Canadian Energy Regulator Onshore Pipeline Regulations
Version of section 9 from 2007-03-01 to 2020-03-15:
9 A company shall develop detailed designs of the pipeline and submit them to the Board when required to do so.
- SOR/2007-50, s. 6
- Date modified: