Gas Pipeline Uniform Accounting Regulations
42 (1) Where a plant unit of line pipe is replaced with other pipe in the same location, a company shall debit to the appropriate plant account the cost of opening and back filling the trench together with the cost of hauling, laying and connecting the pipe, the cost of removing retired pipe from the trench and other costs of pipeline construction.
(2) The cost of reconditioning line pipe not removed shall be accounted for as repairs and not as retirements or replacements.
(3) Where the plant unit of line pipe referred to in subsection (1) is not replaced by new pipe in the same location, the cost of opening and back filling the trench from which the pipe is removed together with the cost of removing the pipe shall be accounted for as cost of salvage.
- SOR/2020-50, s. 13(F)