1 If a front end engineering design study referred to in paragraph 10(a) of these Regulations has been carried out, the following information to summarize that study:
-
[...]
-
(k) an estimate of the performance of the unit when it is operating with an integrated carbon capture and storage system, supported by process flow diagrams and mass and energy balances, including an estimate of
2 If any major equipment that is necessary for the capture element referred to in paragraph 10(b) of these Regulations has been purchased, a copy of the purchase orders and receipts respecting the purchase of that equipment.
3 A declaration, signed by all contracting parties to any contract referred to in paragraph 10(c) of these Regulations, that indicates that the contract has been entered into and the date on which it was entered into.
[...]