Advanced Search

Search Form
 
Display / Hide Categories
Results 1-5 of 8
Didn't find what you're looking for?
Search Canada.ca

  1. National Parks of Canada Fishing Regulations - C.R.C., c. 1120 (SCHEDULE II)

    [...]

    Open Seasons

    Column I Column II Column III
    Park Waters Species of Fish Open Season
    35 All waters except as specified in Schedule IV All All seasons
    36 All waters All All seasons
    37 All waters All All seasons
    45 All waters All All seasons

    [...]


  2. Regulations Designating Physical Activities - SOR/2012-147 (SCHEDULE : Physical Activities)

    [...]

    [...]

    25 The construction, operation, decommissioning and abandonment of a new

    • [...]

    • (c) all-season public highway that requires a total of 50 km or more of new right of way; or

    26 The construction, operation, decommissioning and abandonment of a new

    • [...]

    • (c) all-season runway with a length of 1 500 m or more.

    27 The extension of an existing all-season runway by 1 500 m or more.

    [...]


  3. Physical Activities Regulations - SOR/2019-285 (Section 1)
    Marginal note:Definitions
    •  (1) The following definitions apply in these Regulations.

      new right of way

      new right of way  means land that is to be developed for an international electrical transmission line, a pipeline, as defined in section 2 of the Canadian Energy Regulator Act, a railway line or an all-season public highway, and that is not alongside and contiguous to an area of land that was developed for an electrical transmission line, oil and gas pipeline, railway line or all-season public highway. (nouvelle emprise)

    [...]


  4. First Nations Oil And Gas Environmental Assessment Regulations - SOR/2007-272 (SCHEDULE : Projects Subject to Comprehensive Study Process)

    [...]

    [...]

    3 Construction of an electrical transmission line with a voltage of 345 kV or more that is 75 km or more in length on land that has not already been developed for a power line, pipeline, railway line or all-season public highway and that is not contiguous, for its whole length, to any other linear physical work.

    4 Construction of an oil and gas pipeline that is more than 75 km in length on land that has not already been developed for a power line, pipeline, railway line or all-season public highway and that is not contiguous, for its whole length, to any other linear physical work.

    [...]


  5. Assessable Activities, Exceptions and Executive Committee Projects Regulations - SOR/2005-379 (SCHEDULE 3 : Projects to Be Submitted to the Executive Committee)

    [...]

    [...]

    33 Construction of an all-season public road more than 50 km in length if the road

    • [...]

    • (b) will lead to a community that lacks all-season public road access.

    [...]



Date modified: