Metal and Diamond Mining Effluent Regulations
Version of section 25 from 2006-03-22 to 2006-10-02:
25 (1) Any time period specified for collecting samples of effluent referred to in this Division may be extended if
(a) unforeseen circumstances cause safety concerns or access problems and render the collection of samples of effluent impracticable; and
(b) the owner or operator notifies an inspector of the circumstances.
(2) The owner or operator shall collect the samples of effluent without delay when the circumstances permit.
- Date modified: