Government of Canada / Gouvernement du Canada
Symbol of the Government of Canada

Search

Canadian Aviation Regulations

Version of section 604.57 from 2019-05-15 to 2024-10-30:


 No person shall file a flight plan indicating that an aircraft operated by a private operator can be operated in accordance with required navigation performance 10 (RNP 10) requirements unless

  • (a) the private operator is authorized under a special authorization to operate the aircraft in accordance with RNP 10 requirements;

  • (b) every flight crew member has received RNP 10 training, for which the validity period has not expired, in

    • (i) flight planning requirements,

    • (ii) navigation performance requirements,

    • (iii) enroute procedures, and

    • (iv) contingency procedures;

  • (c) the aircraft meets one of the following eligibility requirements:

    • (i) the aircraft flight manual or the pilot operating handbook, or any equivalent document provided by the manufacturer of the avionics equipment or by the aircraft manufacturer, specifies that the aircraft can be operated in accordance with RNP 10 requirements,

    • (ii) the aircraft can be operated in accordance with another navigation standard with performance criteria that are equivalent to RNP 10 requirements, or

    • (iii) the private operator has demonstrated to the Minister, using one of the data collection methods set out in section 1.3.3.1.4.2 of Chapter 1 of Part B of Volume II of the PBN Manual, that the aircraft meets the navigational accuracy requirements for RNP 10;

  • (d) the aircraft is equipped with the navigation equipment referred to in sections 1.3.4 and 1.3.6.1 of Chapter 1 of Part B of Volume II of the PBN Manual;

  • (e) the equipment referred to in paragraph (d) meets the standards, criteria and performance requirements set out in sections 1.3.4.1, 1.3.4.2, 1.3.6.1 and 1.3.11 of Chapter 1 of Part B of Volume II of the PBN Manual; and

  • (f) the private operator applies the processes, practices and procedures relating to the duties and practices set out in sections 1.3.7, 1.3.8 and 1.3.9.2 to 1.3.9.9 of Chapter 1 of Part B of Volume II of the PBN Manual.

  • SOR/2014-131, s. 18
  • SOR/2019-122, s. 9(F)

Date modified: