National Energy Board Cost Recovery Regulations (SOR/91-7)
Full Document:
- HTMLFull Document: National Energy Board Cost Recovery Regulations (Accessibility Buttons available) |
- XMLFull Document: National Energy Board Cost Recovery Regulations [79 KB] |
- PDFFull Document: National Energy Board Cost Recovery Regulations [321 KB]
Regulations are current to 2024-06-19 and last amended on 2011-01-01. Previous Versions
4 (1) Each large oil pipeline company shall, every year, pay to the Board a cost recovery charge calculated in the manner set out in subsection 14(1).
(2) Each large gas pipeline company shall, every year, pay to the Board a cost recovery charge calculated in the manner set out in subsection 14(2).
(3) Each large power line company shall, every year, pay to the Board a cost recovery charge calculated in the manner set out in subsection 14(3).
(4) Each large commodity pipeline company shall, every year, pay to the Board an administration levy of $50,000.
(5) However, a company is not required to pay, for a year or any portion of a year, a cost recovery charge or administration levy payable under this section if the company pays a levy under section 5.2 or 5.3 in that year.
- SOR/98-267, s. 3
- SOR/2001-89, s. 3
- SOR/2009-307, s. 4
- Date modified: