Government of Canada / Gouvernement du Canada
Symbol of the Government of Canada

Search

Canadian Energy Regulator Onshore Pipeline Regulations

Version of section 51 from 2020-03-16 to 2024-10-30:


 If a company constructs a pipeline that crosses a utility or private road, the company shall

  • (a) immediately notify the Regulator of the details of unplanned interruption in the operation of the utility or any unplanned closure of the road if the interruption or closure results from the construction of the crossing; and

  • (b) on request, submit a crossing report to the Regulator that sets out

    • (i) the description and location of the utility or road, and

    • (ii) the name of the authority having control over the utility or the name of the owner of the road.

  • SOR/2020-50, s. 29

Date modified: