Government of Canada / Gouvernement du Canada
Symbol of the Government of Canada

Search

Pulp and Paper Effluent Regulations

Version of section 20 from 2008-07-28 to 2024-11-26:


 The maximum BOD of the BOD matter and the maximum quantities of suspended solids that the owner or operator of a mill referred to in paragraph 15(1)(b) may be authorized to deposit, or to permit the deposit of, under an authorization are as follows:

  • (a) in respect of a daily period, the amounts determined using the formula

    Qd = (F1 × 2.5 × RPR1) + (F2 × 2.5 × RPR2)

and

  • (b) in respect of a month, the amounts determined using the formula

    Qm = (F1 × D × 1.5 × RPR1) + (F2 × D × 1.5 × RPR2)

    where

    D
    is the number of calendar days in the month,
    F1
    is equal to a factor of 5 for BOD and 7.5 for suspended solids, expressed in kilograms per tonne of finished product other than dissolving grade sulphite pulp,
    F2
    is equal to a factor of 18 for BOD and 25 for suspended solids, expressed in kilograms per tonne of dissolving grade sulphite pulp,
    Qd
    is the maximum BOD of the BOD matter that may be deposited during a daily period or the maximum quantity of suspended solids that may be deposited during a daily period, expressed in kilograms,
    Qm
    is the maximum BOD of the BOD matter that may be deposited during a month or the maximum quantity of suspended solids that may be deposited during a month, expressed in kilograms,
    RPR1
    is the reference production rate of the mill for all finished product other than dissolving grade sulphite pulp, expressed in tonnes per day, and
    RPR2
    is the reference production rate of the mill for dissolving grade sulphite pulp, expressed in tonnes per day.
  • SOR/2004-109, s. 15
  • SOR/2008-239, s. 6(E)

Date modified: