Basic Search

 
Display / Hide Categories
3 results
Didn't find what you're looking for?
Search all Government of Canada websites

  1. Marine Machinery Regulations - SOR/90-264 (SCHEDULE XV : Bilge and Ballast Pumping Systems, Heeling, Trimming and Passive Roll Stabilizing Tank Filling and Emptying Systems)

    [...]

    [...]

    Item Requirements
    77 Valves, cocks, pipes or other components attached directly to the plating of tanks and to watertight divisions shall be secured by
    • (a) screwing studs through the plating;

    • [...]

    • (c) welding the studs or the bulkhead piece to the plating.

    [...]


  2. Marine Machinery Regulations - SOR/90-264 (SCHEDULE VI : Reversing and Reduction Gearing, Shafting Systems and Propellers)

    [...]

    [...]

    Item Requirements
    9 Controllable pitch propellers
    • (a) with hubs removed from screw shafts, at intervals not exceeding 10 years except that hubs are not required to be removed from the shafts if the securing studs or cap screws can be extracted and inspected, especially the threaded portions of hubs and securing studs or cap screws; and

    [...]


  3. Marine Machinery Regulations - SOR/90-264 (SCHEDULE XV : Bilge and Ballast Pumping Systems, Heeling, Trimming and Passive Roll Stabilizing Tank Filling and Emptying Systems)

    [...]

    [...]

    Item Requirements
    77 Valves, cocks, pipes or other components attached directly to the plating of tanks and to watertight divisions shall be secured by
    • (a) screwing studs through the plating;

    • [...]

    • (c) welding the studs or the bulkhead piece to the plating.

    [...]



Date modified: