  1. Nova Scotia Offshore Petroleum Drilling and Production Regulations - SOR/2009-317 (Section 106)
    Nova Scotia Offshore Petroleum Drilling and Production Regulations

     These Regulations come into force on December 31, 2009.


  2. Nova Scotia Offshore Petroleum Drilling and Production Regulations - SOR/2009-317 (Section 1)
    Nova Scotia Offshore Petroleum Drilling and Production Regulations
    •  (1) The following definitions apply in these Regulations.

    • (2) In these Regulations, delineation well , development well and exploratory well have the same meaning as in subsection 122(1) of the Act.

    • (3) In these Regulations, drilling installation , drilling rig , drilling unit , drill site , installation , production installation , production operation , production site and subsea production system have the same meaning as in subsection 2(1) of the Nova Scotia Offshore Petroleum Installations Regulations.


  3. Nova Scotia Offshore Petroleum Drilling and Production Regulations - SOR/2009-317 (Section 59)
    Nova Scotia Offshore Petroleum Drilling and Production Regulations

     No operator shall remove or cause to have removed a drilling installation from a well drilled under these Regulations unless the well has been terminated in accordance with these Regulations.


  4. Nova Scotia Offshore Petroleum Drilling and Production Regulations - SOR/2009-317 (Section 103)
    Nova Scotia Offshore Petroleum Drilling and Production Regulations

     An operator at the time of the coming into force of these Regulations shall comply with the requirements of section 5.


  5. Nova Scotia Offshore Petroleum Drilling and Production Regulations - SOR/2009-317 (Section 77)
    Nova Scotia Offshore Petroleum Drilling and Production Regulations
    • [...]

    • (2) Unless otherwise indicated in these Regulations, the operator shall ensure that the results, data, analyses and schematics are submitted within 60 days after the day on which any activity referred to in paragraphs (1)(a) and (b) is completed.