu’exigé</entry><entry colsep="0" rowsep="0">Type B</entry></row><row valign="top"><entry colsep="0" rowsep="0">49</entry><entry colsep="0" rowheader="yes" rowsep="0">35</entry><entry colsep="0" rowsep="0">Omission d’établir un programme d’éducation permanente tel qu’exigé</entry><entry colsep="0" rowsep="0">Type B</entry></row><row valign="top"><entry colsep="0" rowsep="0">50</entry><entry colsep="0" rowheader="yes" rowsep="0">36a)</entry><entry colsep="0" rowsep="0">Omission de disposer d’installations de communication tel qu’exigé</entry><entry colsep="0" rowsep="0">Type B</entry></row><row valign="top"><entry colsep="0" rowsep="0">51</entry><entry colsep="0" rowheader="yes" rowsep="0">36b)</entry><entry colsep="0" rowsep="0">Omission de vérifier régulièrement les instruments et les appareils tel qu’exigé</entry><entry colsep="0" rowsep="0">Type B</entry></row><row valign="top"><entry colsep="0" rowsep="0">52</entry><entry colsep="0" rowheader="yes" rowsep="0">36c)</entry><entry colsep="0" rowsep="0">Omission d’enregistrer sur une base continue tel qu’exigé</entry><entry colsep="0" rowsep="0">Type B</entry></row><row valign="top"><entry colsep="0" rowsep="0">53</entry><entry colsep="0" rowheader="yes" rowsep="0">36d)</entry><entry colsep="0" rowsep="0">Omission de marquer clairement les vannes tel qu’exigé</entry><entry colsep="0" rowsep="0">Type B</entry></row><row valign="top"><entry colsep="0" rowsep="0">54</entry><entry colsep="0" rowheader="yes" rowsep="0">36e)</entry><entry colsep="0" rowsep="0">Omission de marquer clairement les vannes tel qu’exigé</entry><entry colsep="0" rowsep="0">Type B</entry></row><row valign="top"><entry colsep="0" rowsep="0">55</entry><entry colsep="0" rowheader="yes" rowsep="0">36f)</entry><entry colsep="0" rowsep="0">Omission de poser des panneaux tel qu’exigé</entry><entry colsep="0" rowsep="0">Type B</entry></row><row valign="top"><entry colsep="0" rowsep="0">56</entry><entry colsep="0" rowheader="yes" rowsep="0">37</entry><entry colsep="0" rowsep="0">Omission d’établir et de mettre sur pied un système de commande du pipeline tel qu’exigé</entry><entry colsep="0" rowsep="0">Type B</entry></row><row valign="top"><entry colsep="0" rowsep="0">57</entry><entry colsep="0" rowheader="yes" rowsep="0">38(1)</entry><entry colsep="0" rowsep="0">Soudure sur un pipeline rempli de liquide autrement que dans les conditions exigées</entry><entry colsep="0" rowsep="0">Type B</entry></row><row valign="top"><entry colsep="0" rowsep="0">58</entry><entry colsep="0" rowheader="yes" rowsep="0">38(2)</entry><entry colsep="0" rowsep="0">Omission de considérer les soudures comme une installation temporaire et de les remplacer de façon permanente dès que possible</entry><entry colsep="0" rowsep="0">Type B</entry></row><row valign="top"><entry colsep="0" rowsep="0">59</entry><entry colsep="0" rowheader="yes" rowsep="0">38(3)</entry><entry colsep="0" rowsep="0">Omission de soumettre les exigences techniques, les procédés et les résultats pour approbation tel qu’exigé</entry><entry colsep="0" rowsep="0">Type B</entry></row><row valign="top"><entry colsep="0" rowsep="0">60</entry><entry colsep="0" rowheader="yes" rowsep="0">39</entry><entry colsep="0" rowsep="0">Omission d’établir un programme de surveillance et de contrôle tel qu’exigé</entry><entry colsep="0" rowsep="0">Type B</entry></row><row valign="top"><entry colsep="0" rowsep="0">61</entry><entry colsep="0" rowheader="yes" rowsep="0">40</entry><entry colsep="0" rowsep="0">Omission d’établir, de mettre en œuvre et d’entretenir un programme de gestion de l’intégrité tel qu’exigé</entry><entry colsep="0" rowsep="0">Type B</entry></row><row valign="top"><entry colsep="0" rowsep="0">62</entry><entry colsep="0" rowheader="yes" rowsep="0">41(1)</entry><entry colsep="0" rowsep="0">Omission de documenter la défectuosité sur le pipeline tel qu’exigé</entry><entry colsep="0" rowsep="0">Type B</entry></row><row valign="top"><entry colsep="0" rowsep="0">63</entry><entry colsep="0" rowheader="yes" rowsep="0">41(2)</entry><entry colsep="0" rowsep="0">Omission de soumettre la documentation visée au paragraphe 41(1) lorsqu’elle est exigée</entry><entry colsep="0" rowsep="0">Type A</entry></row><row valign="top"><entry colsep="0" rowsep="0">64</entry><entry colsep="0" rowheader="yes" rowsep="0">42</entry><entry colsep="0" rowsep="0">Omission de soumettre le plan proposé tel qu’exigé</entry><entry colsep="0" rowsep="0">Type B</entry></row><row valign="top"><entry colsep="0" rowsep="0">65</entry><entry colsep="0" rowheader="yes" rowsep="0">43</entry><entry colsep="0" rowsep="0">Omission de présenter une demande pour modifier un service ou augmenter la pression maximale de service tel qu’exigé</entry><entry colsep="0" rowsep="0">Type B</entry></row><row valign="top"><entry colsep="0" rowsep="0">66</entry><entry colsep="0" rowheader="yes" rowsep="0">44</entry><entry colsep="0" rowsep="0">Omission de présenter une demande de désactivation tel qu’exigé</entry><entry colsep="0" rowsep="0">Type B</entry></row><row valign="top"><entry colsep="0" rowsep="0">67</entry><entry colsep="0" rowheader="yes" rowsep="0">45</entry><entry colsep="0" rowsep="0">Omission de présenter une demande de réactivation tel qu’exigé</entry><entry colsep="0" rowsep="0">Type B</entry></row><row valign="top"><entry colsep="0" rowsep="0">68</entry><entry colsep="0" rowheader="yes" rowsep="0">45.1</entry><entry colsep="0" rowsep="0">Omission de présenter une demande de désaffectation tel qu’exigé</entry><entry colsep="0" rowsep="0">Type B</entry></row><row valign="top"><entry colsep="0" rowsep="0">69</entry><entry colsep="0" rowheader="yes" rowsep="0">46</entry><entry colsep="0" rowsep="0">Omission d’établir et de mettre en œuvre un programme de formation tel qu’exigé</entry><entry colsep="0" rowsep="0">Type B</entry></row><row valign="top"><entry colsep="0" rowsep="0">70</entry><entry colsep="0" rowheader="yes" rowsep="0">47</entry><entry colsep="0" rowsep="0">Omission d’établir, de mettre en œuvre et de maintenir un programme de gestion de la sécurité tel qu’exigé</entry><entry colsep="0" rowsep="0">Type B</entry></row><row valign="top"><entry colsep="0" rowsep="0">71</entry><entry colsep="0" rowheader="yes" rowsep="0">47.1</entry><entry colsep="0" rowsep="0">Omission d’établir, de mettre en œuvre et de maintenir un programme de gestion de la sûreté tel qu’exigé</entry><entry colsep="0" rowsep="0">Type B</entry></row><row><entry colsep="0" rowsep="0">71.1</entry><entry colsep="0" rowheader="yes" rowsep="0">47.2</entry><entry colsep="0" rowsep="0">Omission d’établir, de mettre en oeuvre et de maintenir un programme de prévention des dommages tel qu’exigé</entry><entry colsep="0" rowsep="0">Type B</entry></row><row valign="top"><entry colsep="0" rowsep="0">72</entry><entry colsep="0" rowheader="yes" rowsep="0">48</entry><entry colsep="0" rowsep="0">Omission d’établir, de mettre en œuvre et de maintenir un programme de protection environnementale tel qu’exigé</entry><entry colsep="0" rowsep="0">Type B</entry></row><row valign="top"><entry colsep="0" rowsep="0">73</entry><entry colsep="0" rowheader="yes" rowsep="0">51a)</entry><entry colsep="0" rowsep="0">Omission d’informer tel qu’exigé</entry><entry colsep="0" rowsep="0">Type A</entry></row><row lims:inforce-start-date="2022-09-27" lims:enacted-date="2022-09-27" lims:fid="1365294" lims:id="1365686" valign="top"><entry colsep="0" rowsep="0">74</entry><entry colsep="0" rowheader="yes" rowsep="0">51b)</entry><entry colsep="0" rowsep="0">Omission de présenter à la Régie sur demande un rapport sur le croisement tel qu’exigé</entry><entry colsep="0" rowsep="0">Type A</entry></row><row lims:inforce-start-date="2022-09-27" lims:enacted-date="2022-09-27" lims:fid="1365295" lims:id="1365687" valign="top"><entry colsep="0" rowsep="0">75</entry><entry colsep="0" rowheader="yes" rowsep="0">52(1)</entry><entry colsep="0" rowsep="0">Omission de signaler tout incident et de présenter un rapport à la Régie tel qu’exigé</entry><entry colsep="0" rowsep="0">Type A</entry></row><row valign="top"><entry colsep="0" rowsep="0">76</entry><entry colsep="0" rowheader="yes" rowsep="0">53(1)</entry><entry colsep="0" rowsep="0">Omission de procéder à des inspections et à des vérifications tel qu’exigé</entry><entry colsep="0" rowsep="0">Type B</entry></row><row valign="top"><entry colsep="0" rowsep="0">77</entry><entry colsep="0" rowheader="yes" rowsep="0">53(2)</entry><entry colsep="0" rowsep="0">Omission de documenter la vérification tel qu’exigé</entry><entry colsep="0" rowsep="0">Type B</entry></row><row valign="top"><entry colsep="0" rowsep="0">78</entry><entry colsep="0" rowheader="yes" rowsep="0">54(1)</entry><entry colsep="0" rowsep="0">Omission d’inspecter les travaux de construction du pipeline tel qu’exigé</entry><entry colsep="0" rowsep="0">Type B</entry></row><row valign="top"><entry colsep="0" rowsep="0">79</entry><entry colsep="0" rowheader="yes" rowsep="0">54(2)</entry><entry colsep="0" rowsep="0">Inspection faite par une personne qui ne possède pas le savoir-faire, les connaissances et la formation voulus pour s’en acquitter avec compétence</entry><entry colsep="0" rowsep="0">Type B</entry></row><row valign="top"><entry colsep="0" rowsep="0">80</entry><entry colsep="0" rowheader="yes" rowsep="0">55</entry><entry colsep="0" rowsep="0">Omission d’effectuer et de documenter les vérifications tel qu’exigé</entry><entry colsep="0" rowsep="0">Type B</entry></row><row valign="top"><entry colsep="0" rowsep="0">81</entry><entry colsep="0" rowheader="yes" rowsep="0">56</entry><entry colsep="0" rowsep="0">Omission de conserver les renseignements tel qu’exigé</entry><entry colsep="0" rowsep="0">Type A</entry></row></tbody></tgroup></table></TableGroup><TableGroup lims:inforce-start-date="2016-06-19" lims:fid="782069" lims:id="782069" pointsize="7" topmarginspacing="10"><Caption lims:inforce-start-date="2016-06-19" lims:fid="782070" lims:id="782070" position="over">PARTIE 3</Caption><table lims:inforce-start-date="2016-06-19" lims:fid="782071" lims:id="782071" frame="topbot"><title lims:inforce-start-date="2022-09-27" lims:enacted-date="2022-09-27" lims:fid="782072" lims:id="1365663">Règlement de la Régie canadienne de l’énergie sur les usines de traitement</title><tgroup lims:inforce-start-date="2016-06-19" lims:fid="782073" lims:id="782073" align="left" cols="4"><colspec colname="col1" colwidth="106.41*" /><colspec colname="col2" colwidth="167.05*" /><colspec colname="col3" colwidth="444.61*" /><colspec colname="col4" colwidth="169.93*" /><thead lims:inforce-start-date="2016-06-19" lims:fid="782074" lims:id="782074"><row topdouble="yes" valign="top"><entry colsep="0" morerows="1" rowsep="1" valign="bottom">Article</entry><entry colsep="0" rowsep="0">Colonne 1</entry><entry colsep="0" rowsep="0">Colonne 2</entry><entry colsep="0" rowsep="0">Colonne 3</entry></row><row valign="top"><entry colsep="0" rowsep="1" valign="bottom">Disposition</entry><entry colsep="0" rowsep="1" valign="bottom">Sommaire</entry><entry colsep="0" rowsep="1" valign="bottom">Qualification</entry></row></thead><tbody lims:inforce-start-date="2016-06-19" lims:fid="782075" lims:id="782075"><row valign="top"><entry colsep="0" rowsep="0">1</entry><entry colsep="0" rowheader="yes" rowsep="0">4(1)</entry><entry colsep="0" rowsep="0">Omission de veiller à ce que l’usine de traitement de la compagnie soit conçue, construite ou exploitée, ou que son exploitation cesse, tel qu’exigé</entry><entry colsep="0" rowsep="0">Type B</entry></row><row valign="top"><entry colsep="0" rowsep="0">2</entry><entry colsep="0" rowheader="yes" rowsep="0">5</entry><entry colsep="0" rowsep="0">Omission de veiller à ce que l’usine de traitement de la compagnie soit conçue, construite ou exploitée, ou que son exploitation cesse, tel qu’exigé</entry><entry colsep="0" rowsep="0">Type B</entry></row><row lims:inforce-start-date="2022-09-27" lims:enacted-date="2022-09-27" lims:fid="1365296" lims:id="1365688" valign="top"><entry colsep="0" rowsep="0">3</entry><entry colsep="0" rowheader="yes" rowsep="0">9</entry><entry colsep="0" rowsep="0">Omission d’élaborer et de soumettre à la Régie le programme exigé</entry><entry colsep="0" rowsep="0">Type B</entry></row><row valign="top"><entry colsep="0" rowsep="0">4</entry><entry colsep="0" rowheader="yes" rowsep="0">10</entry><entry colsep="0" rowsep="0">Omission d’élaborer, de mettre en application et de tenir à jour les programmes de contrôle de la qualité et d’assurance de la qualité exigés</entry><entry colsep="0" rowsep="0">Type B</entry></row><row valign="top"><entry colsep="0" rowsep="0">5</entry><entry colsep="0" rowheader="yes" rowsep="0">11</entry><entry colsep="0" rowsep="0">Omission de réaliser une analyse des risques tel qu’exigé</entry><entry colsep="0" rowsep="0">Type B</entry></row><row valign="top"><entry colsep="0" rowsep="0">6</entry><entry colsep="0" rowheader="yes" rowsep="0">12</entry><entry colsep="0" rowsep="0">Omission de veiller à ce que les employés aient les connaissances et la formation tel qu’exigé</entry><entry colsep="0" rowsep="0">Type B</entry></row><row valign="top"><entry colsep="0" rowsep="0">7</entry><entry colsep="0" rowheader="yes" rowsep="0">13</entry><entry colsep="0" rowsep="0">Omission d’élaborer et de mettre en application un programme de sécurité tel qu’exigé</entry><entry colsep="0" rowsep="0">Type B</entry></row><row valign="top"><entry colsep="0" rowsep="0">8</entry><entry colsep="0" rowheader="yes" rowsep="0">14</entry><entry colsep="0" rowsep="0">Omission d’élaborer et de mettre en application un programme de protection de l’environnement tel qu’exigé</entry><entry colsep="0" rowsep="0">Type B</entry></row><row valign="top"><entry colsep="0" rowsep="0">9</entry><entry colsep="0" rowheader="yes" rowsep="0">15</entry><entry colsep="0" rowsep="0">Omission d’obtenir des services par contrat tel qu’exigé</entry><entry colsep="0" rowsep="0">Type B</entry></row><row valign="top"><entry colsep="0" rowsep="0">10</entry><entry colsep="0" rowheader="yes" rowsep="0">16</entry><entry colsep="0" rowsep="0">Omission d’élaborer, de mettre en application et de tenir à jour des dessins détaillés de l’usine de traitement</entry><entry colsep="0" rowsep="0">Type B</entry></row><row valign="top"><entry colsep="0" rowsep="0">11</entry><entry colsep="0" rowheader="yes" rowsep="0">17</entry><entry colsep="0" rowsep="0">Omission de veiller à munir l’usine d’une source d’alimentation électrique d’urgence tel qu’exigé</entry><entry colsep="0" rowsep="0">Type B</entry></row><row valign="top"><entry colsep="0" rowsep="0">12</entry><entry colsep="0" rowheader="yes" rowsep="0">18</entry><entry colsep="0" rowsep="0">Omission de veiller à ce que chaque réservoir soit conçu, construit et entretenu tel qu’exigé</entry><entry colsep="0" rowsep="0">Type B</entry></row><row valign="top"><entry colsep="0" rowsep="0">13</entry><entry colsep="0" rowheader="yes" rowsep="0">19</entry><entry colsep="0" rowsep="0">Omission de veiller à ce qu’aucun appareil n’entre en contact avec des sources de vapeurs inflammables tel qu’exigé</entry><entry colsep="0" rowsep="0">Type B</entry></row><row valign="top"><entry colsep="0" rowsep="0">14</entry><entry colsep="0" rowheader="yes" rowsep="0">20</entry><entry colsep="0" rowsep="0">Omission de veiller à ce que les cuves de traitement et l’équipement soient ventilés tel qu’exigé</entry><entry colsep="0" rowsep="0">Type B</entry></row><row valign="top"><entry colsep="0" rowsep="0">15</entry><entry colsep="0" rowheader="yes" rowsep="0">21</entry><entry colsep="0" rowsep="0">Omission de munir tous les collecteurs de torche d’un dispositif tel qu’exigé</entry><entry colsep="0" rowsep="0">Type B</entry></row><row valign="top"><entry colsep="0" rowsep="0">16</entry><entry colsep="0" rowheader="yes" rowsep="0">22</entry><entry colsep="0" rowsep="0">Omission d’équiper les cuves et les bâtiments visés de systèmes d’extinction des incendies fiables tel qu’exigé</entry><entry colsep="0" rowsep="0">Type B</entry></row><row valign="top"><entry colsep="0" rowsep="0">17</entry><entry colsep="0" rowheader="yes" rowsep="0">23</entry><entry colsep="0" rowsep="0">Omission de munir l’usine de traitement des systèmes tel qu’exigé</entry><entry colsep="0" rowsep="0">Type B</entry></row><row valign="top"><entry colsep="0" rowsep="0">18</entry><entry colsep="0" rowheader="yes" rowsep="0">24</entry><entry colsep="0" rowsep="0">Omission de munir l’usine de traitement de dispositifs d’alarme tel qu’exigé</entry><entry colsep="0" rowsep="0">Type B</entry></row><row valign="top"><entry colsep="0" rowsep="0">19</entry><entry colsep="0" rowheader="yes" rowsep="0">25</entry><entry colsep="0" rowsep="0">Omission de veiller à ce que la tuyauterie et tous les systèmes de décharge soient conçus et construits tel qu’exigé</entry><entry colsep="0" rowsep="0">Type B</entry></row><row valign="top"><entry colsep="0" rowsep="0">20</entry><entry colsep="0" rowheader="yes" rowsep="0">26a)</entry><entry colsep="0" rowsep="0">Omission de veiller à ce que la construction ne cause pas de dommages ni ne constitue un danger tel qu’exigé</entry><entry colsep="0" rowsep="0">Type B</entry></row><row valign="top"><entry colsep="0" rowsep="0">21</entry><entry colsep="0" rowheader="yes" rowsep="0">26b)</entry><entry colsep="0" rowsep="0">Omission d’informer les personnes sur le chantier tel qu’exigé</entry><entry colsep="0" rowsep="0">Type B</entry></row><row valign="top"><entry colsep="0" rowsep="0">22</entry><entry colsep="0" rowheader="yes" rowsep="0">26c)</entry><entry colsep="0" rowsep="0">Omission d’informer les personnes sur le chantier tel qu’exigé</entry><entry colsep="0" rowsep="0">Type B</entry></row><row valign="top"><entry colsep="0" rowsep="0">23</entry><entry colsep="0" rowheader="yes" rowsep="0">27(1)</entry><entry colsep="0" rowsep="0">Omission d’élaborer, de mettre en application et de soumettre un manuel sur la sécurité en matière de construction</entry><entry colsep="0" rowsep="0">Type B</entry></row><row valign="top"><entry colsep="0" rowsep="0">24</entry><entry colsep="0" rowheader="yes" rowsep="0">27(2)</entry><entry colsep="0" rowsep="0">Omission de conserver un exemplaire du manuel sur la sécurité en matière de construction à l’usine de traitement tel qu’exigé</entry><entry colsep="0" rowsep="0">Type B</entry></row><row valign="top"><entry colsep="0" rowsep="0">25</entry><entry colsep="0" rowheader="yes" rowsep="0">28(1)</entry><entry colsep="0" rowsep="0">Omission de veiller à la supervision directe des essais sous pression tel qu’exigé</entry><entry colsep="0" rowsep="0">Type B</entry></row><row valign="top"><entry colsep="0" rowsep="0">26</entry><entry colsep="0" rowheader="yes" rowsep="0">28(2)</entry><entry colsep="0" rowsep="0">Omission de veiller à l’absence de tout lien avec l’entrepreneur tel qu’exigé</entry><entry colsep="0" rowsep="0">Type B</entry></row><row valign="top"><entry colsep="0" rowsep="0">27</entry><entry colsep="0" rowheader="yes" rowsep="0">28(3)</entry><entry colsep="0" rowsep="0">Omission de dater et de signer les registres</entry><entry colsep="0" rowsep="0">Type B</entry></row><row valign="top"><entry colsep="0" rowsep="0">28</entry><entry colsep="0" rowheader="yes" rowsep="0">29</entry><entry colsep="0" rowsep="0">Omission de la compagnie d’élaborer et de mettre en application un programme de vérification par examen non destructif tel qu’exigé</entry><entry colsep="0" rowsep="0">Type B</entry></row><row valign="top"><entry colsep="0" rowsep="0">29</entry><entry colsep="0" rowheader="yes" rowsep="0">30(1)a)</entry><entry colsep="0" rowsep="0">Omission d’élaborer, de mettre en application, de réviser périodiquement et de mettre à jour les manuels d’exploitation tel qu’exigé</entry><entry colsep="0" rowsep="0">Type B</entry></row><row valign="top"><entry colsep="0" rowsep="0">30</entry><entry colsep="0" rowheader="yes" rowsep="0">30(1)b)</entry><entry colsep="0" rowsep="0">Omission de conserver un exemplaire des manuels d’exploitation tel qu’exigé</entry><entry colsep="0" rowsep="0">Type B</entry></row><row valign="top"><entry colsep="0" rowsep="0">31</entry><entry colsep="0" rowheader="yes" rowsep="0">30(2)</entry><entry colsep="0" rowsep="0">Omission de veiller à ce que les manuels d’exploitation contiennent des méthodes de travail exigées</entry><entry colsep="0" rowsep="0">Type B</entry></row><row valign="top"><entry colsep="0" rowsep="0">32</entry><entry colsep="0" rowheader="yes" rowsep="0">31(2)</entry><entry colsep="0" rowsep="0">Omission d’élaborer et de mettre en application un système de permis de travail tel qu’exigé</entry><entry colsep="0" rowsep="0">Type B</entry></row><row valign="top"><entry colsep="0" rowsep="0">33</entry><entry colsep="0" rowheader="yes" rowsep="0">32</entry><entry colsep="0" rowsep="0">Omission de veiller à ce que l’usine de traitement soit dotée d’un nombre minimal d’employés tel qu’exigé</entry><entry colsep="0" rowsep="0">Type B</entry></row><row valign="top"><entry colsep="0" rowsep="0">34</entry><entry colsep="0" rowheader="yes" rowsep="0">33a)</entry><entry colsep="0" rowsep="0">Omission de veiller à ce que les travaux d’entretien ne causent pas de dommages ni ne constituent un danger tel qu’exigé</entry><entry colsep="0" rowsep="0">Type B</entry></row><row valign="top"><entry colsep="0" rowsep="0">35</entry><entry colsep="0" rowheader="yes" rowsep="0">33b)</entry><entry colsep="0" rowsep="0">Omission d’informer les personnes se trouvant sur les lieux où sont effectués les travaux d’entretien tel qu’exigé</entry><entry colsep="0" rowsep="0">Type B</entry></row><row valign="top"><entry colsep="0" rowsep="0">36</entry><entry colsep="0" rowheader="yes" rowsep="0">34</entry><entry colsep="0" rowsep="0">Utilisation d’un appareil dont l’alarme de détection du danger ou le dispositif d’arrêt est dévié ou rendu inutilisable</entry><entry colsep="0" rowsep="0">Type B</entry></row><row valign="top"><entry colsep="0" rowsep="0">37</entry><entry colsep="0" rowheader="yes" rowsep="0">35a)</entry><entry colsep="0" rowsep="0">Omission d’élaborer, de mettre en application, de réviser périodiquement et de mettre à jour un manuel des mesures d’urgence</entry><entry colsep="0" rowsep="0">Type B</entry></row><row valign="top"><entry colsep="0" rowsep="0">38</entry><entry colsep="0" rowheader="yes" rowsep="0">35b)</entry><entry colsep="0" rowsep="0">Omission de soumettre le manuel des mesures d’urgence tel qu’exigé</entry><entry colsep="0" rowsep="0">Type A</entry></row><row valign="top"><entry colsep="0" rowsep="0">39</entry><entry colsep="0" rowheader="yes" rowsep="0">35c)</entry><entry colsep="0" rowsep="0">Omission de soumettre les mises à jour tel qu’exigé</entry><entry colsep="0" rowsep="0">Type A</entry></row><row valign="top"><entry colsep="0" rowsep="0">40</entry><entry colsep="0" rowheader="yes" rowsep="0">36</entry><entry colsep="0" rowsep="0">Omission d’entrer et de demeurer en contact tel qu’exigé et omission de consulter tel qu’exigé</entry><entry colsep="0" rowsep="0">Type B</entry></row><row valign="top"><entry colsep="0" rowsep="0">41</entry><entry colsep="0" rowheader="yes" rowsep="0">37</entry><entry colsep="0" rowsep="0">Omission d’informer les personnes susceptibles d’être associées à une intervention en cas d’urgence tel qu’exigé</entry><entry colsep="0" rowsep="0">Type B</entry></row><row valign="top"><entry colsep="0" rowsep="0">42</entry><entry colsep="0" rowheader="yes" rowsep="0">38</entry><entry colsep="0" rowsep="0">Omission d’élaborer et de mettre en application un programme d’éducation permanente tel qu’exigé</entry><entry colsep="0" rowsep="0">Type B</entry></row><row valign="top"><entry colsep="0" rowsep="0">43</entry><entry colsep="0" rowheader="yes" rowsep="0">39a)</entry><entry colsep="0" rowsep="0">Omission de disposer d’installations de communication tel qu’exigé</entry><entry colsep="0" rowsep="0">Type B</entry></row><row valign="top"><entry colsep="0" rowsep="0">44</entry><entry colsep="0" rowheader="yes" rowsep="0">39b)</entry><entry colsep="0" rowsep="0">Omission de conserver les données en cas d’incident tel qu’exigé</entry><entry colsep="0" rowsep="0">Type B</entry></row><row valign="top"><entry colsep="0" rowsep="0">45</entry><entry colsep="0" rowheader="yes" rowsep="0">39c)</entry><entry colsep="0" rowsep="0">Omission de marquer clairement les vannes tel qu’exigé</entry><entry colsep="0" rowsep="0">Type B</entry></row><row valign="top"><entry colsep="0" rowsep="0">46</entry><entry colsep="0" rowheader="yes" rowsep="0">39d)</entry><entry colsep="0" rowsep="0">Omission de poser des panneaux tel qu’exigé</entry><entry colsep="0" rowsep="0">Type B</entry></row><row valign="top"><entry colsep="0" rowsep="0">47</entry><entry colsep="0" rowheader="yes" rowsep="0">39e)</entry><entry colsep="0" rowsep="0">Omission de poser des panneaux tel qu’exigé</entry><entry colsep="0" rowsep="0">Type B</entry></row><row valign="top"><entry colsep="0" rowsep="0">48</entry><entry colsep="0" rowheader="yes" rowsep="0">40a)</entry><entry colsep="0" rowsep="0">Omission de tester le fonctionnement des dispositifs de détection des dangers tel qu’exigé</entry><entry colsep="0" rowsep="0">Type B</entry></row><row valign="top"><entry colsep="0" rowsep="0">49</entry><entry colsep="0" rowheader="yes" rowsep="0">40b)</entry><entry colsep="0" rowsep="0">Omission de tenir les dossiers exigés</entry><entry colsep="0" rowsep="0">Type B</entry></row><row valign="top"><entry colsep="0" rowsep="0">50</entry><entry colsep="0" rowheader="yes" rowsep="0">41</entry><entry colsep="0" rowsep="0">Omission d’élaborer et de mettre en application un programme de contrôle de l’intégrité de l’usine de traitement tel qu’exigé</entry><entry colsep="0" rowsep="0">Type B</entry></row><row valign="top"><entry colsep="0" rowsep="0">51</entry><entry colsep="0" rowheader="yes" rowsep="0">42</entry><entry colsep="0" rowsep="0">Omission d’aviser de la désactivation d’une usine de traitement tel qu’exigé</entry><entry colsep="0" rowsep="0">Type A</entry></row><row valign="top"><entry colsep="0" rowsep="0">52</entry><entry colsep="0" rowheader="yes" rowsep="0">43.1</entry><entry colsep="0" rowsep="0">Omission d’aviser de la désaffectation d’une usine de traitement tel qu’exigé</entry><entry colsep="0" rowsep="0">Type B</entry></row><row valign="top"><entry colsep="0" rowsep="0">53</entry><entry colsep="0" rowheader="yes" rowsep="0">44</entry><entry colsep="0" rowsep="0">Omission d’élaborer et de mettre en application un programme de formation tel qu’exigé</entry><entry colsep="0" rowsep="0">Type B</entry></row><row valign="top"><entry colsep="0" rowsep="0">54</entry><entry colsep="0" rowheader="yes" rowsep="0">45</entry><entry colsep="0" rowsep="0">Omission de veiller à ce que les visiteurs connaissent le programme de sécurité tel qu’exigé</entry><entry colsep="0" rowsep="0">Type B</entry></row><row valign="top"><entry colsep="0" rowsep="0">55</entry><entry colsep="0" rowheader="yes" rowsep="0">46</entry><entry colsep="0" rowsep="0">Omission de signaler immédiatement tout incident et de présenter les rapports exigés</entry><entry colsep="0" rowsep="0">Type B</entry></row><row valign="top"><entry colsep="0" rowsep="0">56</entry><entry colsep="0" rowheader="yes" rowsep="0">47a)</entry><entry colsep="0" rowsep="0">Omission de signaler tout danger tel qu’exigé</entry><entry colsep="0" rowsep="0">Type A</entry></row><row valign="top"><entry colsep="0" rowsep="0">57</entry><entry colsep="0" rowheader="yes" rowsep="0">47b)</entry><entry colsep="0" rowsep="0">Omission de remettre un rapport tel qu’exigé</entry><entry colsep="0" rowsep="0">Type B</entry></row><row valign="top"><entry colsep="0" rowsep="0">58</entry><entry colsep="0" rowheader="yes" rowsep="0">48</entry><entry colsep="0" rowsep="0">Omission de signaler toute combustion tel qu’exigé</entry><entry colsep="0" rowsep="0">Type A</entry></row><row valign="top"><entry colsep="0" rowsep="0">59</entry><entry colsep="0" rowheader="yes" rowsep="0">49(1.1)</entry><entry colsep="0" rowsep="0">Omission d’aviser tel qu’exigé</entry><entry colsep="0" rowsep="0">Type A</entry></row><row valign="top"><entry colsep="0" rowsep="0">60</entry><entry colsep="0" rowheader="yes" rowsep="0">50</entry><entry colsep="0" rowsep="0">Omission de dresser et de tenir à jour un rapport tel qu’exigé</entry><entry colsep="0" rowsep="0">Type B</entry></row><row valign="top"><entry colsep="0" rowsep="0">61</entry><entry colsep="0" rowheader="yes" rowsep="0">51</entry><entry colsep="0" rowsep="0">Omission de dresser périodiquement un bilan tel qu’exigé</entry><entry colsep="0" rowsep="0">Type B</entry></row><row valign="top"><entry colsep="0" rowsep="0">62</entry><entry colsep="0" rowheader="yes" rowsep="0">52(1)</entry><entry colsep="0" rowsep="0">Omission de procéder à des vérifications et à des inspections tel qu’exigé</entry><entry colsep="0" rowsep="0">Type B</entry></row><row valign="top"><entry colsep="0" rowsep="0">63</entry><entry colsep="0" rowheader="yes" rowsep="0">52(2)</entry><entry colsep="0" rowsep="0">Omission de documenter la vérification tel qu’exigé</entry><entry colsep="0" rowsep="0">Type B</entry></row><row valign="top"><entry colsep="0" rowsep="0">64</entry><entry colsep="0" rowheader="yes" rowsep="0">53</entry><entry colsep="0" rowsep="0">Omission d’inspecter tel qu’exigé</entry><entry colsep="0" rowsep="0">Type B</entry></row><row valign="top"><entry colsep="0" rowsep="0">65</entry><entry colsep="0" rowheader="yes" rowsep="0">54</entry><entry colsep="0" rowsep="0">Omission de vérifier chaque année les compétences des employés tel qu’exigé</entry><entry colsep="0" rowsep="0">Type B</entry></row><row valign="top"><entry colsep="0" rowsep="0">66</entry><entry colsep="0" rowheader="yes" rowsep="0">55</entry><entry colsep="0" rowsep="0">Omission d’élaborer, de mettre en application et de tenir à jour un programme de traitement et de conservation des dossiers</entry><entry colsep="0" rowsep="0">Type A</entry></row></tbody></tgroup></table></TableGroup><TableGroup lims:inforce-start-date="2016-06-19" lims:fid="782076" lims:id="782076" pointsize="7" topmarginspacing="10"><Caption lims:inforce-start-date="2016-06-19" lims:fid="782077" lims:id="782077" position="over">PARTIE 4</Caption><table lims:inforce-start-date="2016-06-19" lims:fid="782078" lims:id="782078" frame="topbot"><title lims:inforce-start-date="2022-09-27" lims:enacted-date="2022-09-27" lims:fid="782079" lims:id="1365664">Règlement de la Régie canadienne de l’énergie sur la prévention des dommages aux pipelines (régime d’autorisation)</title><tgroup lims:inforce-start-date="2016-06-19" lims:fid="782080" lims:id="782080" align="left" cols="4"><colspec colname="col1" colwidth="106.41*" /><colspec colname="col2" colwidth="167.05*" /><colspec colname="col3" colwidth="444.61*" /><colspec colname="col4" colwidth="169.93*" /><thead lims:inforce-start-date="2016-06-19" lims:fid="782081" lims:id="782081"><row topdouble="yes" valign="top"><entry colsep="0" morerows="1" rowsep="1" valign="bottom">Article</entry><entry colsep="0" rowsep="0">Colonne 1</entry><entry colsep="0" rowsep="0">Colonne 2</entry><entry colsep="0" rowsep="0">Colonne 3</entry></row><row valign="top"><entry colsep="0" rowsep="1" valign="bottom">Disposition</entry><entry colsep="0" rowsep="1" valign="bottom">Sommaire</entry><entry colsep="0" rowsep="1" valign="bottom">Qualification</entry></row></thead><tbody lims:inforce-start-date="2016-06-19" lims:fid="782082" lims:id="782082"><row><entry colsep="0" rowsep="0">1</entry><entry colsep="0" rowheader="yes" rowsep="0">3</entry><entry colsep="0" rowsep="0">Omission de présenter une demande de localisation tel qu’exigé</entry><entry colsep="0" rowsep="0">Type B</entry></row><row><entry colsep="0" rowsep="0">2</entry><entry colsep="0" rowheader="yes" rowsep="0">4</entry><entry colsep="0" rowsep="0">Omission d’informer toutes les personnes tel qu’exigé</entry><entry colsep="0" rowsep="0">Type A</entry></row><row valign="top"><entry colsep="0" rowsep="0">3</entry><entry colsep="0" rowheader="yes" rowsep="0">7(3)</entry><entry colsep="0" rowsep="0">Omission de prendre l’une ou l’autre des mesures exigées à l’égard de la construction d’une installation</entry><entry colsep="0" rowsep="0">Type B</entry></row><row><entry colsep="0" rowsep="0">4</entry><entry colsep="0" rowheader="yes" rowsep="0">8</entry><entry colsep="0" rowsep="0">Omission de se conformer à l’une ou l’autre des obligations relatives à l’installation</entry><entry colsep="0" rowsep="0">Type B</entry></row><row><entry colsep="0" rowsep="0">5</entry><entry colsep="0" rowheader="yes" rowsep="0">9(2)</entry><entry colsep="0" rowsep="0">Omission de prendre l’une ou l’autre des mesures exigées à l’égard de la construction d’une ligne aérienne</entry><entry colsep="0" rowsep="0">Type B</entry></row><row><entry colsep="0" rowsep="0">6</entry><entry colsep="0" rowheader="yes" rowsep="0">10(3)</entry><entry colsep="0" rowsep="0">Omission de prendre l’une ou l’autre des mesures exigées lors de l’exercice de l’activité qui occasionne le remuement du sol dans la zone réglementaire</entry><entry colsep="0" rowsep="0">Type B</entry></row></tbody></tgroup></table></TableGroup><TableGroup lims:inforce-start-date="2016-06-19" lims:fid="782083" lims:id="782083" pointsize="7" topmarginspacing="10"><Caption lims:inforce-start-date="2016-06-19" lims:fid="782084" lims:id="782084" position="over">PARTIE 5</Caption><table lims:inforce-start-date="2016-06-19" lims:fid="782085" lims:id="782085" frame="topbot"><title lims:inforce-start-date="2022-09-27" lims:enacted-date="2022-09-27" lims:fid="782086" lims:id="1365665">Règlement de la Régie canadienne de l’énergie sur la prévention des dommages aux pipelines (obligations des compagnies pipelinières)</title><tgroup lims:inforce-start-date="2016-06-19" lims:fid="782087" lims:id="782087" cols="4"><colspec colname="col1" colwidth="106.20*" /><colspec colname="col2" colwidth="168.11*" /><colspec colname="col3" colwidth="444.09*" /><colspec colname="col4" colwidth="169.59*" /><thead lims:inforce-start-date="2016-06-19" lims:fid="782088" lims:id="782088"><row topdouble="yes"><entry colsep="0" morerows="1" rowsep="1" valign="bottom">Article</entry><entry colsep="0" rowsep="0" valign="top">Colonne 1</entry><entry colsep="0" rowsep="0" valign="top">Colonne 2</entry><entry colsep="0" rowsep="0" valign="top">Colonne 3</entry></row><row valign="top"><entry colsep="0" rowsep="1" valign="bottom">Disposition</entry><entry colsep="0" rowsep="1" valign="bottom">Sommaire</entry><entry colsep="0" rowsep="1" valign="bottom">Qualification</entry></row></thead><tbody lims:inforce-start-date="2016-06-19" lims:fid="782089" lims:id="782089"><row valign="top"><entry colsep="0" rowsep="0">1</entry><entry colsep="0" rowheader="yes" rowsep="0">2</entry><entry colsep="0" rowsep="0">Omission de la compagnie pipelinière d’être membre du centre d’appel unique qui existe dans la zone géographique dans laquelle son pipeline est exploité</entry><entry colsep="0" rowsep="0">Type B</entry></row><row valign="top"><entry colsep="0" rowsep="0">2</entry><entry colsep="0" rowheader="yes" rowsep="0">3(1)</entry><entry colsep="0" rowsep="0">Omission d’informer la personne qui a présenté la demande de la décision dans les dix jours ouvrables de la réception de la demande</entry><entry colsep="0" rowsep="0">Type A</entry></row><row valign="top"><entry colsep="0" rowsep="0">3</entry><entry colsep="0" rowheader="yes" rowsep="0">4</entry><entry colsep="0" rowsep="0">Omission de fournir les renseignements et toute assistance raisonnable tel qu’exigé</entry><entry colsep="0" rowsep="0">Type B</entry></row><row lims:inforce-start-date="2022-09-27" lims:enacted-date="2022-09-27" lims:fid="1365297" lims:id="1365689" valign="top"><entry colsep="0" rowsep="0">4</entry><entry colsep="0" rowheader="yes" rowsep="0">5</entry><entry colsep="0" rowsep="0">Omission de faire parvenir des commentaires à la Régie tel qu’exigé</entry><entry colsep="0" rowsep="0">Type A</entry></row><row valign="top"><entry colsep="0" rowsep="0">5</entry><entry colsep="0" rowheader="yes" rowsep="0">6(1)a)</entry><entry colsep="0" rowsep="0">Omission d’informer par écrit tel qu’exigé</entry><entry colsep="0" rowsep="0">Type B</entry></row><row valign="top"><entry colsep="0" rowsep="0">6</entry><entry colsep="0" rowheader="yes" rowsep="0">6(1)b)</entry><entry colsep="0" rowsep="0">Omission d’indiquer l’emplacement des conduites tel qu’exigé</entry><entry colsep="0" rowsep="0">Type B</entry></row><row><entry colsep="0" rowsep="0">7</entry><entry colsep="0" rowheader="yes" rowsep="0">6(1)c)</entry><entry colsep="0" rowsep="0">Omission de donner des renseignements tel qu’exigé</entry><entry colsep="0" rowsep="0">Type B</entry></row><row><entry colsep="0" rowsep="0">8</entry><entry colsep="0" rowheader="yes" rowsep="0">7</entry><entry colsep="0" rowsep="0">Omission de préciser les endroits en cause et d’aviser les personnes concernées de ces endroits tel qu’exigé</entry><entry colsep="0" rowsep="0">Type B</entry></row><row><entry colsep="0" rowsep="0">9</entry><entry colsep="0" rowheader="yes" rowsep="0">8a)</entry><entry colsep="0" rowsep="0">Omission d’effectuer les inspections nécessaires tel qu’exigé</entry><entry colsep="0" rowsep="0">Type B</entry></row><row><entry colsep="0" rowsep="0">10</entry><entry colsep="0" rowheader="yes" rowsep="0">8b)</entry><entry colsep="0" rowsep="0">Omission d’inspecter chaque conduite mise à nu avant le remblayage tel qu’exigé</entry><entry colsep="0" rowsep="0">Type B</entry></row><row><entry colsep="0" rowsep="0">11</entry><entry colsep="0" rowheader="yes" rowsep="0">9(1)</entry><entry colsep="0" rowsep="0">Omission d’aviser par écrit le propriétaire de l’installation de toute détérioration détectée tel qu’exigé</entry><entry colsep="0" rowsep="0">Type B</entry></row><row lims:inforce-start-date="2022-09-27" lims:enacted-date="2022-09-27" lims:fid="1365298" lims:id="1365690"><entry colsep="0" rowsep="0">12</entry><entry colsep="0" rowheader="yes" rowsep="0">9(2)</entry><entry colsep="0" rowsep="0">Omission d’aviser la Régie par écrit tel qu’exigé</entry><entry colsep="0" rowsep="0">Type A</entry></row><row lims:inforce-start-date="2022-09-27" lims:enacted-date="2022-09-27" lims:fid="1365299" lims:id="1365691"><entry colsep="0" rowsep="0">13</entry><entry colsep="0" rowheader="yes" rowsep="0">10(2)</entry><entry colsep="0" rowsep="0">Omission d’aviser la Régie par écrit de la suspension d’un consentement</entry><entry colsep="0" rowsep="0">Type A</entry></row><row lims:inforce-start-date="2022-09-27" lims:enacted-date="2022-09-27" lims:fid="1365300" lims:id="1365692"><entry colsep="0" rowsep="0">14</entry><entry colsep="0" rowheader="yes" rowsep="0">11</entry><entry colsep="0" rowsep="0">Omission de faire rapport à la Régie tel qu’exigé</entry><entry colsep="0" rowsep="0">Type A</entry></row><row><entry colsep="0" rowsep="0">15</entry><entry colsep="0" rowheader="yes" rowsep="0">12</entry><entry colsep="0" rowsep="0">Omission de tenir des registres tel qu’exigé</entry><entry colsep="0" rowsep="0">Type A</entry></row><row lims:inforce-start-date="2022-09-27" lims:enacted-date="2022-09-27" lims:fid="1365301" lims:id="1365693"><entry colsep="0" rowsep="0">16</entry><entry colsep="0" rowheader="yes" rowsep="0">13</entry><entry colsep="0" rowsep="0">Omission de mettre les registres et les autres documents à la disposition des agents de la Régie et des autres personnes autorisées et de leur donner l’assistance nécessaire pour l’examen de ces registres tel qu’exigé</entry><entry colsep="0" rowsep="0">Type B</entry></row><row><entry colsep="0" rowsep="0">17</entry><entry colsep="0" rowheader="yes" rowsep="0">14</entry><entry colsep="0" rowsep="0">Omission de fournir les listes tel qu’exigé</entry><entry colsep="0" rowsep="0">Type A</entry></row><row><entry colsep="0" rowsep="0">18</entry><entry colsep="0" rowheader="yes" rowsep="0">15</entry><entry colsep="0" rowsep="0">Omission d’établir et de maintenir des lignes directrices tel qu’exigé ou de les rendre publiques</entry><entry colsep="0" rowsep="0">Type B</entry></row></tbody></tgroup></table></TableGroup><TableGroup lims:inforce-start-date="2022-09-27" lims:enacted-date="2022-09-27" lims:fid="782090" lims:id="1365666" pointsize="7" topmarginspacing="10"><Caption lims:inforce-start-date="2022-09-27" lims:enacted-date="2022-09-27" lims:fid="1365667" lims:id="1365667" position="over">PARTIE 6</Caption><table lims:inforce-start-date="2022-09-27" lims:enacted-date="2022-09-27" lims:fid="1365668" lims:id="1365668" frame="topbot"><title lims:inforce-start-date="2022-09-27" lims:enacted-date="2022-09-27" lims:fid="1365669" lims:id="1365669">Règlement sur la prévention des dommages aux lignes internationales et interprovinciales de transport d’électricité (régime d’autorisation)</title><tgroup lims:inforce-start-date="2022-09-27" lims:enacted-date="2022-09-27" lims:fid="1365670" lims:id="1365670" align="left" cols="4"><colspec colname="col1" colwidth="106.41*" /><colspec colname="col2" colwidth="167.05*" /><colspec colname="col3" colwidth="444.61*" /><colspec colname="col4" colwidth="169.93*" /><thead lims:inforce-start-date="2022-09-27" lims:enacted-date="2022-09-27" lims:fid="1365671" lims:id="1365671"><row topdouble="yes" valign="top"><entry colsep="0" rowsep="0" valign="bottom" /><entry colsep="0" rowsep="0">Colonne 1</entry><entry colsep="0" rowsep="0">Colonne 2</entry><entry colsep="0" rowsep="0">Colonne 3</entry></row><row valign="top"><entry colsep="0" rowsep="1" valign="bottom">Article</entry><entry colsep="0" rowsep="1" valign="bottom">Disposition</entry><entry colsep="0" rowsep="1" valign="bottom">Sommaire</entry><entry colsep="0" rowsep="1" valign="bottom">Qualification</entry></row></thead><tbody lims:inforce-start-date="2022-09-27" lims:enacted-date="2022-09-27" lims:fid="1365672" lims:id="1365672"><row valign="top"><entry colsep="0" rowsep="0">1</entry><entry colsep="0" rowheader="yes" rowsep="0">7</entry><entry colsep="0" rowsep="0">Omission de construire une installation tel qu’exigé ou omission d’obtenir l’autorisation</entry><entry colsep="0" rowsep="0">Type B</entry></row><row><entry colsep="0" rowsep="0">2</entry><entry colsep="0" rowheader="yes" rowsep="0">8</entry><entry colsep="0" rowsep="0">Omission de mener une activité de remuement du sol tel qu’exigé ou omission d’obtenir l’autorisation</entry><entry colsep="0" rowsep="0">Type B</entry></row><row valign="top"><entry colsep="0" rowsep="0">3</entry><entry colsep="0" rowheader="yes" rowsep="0">10</entry><entry colsep="0" rowsep="0">Omission de construire une ligne de transport d’électricité tel qu’exigé</entry><entry colsep="0" rowsep="0">Type B</entry></row></tbody></tgroup></table></TableGroup><HistoricalNote><HistoricalNoteSubItem lims:inforce-start-date="2016-06-19" lims:fid="782098" lims:id="782098">DORS/2016-135, art. 1 à 3</HistoricalNoteSubItem><HistoricalNoteSubItem lims:inforce-start-date="2022-09-27" lims:enacted-date="2022-09-27" lims:fid="1365651" lims:id="1365651" lims:enactId="1365230">DORS/2022-199, art. 7</HistoricalNoteSubItem><HistoricalNoteSubItem lims:inforce-start-date="2022-09-27" lims:enacted-date="2022-09-27" lims:fid="1365652" lims:id="1365652" lims:enactId="1365232">DORS/2022-199, art. 8</HistoricalNoteSubItem><HistoricalNoteSubItem lims:inforce-start-date="2022-09-27" lims:enacted-date="2022-09-27" lims:fid="1365653" lims:id="1365653" lims:enactId="1365234">DORS/2022-199, art. 9</HistoricalNoteSubItem><HistoricalNoteSubItem lims:inforce-start-date="2022-09-27" lims:enacted-date="2022-09-27" lims:fid="1365656" lims:id="1365656" lims:enactId="1365235">DORS/2022-199, art. 10</HistoricalNoteSubItem><HistoricalNoteSubItem lims:inforce-start-date="2022-09-27" lims:enacted-date="2022-09-27" lims:fid="1365657" lims:id="1365657" lims:enactId="1365237">DORS/2022-199, art. 11</HistoricalNoteSubItem><HistoricalNoteSubItem lims:inforce-start-date="2022-09-27" lims:enacted-date="2022-09-27" lims:fid="1365658" lims:id="1365658" lims:enactId="1365239">DORS/2022-199, art. 12</HistoricalNoteSubItem><HistoricalNoteSubItem lims:inforce-start-date="2022-09-27" lims:enacted-date="2022-09-27" lims:fid="1365659" lims:id="1365659" lims:enactId="1365241">DORS/2022-199, art. 13</HistoricalNoteSubItem><HistoricalNoteSubItem lims:inforce-start-date="2022-09-27" lims:enacted-date="2022-09-27" lims:fid="1365660" lims:id="1365660" lims:enactId="1365243">DORS/2022-199, art. 14</HistoricalNoteSubItem><HistoricalNoteSubItem lims:inforce-start-date="2022-09-27" lims:enacted-date="2022-09-27" lims:fid="1365661" lims:id="1365661" lims:enactId="1365245">DORS/2022-199, art. 15</HistoricalNoteSubItem></HistoricalNote></Schedule><Schedule lims:inforce-start-date="2013-07-03" lims:lastAmendedDate="2013-07-03" lims:fid="782099" lims:id="782099"><ScheduleFormHeading lims:inforce-start-date="2013-07-03" lims:fid="782100" lims:id="782100"><Label>ANNEXE 2</Label><OriginatingRef>(paragraphe 4(1))</OriginatingRef></ScheduleFormHeading><TableGroup lims:inforce-start-date="2013-07-03" lims:fid="782101" lims:id="782101" pointsize="7" topmarginspacing="10"><table lims:inforce-start-date="2013-07-03" lims:fid="782102" lims:id="782102" frame="topbot"><title lims:inforce-start-date="2013-07-03" lims:fid="782103" lims:id="782103">Barème des sanctions</title><tgroup lims:inforce-start-date="2013-07-03" lims:fid="782104" lims:id="782104" cols="6"><colspec colname="1" colwidth="18.66*" /><colspec align="left" colname="2" colwidth="36.19*" /><colspec align="left" colname="3" colwidth="26.57*" /><colspec align="left" colname="COLSPEC0" colwidth="26.48*" /><colspec align="left" colname="4" colwidth="26.66*" /><colspec align="left" colname="COLSPEC1" colwidth="24.67*" /><thead lims:inforce-start-date="2013-07-03" lims:fid="782105" lims:id="782105"><row rowsep="0" topdouble="yes"><entry colname="1" colsep="0" morerows="2" rowsep="1" valign="bottom">Article</entry><entry colname="2" colsep="0" valign="top">Colonne 1</entry><entry colsep="0" nameend="COLSPEC0" namest="3" valign="top">Colonne 2</entry><entry colsep="0" nameend="COLSPEC1" namest="4" valign="top">Colonne 3</entry></row><row><entry colsep="0" morerows="1" rowsep="1" valign="bottom">Cote de gravité</entry><entry colsep="0" nameend="COLSPEC0" namest="3" rowsep="0" valign="top">Violation de type A</entry><entry colsep="0" nameend="COLSPEC1" namest="4" rowsep="0" valign="top">Violation de type B</entry></row><row rowsep="1" valign="bottom"><entry colname="3" colsep="0" rowsep="1" valign="bottom">Personne physique</entry><entry colsep="0" rowsep="1" valign="bottom">Autre personne</entry><entry colname="4" colsep="0" rowsep="1" valign="bottom">Personne physique</entry><entry colsep="0" rowsep="1" valign="bottom">Autre personne</entry></row></thead><tbody lims:inforce-start-date="2013-07-03" lims:fid="782106" lims:id="782106"><row rowsep="0"><entry colname="1" colsep="0" rowsep="0" valign="top">1</entry><entry colname="2" colsep="0" rowheader="yes" rowsep="0">–3 et moins</entry><entry colname="3" colsep="0" rowsep="0">250 $</entry><entry colsep="0" rowsep="0">1 000 $</entry><entry colname="4" colsep="0" rowsep="0">1 000 $</entry><entry colsep="0" rowsep="0">4 000 $</entry></row><row rowsep="0"><entry colname="1" colsep="0" rowsep="0" valign="top">2</entry><entry colname="2" colsep="0" rowheader="yes" rowsep="0">–2</entry><entry colname="3" colsep="0" rowsep="0">595 $</entry><entry colsep="0" rowsep="0">2 375 $</entry><entry colname="4" colsep="0" rowsep="0">4 000 $</entry><entry colsep="0" rowsep="0">16 000 $</entry></row><row rowsep="0"><entry colname="1" colsep="0" rowsep="0" valign="top">3</entry><entry colname="2" colsep="0" rowheader="yes" rowsep="0">–1</entry><entry colname="3" colsep="0" rowsep="0">990 $</entry><entry colsep="0" rowsep="0">3 750 $</entry><entry colname="4" colsep="0" rowsep="0">7 000 $</entry><entry colsep="0" rowsep="0">28 000 $</entry></row><row rowsep="0"><entry colname="1" colsep="0" rowsep="0" valign="top">4</entry><entry colname="2" colsep="0" rowheader="yes" rowsep="0">0</entry><entry colname="3" colsep="0" rowsep="0">1 365 $</entry><entry colsep="0" rowsep="0">5 025 $</entry><entry colname="4" colsep="0" rowsep="0">10 000 $</entry><entry colsep="0" rowsep="0">40 000 $</entry></row><row rowsep="0"><entry colname="1" colsep="0" rowsep="0" valign="top">5</entry><entry colname="2" colsep="0" rowheader="yes" rowsep="0">1</entry><entry colname="3" colsep="0" rowsep="0">1 740 $</entry><entry colsep="0" rowsep="0">6 300 $</entry><entry colname="4" colsep="0" rowsep="0">13 000 $</entry><entry colsep="0" rowsep="0">52 000 $</entry></row><row rowsep="0"><entry colname="1" colsep="0" rowsep="0" valign="top">6</entry><entry colname="2" colsep="0" rowheader="yes" rowsep="0">2</entry><entry colname="3" colsep="0" rowsep="0">2 115 $</entry><entry colsep="0" rowsep="0">7 575 $</entry><entry colname="4" colsep="0" rowsep="0">16 000 $</entry><entry colsep="0" rowsep="0">64 000 $</entry></row><row rowsep="0"><entry colname="1" colsep="0" rowsep="0" valign="top">7</entry><entry colname="2" colsep="0" rowheader="yes" rowsep="0">3</entry><entry colname="3" colsep="0" rowsep="0">2 490 $</entry><entry colsep="0" rowsep="0">8 850 $</entry><entry colname="4" colsep="0" rowsep="0">19 000 $</entry><entry colsep="0" rowsep="0">76 000 $</entry></row><row rowsep="0"><entry colname="1" colsep="0" rowsep="0" valign="top">8</entry><entry colname="2" colsep="0" rowheader="yes" rowsep="0">4</entry><entry colname="3" colsep="0" rowsep="0">2 865 $</entry><entry colsep="0" rowsep="0">10 125 $</entry><entry colname="4" colsep="0" rowsep="0">22 000 $</entry><entry colsep="0" rowsep="0">88 000 $</entry></row><row rowsep="0"><entry colname="1" colsep="0" rowsep="0" valign="top">9</entry><entry colname="2" colsep="0" rowheader="yes" rowsep="1">5 et plus</entry><entry colname="3" colsep="0" rowsep="1">3 000 $</entry><entry colsep="0" rowsep="1">12 000 $</entry><entry colname="4" colsep="0" rowsep="1">25 000 $</entry><entry colsep="0" rowsep="1">100 000 $</entry></row></tbody></tgroup></table></TableGroup></Schedule><Schedule id="RelatedProvs"><ScheduleFormHeading type="amending"><TitleText>DISPOSITIONS CONNEXES</TitleText></ScheduleFormHeading><RegulationPiece><RelatedOrNotInForce><Heading level="5" style="nifrp"><TitleText>
                    — DORS/2016-135, art. 4</TitleText></Heading><Section><Label>4</Label><Text>Pour l’application de l’alinéa 11(2)a) de la <XRefExternal reference-type="act" link="S-22">Loi sur les textes réglementaires</XRefExternal>, le présent règlement prend effet avant sa publication dans la <XRefExternal reference-type="other" link="gazette">Gazette du Canada</XRefExternal>.</Text></Section></RelatedOrNotInForce></RegulationPiece></Schedule><RecentAmendments><Amendment><AmendmentCitation>DORS/2022-199</AmendmentCitation><AmendmentDate>2022-09-27</AmendmentDate></Amendment></RecentAmendments></Regulation>