6 (1) An Official sample taken under section 30 of the Act shall be taken in accordance with the Commission’s Sampling Systems Handbook and approval Guide, as amended from time to time.
(2) No official samples shall be taken by means of a mechanical sampler unless it is installed, tested and maintained by the licensee under the direction of an inspector.
(3) An official sample shall be retained for the period beginning on the date of the grading of the sample and ending
(a) not less than six months after that date of inspection, if the sample is taken on the discharge of grain out of an elevator into a ship; and
(b) [Repealed, SOR/2003-284, s. 5]
(c) not less than 20 days after that date of inspection, in any other case.
- SOR/86-813, s. 1
- SOR/89-395, s. 2(F)
- SOR/96-508, s. 5
- SOR/2000-213, s. 2
- SOR/2001-273, s. 5
- SOR/2003-284, s. 5
- SOR/2004-198, s. 3
- SOR/2005-361, s. 1