Wastewater Systems Effluent Regulations
Version of the schedule from 2013-01-01 to 2024-05-26:
SCHEDULE 3(Subsections 24(2), 25(1) and 26(2))
System of Points — Combined Sewer Overflow Points
Item | Column 1 | Column 2 | Column 3 |
---|---|---|---|
Factors | Criteria | Points | |
1 | The ratio — during the period of 12 consecutive months referred to in subsection 24(1) of these Regulations upon which the application is based — of the estimated average dry weather flow that circulates in the combined sewer at the overflow point to the estimated average dry weather flow that is deposited via the final discharge point, expressed as a percentage |
| 35 points |
| 25 points | ||
| 15 points | ||
| 10 points | ||
2 | The number of deposits via the overflow point during the period of 12 consecutive months referred to in subsection 24(1) of these Regulations upon which the application is based |
| 35 points |
| 25 points | ||
| 15 points | ||
| 5 points | ||
3 | Water where effluent is deposited via each overflow point (the sum of points for all that apply) |
| 20 points |
| 10 points | ||
| 10 points |