  1. Physical Activities Regulations - SOR/2019-285 (SCHEDULE : Physical Activities)
    Physical Activities Regulations

    [...]

    [...]

    19 The expansion of an existing mine, mill, quarry or sand or gravel pit in one of the following circumstances:

    • (a) in the case of an existing coal mine, if the expansion would result in an increase in the area of mining operations of 50% or more and the total coal production capacity would be 5 000 t/day or more after the expansion;

    • (b) in the case of an existing diamond mine if the expansion would result in an increase in the area of mining operations of 50% or more and the total ore production capacity would be 5 000 t/day or more after the expansion;

    • (c) in the case of an existing metal mine, other than a rare earth element mine, placer mine or uranium mine, if the expansion would result in an increase in the area of mining operations of 50% or more and the total ore production capacity would be 5 000 t/day or more after the expansion;

    • (d) in the case of an existing metal mill, other than a uranium mill, if the expansion would result in an increase in the area of mining operations of 50% or more and the total ore input capacity would be 5 000 t/day or more after the expansion;

    • (e) in the case of an existing rare earth element mine if the expansion would result in an increase in the area of mining operations of 50% or more and the total ore production capacity would be 2 500 t/day or more after the expansion;

    • (f) in the case of an existing stone quarry or sand or gravel pit if the expansion would result in an increase in the area of mining operations of 50% or more and the total production capacity would be 3 500 000 t/year or more after the expansion.

    [...]

    21 The expansion of an existing uranium mine, if the expansion would result in an increase in the area of mining operations of 50% or more and the total ore production capacity would be 2500 t/day or more after the expansion.

    [...]

    23 The expansion of an existing uranium mill, if the expansion would result in an increase in the area of mining operations of 50% or more and the total ore input capacity would be 2 500 t/day or more after the expansion.

    [...]

    25 The expansion of an existing oil sands mine, if the expansion would result in an increase in the area of mining operations of 50% or more and the total bitumen production capacity would be 10 000 m3/day or more after the expansion.

    [...]


  2. Physical Activities Regulations - SOR/2019-285 (Section 1)
    Physical Activities Regulations
    Marginal note:Definitions
    •  (1) The following definitions apply in these Regulations.

      area of mining operations

      area of mining operations  means the area at ground level occupied by any open-pit or underground workings, mill complex or storage area for overburden, waste rock, tailings or ore. (aire d’exploitation minière)

    [...]


  3. Physical Activities Regulations - SOR/2019-285 (Section 1)
    Physical Activities Regulations

    [...]

    Marginal note:Definitions
    • [...]

       (1) The following definitions apply in these Regulations.

      area of mining operations

      area of mining operations  means the area at ground level occupied by any open-pit or underground workings, mill complex or storage area for overburden, waste rock, tailings or ore. (aire d’exploitation minière)