Advanced Search

Search Form
Keyword(s):
Filter(s):
 
Display / Hide Categories
3 results
Didn't find what you're looking for?
Search Canada.ca

  1. Power Line Crossing Regulations - SOR/95-500 (Section 1)
    Regulations Respecting Crossings of International Power Lines or Interprovincial Power Lines Constructed Without Leave of the National Energy Board

     These Regulations may be cited as the Power Line Crossing Regulations.


  2. Power Line Crossing Regulations - SOR/95-500 (Section 3)
    Regulations Respecting Crossings of International Power Lines or Interprovincial Power Lines Constructed Without Leave of the National Energy Board

     Leave of the Board to construct a facility across, on, along or under a power line or to excavate using power-operated equipment within 30 m of a power line, pursuant to subsection 58.31(1) or subsection 112(1) of the Act, is not necessary where

    • (a) these activities are designed and executed in accordance with CAN/CSA-C22.3 No. 1-M87, Overhead Systems, as amended from time to time, in respect of overhead crossings;

    • (b) these activities are designed and executed in accordance with CAN3-C22.3 No. 7-M86, Underground Systems, as amended from time to time, in respect of underground crossings;


  3. Power Line Crossing Regulations - SOR/95-500 (Section 2)
    Regulations Respecting Crossings of International Power Lines or Interprovincial Power Lines Constructed Without Leave of the National Energy Board

     In these Regulations,

    [...]



Date modified: