Language selection

Government of Canada

Search

 Foothills shall, in respect of the construction of the pipeline,

  • (a) clear vegetation from only those areas essential for the construction;

  • (b) cut, stack and dispose of any merchantable timber cleared by Foothills in such manner as is satisfactory to the designated officer;

  • (c) leave a buffer strip of undisturbed vegetation satisfactory to the designated officer

    • (i) between any area cleared by Foothills of vegetation and an adjacent waterbody, and

    • (ii) between any area cleared of vegetation and an adjacent road;

  • (d) promptly remove any debris entering or likely to enter any waterbody as a result of the clearing of vegetation by Foothills; and

  • (e) take such measures as are satisfactory to the designated officer to minimize windthrow in buffer strips.

Page Details

Date modified: