Advanced Search

Search Form
Keyword(s):
Filter(s):
 
Display / Hide Categories
Results 1-5 of 16
Didn't find what you're looking for?
Search Canada.ca

  1. Newfoundland Offshore Petroleum Drilling and Production Regulations - SOR/2009-316 (Section 106)
    Newfoundland Offshore Petroleum Drilling and Production Regulations

     These Regulations come into force on December 31, 2009.


  2. Newfoundland Offshore Petroleum Drilling and Production Regulations - SOR/2009-316 (Section 1)
    Newfoundland Offshore Petroleum Drilling and Production Regulations
    •  (1) The following definitions apply in these Regulations.

    • (2) In these Regulations, delineation well , development well and exploratory well have the same meaning as in subsection 119(1) of the Act.

    • (3) In these Regulations, drilling installation , drilling rig , drilling unit , drill site , installation , production installation , production operation , production site and subsea production system have the same meaning as in subsection 2(1) of the Newfoundland Offshore Petroleum Installations Regulations.

    [...]


  3. Newfoundland Offshore Petroleum Drilling and Production Regulations - SOR/2009-316 (Section 59)
    Newfoundland Offshore Petroleum Drilling and Production Regulations

     No operator shall remove or cause to have removed a drilling installation from a well drilled under these Regulations unless the well has been terminated in accordance with these Regulations.


  4. Newfoundland Offshore Petroleum Drilling and Production Regulations - SOR/2009-316 (Section 103)
    Newfoundland Offshore Petroleum Drilling and Production Regulations

     An operator at the time of the coming into force of these Regulations shall comply with the requirements of section 5.


  5. Newfoundland Offshore Petroleum Drilling and Production Regulations - SOR/2009-316 (Section 77)
    Newfoundland Offshore Petroleum Drilling and Production Regulations
    • [...]

    • (2) Unless otherwise indicated in these Regulations, the operator shall ensure that the results, data, analyses and schematics are submitted within 60 days after the day on which any activity referred to in paragraphs (1)(a) and (b) is completed.



Date modified: