Basic Search

 
Display / Hide Categories
5 results
Didn't find what you're looking for?
Search all Government of Canada websites

  1. Reduction of Carbon Dioxide Emissions from Coal-fired Generation of Electricity Regulations - SOR/2012-167 (SCHEDULE 3 : Information on Section 10 Requirements)

    [...]

    1 If a front end engineering design study referred to in paragraph 10(a) of these Regulations has been carried out, the following information to summarize that study:

    • [...]

    • (h) the name and business address of the persons responsible for the development of the front end engineering design study and a description of their contribution to its development;

    • (i) a description of the capture technology selected in the front end engineering design study for the capture element of the carbon capture and storage system and of the capture element’s integration with the unit;

    [...]


  2. Reduction of Carbon Dioxide Emissions from Coal-fired Generation of Electricity Regulations - SOR/2012-167 (Section 9)
    Marginal note:Application
    • [...]

    • (2) The application must indicate the unit’s registration number and include the following supporting documents and information:

      • (a) a declaration that includes statements indicating that

        • (i) based on the economic feasibility study referred to in paragraph (b), the unit, when operating with an integrated carbon capture and storage system is, to the best of the responsible person’s knowledge and belief, economically viable, and

        • (ii) based on the technical feasibility study referred to in paragraph (c) and the implementation plan referred to in paragraph (e), the responsible person expects to satisfy the requirements set out in section 10 and, as a result, to be in compliance with subsection 3(1) by January 1, 2025;

      • (b) an economic feasibility study that demonstrates the economic viability of the unit when it operates with an integrated carbon capture and storage system and that

        [...]

      • (c) a technical feasibility study that establishes — based on information referred to in Schedule 2 related to the capture, transportation and storage elements of the carbon capture and storage system — that there are no insurmountable technical barriers to carrying out the following activities:

        [...]

    [...]


  3. Reduction of Carbon Dioxide Emissions from Coal-fired Generation of Electricity Regulations - SOR/2012-167 (SCHEDULE 2 : Technical Feasibility)

    SCHEDULE 2(Paragraph 9(2)(c))Technical Feasibility Study — Information Required

    [...]

    3 The following information respecting the storage element of the carbon capture and storage system:

    • [...]

    • (b) an identification of one or more suitable geological sites for storage that are expected to be used to store the captured CO2 emissions, supported by a delineation of the geographical extent of each storage site and at least one study showing that the required capacity to store the sufficient volume of CO2 referred to in subparagraph 9(2)(c)(i) of these Regulations is available based on generally accepted national or international protocols for storage capacity estimation;


  4. Reduction of Carbon Dioxide Emissions from Coal-fired Generation of Electricity Regulations - SOR/2012-167 (Section 2)
    Marginal note:Definitions
    •  (1) The following definitions apply in these Regulations.

      front end engineering design study

      front end engineering design study means a collection of studies that provide the necessary details to support the carrying out of a construction project for the capture element of a carbon capture and storage system, including

      [...]

    [...]


  5. Reduction of Carbon Dioxide Emissions from Coal-fired Generation of Electricity Regulations - SOR/2012-167 (Section 10)

     A responsible person who has been granted a temporary exemption in respect of a unit under subsection 9(3) must satisfy the following requirements:

    • (a) carry out a front end engineering design study by January 1, 2020;

    [...]



Date modified: