Secondary Lead Smelter Release Regulations (SOR/91-155)
Full Document:
- HTMLFull Document: Secondary Lead Smelter Release Regulations (Accessibility Buttons available) |
- XMLFull Document: Secondary Lead Smelter Release Regulations [34 KB] |
- PDFFull Document: Secondary Lead Smelter Release Regulations [147 KB]
Regulations are current to 2026-09-30
10 The release measurements referred to in section 9 shall consist of at least three valid test runs and the release measurement result shall be the arithmetic average of the results of these valid test runs.
Page Details
- Date modified: