Canada Oil and Gas Drilling and Production Regulations (SOR/2009-315)
Full Document:
- HTMLFull Document: Canada Oil and Gas Drilling and Production Regulations (Accessibility Buttons available) |
- XMLFull Document: Canada Oil and Gas Drilling and Production Regulations [137 KB] |
- PDFFull Document: Canada Oil and Gas Drilling and Production Regulations [404 KB]
Regulations are current to 2026-03-17 and last amended on 2009-12-31. Previous Versions
10 (1) Subject to subsection (2), an operator who intends to drill, re-enter, work over, complete or recomplete a well or suspend or abandon a well or part of a well shall obtain a well approval.
(2) A well approval is not necessary to conduct a wire line, slick line or coiled tubing operation through a Christmas tree located above sea level if
(a) the work does not alter the completion interval or is not expected to adversely affect recovery; and
(b) the equipment, operating procedures and qualified persons exist to conduct the wire line, slick line or coiled tubing operations as set out in the authorization.
Page Details
- Date modified: