Government of Canada / Gouvernement du Canada
Symbol of the Government of Canada

Search

Canada–Nova Scotia Offshore Area Petroleum Operations Framework Regulations (SOR/2024-26)

Regulations are current to 2024-06-19

The following provision is not in force.

Marginal note:Allocation over multiple pools or zones

  • The following provision is not in force.

     (1) If a well is completed over multiple pools or zones, the operator must ensure that the production of oil, gas and water from the well and the volume of fluids injected into the well are allocated on a pro rata basis to the pools or zones using the flow allocation procedure approved under subsection 14(2).

  • The following provision is not in force.

    Marginal note:Proration tests

    (2) The operator must ensure that sufficient proration tests are conducted to measure the rates at which fluids are produced from the well to ensure that the allocation of oil, gas and water production to the pools and zones as a result of the flow allocation procedure is accurate.


Date modified: