Government of Canada / Gouvernement du Canada
Symbol of the Government of Canada

Search

Version of document from 2009-12-31 to 2024-11-26:

Nova Scotia Offshore Area Petroleum Production and Conservation Regulations

SOR/95-190

[Repealed, SOR/2009-317, s. 105] - 2009-12-31

CANADA-NOVA SCOTIA OFFSHORE PETROLEUM RESOURCES ACCORD IMPLEMENTATION ACT

Registration 1995-04-11

Regulations Respecting Safety, Conservation Practices and the Protection of the Environment in Operations Undertaken for the Production of Petroleum in the Nova Scotia Offshore Area

P.C. 1995-605  1995-04-04

[Repealed, SOR/2009-317, s. 105]

Short Title

[Repealed, SOR/2009-317, s. 105]

 [Repealed, SOR/2009-317, s. 105]

Interpretation

[Repealed, SOR/2009-317, s. 105]

 [Repealed, SOR/2009-317, s. 105]

Application

[Repealed, SOR/2009-317, s. 105]

 [Repealed, SOR/2009-317, s. 105]

Submission of Information

[Repealed, SOR/2009-317, s. 105]

 [Repealed, SOR/2009-317, s. 105]

PART IApprovals and Authorizations

[Repealed, SOR/2009-317, s. 105]

General

[Repealed, SOR/2009-317, s. 105]

 [Repealed, SOR/2009-317, s. 105]

 [Repealed, SOR/2009-317, s. 105]

 [Repealed, SOR/2009-317, s. 105]

Production Operations Authorization

[Repealed, SOR/2009-317, s. 105]

 [Repealed, SOR/2009-317, s. 105]

Approvals

[Repealed, SOR/2009-317, s. 105]

 [Repealed, SOR/2009-317, s. 105]

Evidence of Financial Responsibility

[Repealed, SOR/2009-317, s. 105]

 [Repealed, SOR/2009-317, s. 105]

PART IIWell, Pool and Field Evaluations

[Repealed, SOR/2009-317, s. 105]

Cores

[Repealed, SOR/2009-317, s. 105]

 [Repealed, SOR/2009-317, s. 105]

Production Testing

[Repealed, SOR/2009-317, s. 105]

 [Repealed, SOR/2009-317, s. 105]

Pool Pressure Measurements and Surveys

[Repealed, SOR/2009-317, s. 105]

 [Repealed, SOR/2009-317, s. 105]

Cased Hole Logs

[Repealed, SOR/2009-317, s. 105]

 [Repealed, SOR/2009-317, s. 105]

Fluid Sampling and Analysis

[Repealed, SOR/2009-317, s. 105]

 [Repealed, SOR/2009-317, s. 105]

PART IIIOperation of Wells

[Repealed, SOR/2009-317, s. 105]

General

[Repealed, SOR/2009-317, s. 105]

 [Repealed, SOR/2009-317, s. 105]

Well Operation Program Authorization

[Repealed, SOR/2009-317, s. 105]

 [Repealed, SOR/2009-317, s. 105]

Approval for a Well Operation

[Repealed, SOR/2009-317, s. 105]

 [Repealed, SOR/2009-317, s. 105]

Precautions

[Repealed, SOR/2009-317, s. 105]

 [Repealed, SOR/2009-317, s. 105]

Well Operation Report

[Repealed, SOR/2009-317, s. 105]

 [Repealed, SOR/2009-317, s. 105]

Abandonment or Suspension of a Zone or Well

[Repealed, SOR/2009-317, s. 105]

 [Repealed, SOR/2009-317, s. 105]

Production Casing and Tubing

[Repealed, SOR/2009-317, s. 105]

 [Repealed, SOR/2009-317, s. 105]

Fluids for Well Operations

[Repealed, SOR/2009-317, s. 105]

 [Repealed, SOR/2009-317, s. 105]

Annulus Between Well Tubulars

[Repealed, SOR/2009-317, s. 105]

 [Repealed, SOR/2009-317, s. 105]

Surface Controlled Subsurface Safety Valves

[Repealed, SOR/2009-317, s. 105]

 [Repealed, SOR/2009-317, s. 105]

Wellhead and Christmas Tree Equipment

[Repealed, SOR/2009-317, s. 105]

 [Repealed, SOR/2009-317, s. 105]

Emergency Shutdown Valves

[Repealed, SOR/2009-317, s. 105]

 [Repealed, SOR/2009-317, s. 105]

Simultaneous Drilling and Production Operations

[Repealed, SOR/2009-317, s. 105]

 [Repealed, SOR/2009-317, s. 105]

PART IVConservation Requirements

[Repealed, SOR/2009-317, s. 105]

Reservoir Management

[Repealed, SOR/2009-317, s. 105]

 [Repealed, SOR/2009-317, s. 105]

Voidage Replacement

[Repealed, SOR/2009-317, s. 105]

 [Repealed, SOR/2009-317, s. 105]

Commingled Production

[Repealed, SOR/2009-317, s. 105]

 [Repealed, SOR/2009-317, s. 105]

Flaring and Venting of Gas

[Repealed, SOR/2009-317, s. 105]

 [Repealed, SOR/2009-317, s. 105]

Disposal of Oil

[Repealed, SOR/2009-317, s. 105]

 [Repealed, SOR/2009-317, s. 105]

PART VProduction Rates

[Repealed, SOR/2009-317, s. 105]

General

[Repealed, SOR/2009-317, s. 105]

 [Repealed, SOR/2009-317, s. 105]

PART VIMeasurements and Testing

[Repealed, SOR/2009-317, s. 105]

General

[Repealed, SOR/2009-317, s. 105]

 [Repealed, SOR/2009-317, s. 105]

Prorated Production

[Repealed, SOR/2009-317, s. 105]

 [Repealed, SOR/2009-317, s. 105]

Transfer Meters

[Repealed, SOR/2009-317, s. 105]

 [Repealed, SOR/2009-317, s. 105]

Group Production Meters and Test Production Meter Calibration

[Repealed, SOR/2009-317, s. 105]

 [Repealed, SOR/2009-317, s. 105]

Water Meter Calibration

[Repealed, SOR/2009-317, s. 105]

 [Repealed, SOR/2009-317, s. 105]

Gas Meter Calibration

[Repealed, SOR/2009-317, s. 105]

 [Repealed, SOR/2009-317, s. 105]

Condensate Measurement

[Repealed, SOR/2009-317, s. 105]

 [Repealed, SOR/2009-317, s. 105]

Metering Records

[Repealed, SOR/2009-317, s. 105]

 [Repealed, SOR/2009-317, s. 105]

Testing Frequency

[Repealed, SOR/2009-317, s. 105]

 [Repealed, SOR/2009-317, s. 105]

Accuracy of Measurement

[Repealed, SOR/2009-317, s. 105]

 [Repealed, SOR/2009-317, s. 105]

PART VIIEnvironmental Requirements

[Repealed, SOR/2009-317, s. 105]

Physical Environmental Monitoring Equipment

[Repealed, SOR/2009-317, s. 105]

 [Repealed, SOR/2009-317, s. 105]

Physical Environmental Observation and Reporting

[Repealed, SOR/2009-317, s. 105]

 [Repealed, SOR/2009-317, s. 105]

Construction Disturbances

[Repealed, SOR/2009-317, s. 105]

 [Repealed, SOR/2009-317, s. 105]

Hazards

[Repealed, SOR/2009-317, s. 105]

 [Repealed, SOR/2009-317, s. 105]

Handling of Waste Material and Produced Water

[Repealed, SOR/2009-317, s. 105]

 [Repealed, SOR/2009-317, s. 105]

De-commissioning

[Repealed, SOR/2009-317, s. 105]

 [Repealed, SOR/2009-317, s. 105]

PART VIIIOperations

[Repealed, SOR/2009-317, s. 105]

Safety Plan and Environmental Protection Plan

[Repealed, SOR/2009-317, s. 105]

 [Repealed, SOR/2009-317, s. 105]

Equipment Requirements

[Repealed, SOR/2009-317, s. 105]

 [Repealed, SOR/2009-317, s. 105]

Testing Requirements for Valves and Sensors

[Repealed, SOR/2009-317, s. 105]

 [Repealed, SOR/2009-317, s. 105]

Maintenance and Replacement of Equipment

[Repealed, SOR/2009-317, s. 105]

 [Repealed, SOR/2009-317, s. 105]

Support Craft

[Repealed, SOR/2009-317, s. 105]

 [Repealed, SOR/2009-317, s. 105]

Standby Vessel

[Repealed, SOR/2009-317, s. 105]

 [Repealed, SOR/2009-317, s. 105]

Support Craft Monitoring

[Repealed, SOR/2009-317, s. 105]

 [Repealed, SOR/2009-317, s. 105]

Communications

[Repealed, SOR/2009-317, s. 105]

 [Repealed, SOR/2009-317, s. 105]

Availability of Regulations

[Repealed, SOR/2009-317, s. 105]

 [Repealed, SOR/2009-317, s. 105]

Suspension of Operations

[Repealed, SOR/2009-317, s. 105]

 [Repealed, SOR/2009-317, s. 105]

Subsea Location

[Repealed, SOR/2009-317, s. 105]

 [Repealed, SOR/2009-317, s. 105]

PART IXSafety and Training of Personnel

[Repealed, SOR/2009-317, s. 105]

General

[Repealed, SOR/2009-317, s. 105]

 [Repealed, SOR/2009-317, s. 105]

Qualifications

[Repealed, SOR/2009-317, s. 105]

 [Repealed, SOR/2009-317, s. 105]

Oil Spill Drills

[Repealed, SOR/2009-317, s. 105]

 [Repealed, SOR/2009-317, s. 105]

PART XAuthorized Entry, Inspection and Investigations

[Repealed, SOR/2009-317, s. 105]

Safety Zones

[Repealed, SOR/2009-317, s. 105]

 [Repealed, SOR/2009-317, s. 105]

Conservation Officer and Safety Officer

[Repealed, SOR/2009-317, s. 105]

 [Repealed, SOR/2009-317, s. 105]

Investigation of Accidents

[Repealed, SOR/2009-317, s. 105]

 [Repealed, SOR/2009-317, s. 105]

PART XIRecords and Reporting

[Repealed, SOR/2009-317, s. 105]

System of Units

[Repealed, SOR/2009-317, s. 105]

 [Repealed, SOR/2009-317, s. 105]

Names and Designations

[Repealed, SOR/2009-317, s. 105]

 [Repealed, SOR/2009-317, s. 105]

Change of Operator

[Repealed, SOR/2009-317, s. 105]

 [Repealed, SOR/2009-317, s. 105]

Construction Progress

[Repealed, SOR/2009-317, s. 105]

 [Repealed, SOR/2009-317, s. 105]

Daily Operating Record

[Repealed, SOR/2009-317, s. 105]

 [Repealed, SOR/2009-317, s. 105]

Daily Production Record

[Repealed, SOR/2009-317, s. 105]

 [Repealed, SOR/2009-317, s. 105]

Monthly Production Report

[Repealed, SOR/2009-317, s. 105]

 [Repealed, SOR/2009-317, s. 105]

Submission of Data

[Repealed, SOR/2009-317, s. 105]

 [Repealed, SOR/2009-317, s. 105]

Pilot Scheme

[Repealed, SOR/2009-317, s. 105]

 [Repealed, SOR/2009-317, s. 105]

Annual Production Report and Annual Environmental Report

[Repealed, SOR/2009-317, s. 105]

 [Repealed, SOR/2009-317, s. 105]

[Repealed, SOR/2009-317, s. 105]


Date modified: