Basic Search

 
Display / Hide Categories
3 results
Didn't find what you're looking for?
Search all Government of Canada websites

  1. Physical Activities Regulations - SOR/2019-285 (SCHEDULE : Physical Activities)

    [...]

    [...]

    1 The construction, operation, decommissioning and abandonment in a wildlife area, as defined in section 2 of the Wildlife Area Regulations, a migratory bird sanctuary, as defined in subsection 2(1) of the Migratory Bird Sanctuary Regulations or a protected marine area established under subsection 4.1(1) of the Canada Wildlife Act, of one of the following:

    • [...]

    • (c) a new oil or gas facility or oil and gas pipeline;

    [...]

    24 The construction, operation, decommissioning and abandonment of a new oil sands mine with a bitumen production capacity of 10 000 m3/day or more.

    25 The expansion of an existing oil sands mine, if the expansion would result in an increase in the area of mining operations of 50% or more and the total bitumen production capacity would be 10 000 m3/day or more after the expansion.

    [...]

    Oil, Gas and Other Fossil Fuels

    [...]

    32 The construction, operation, decommissioning and abandonment of a new in situoil sands extraction facility that has a bitumen production capacity of 2 000 m3/day or more and that is

    • (a) not within a province in which provincial legislation is in force to limit the amount of greenhouse gas emissions produced by oil sands sites in the province; or

    • (b) within a province in which provincial legislation is in force to limit the amount of greenhouse gas emissions produced by oil sands sites in the province and that limit has been reached.

    33 The expansion of an existing in situoil sands extraction facility, if the expansion would result in an increase in bitumen production capacity of 50% or more and a total bitumen production capacity of 2 000 m3/day or more, if the facility is

    • (a) not within a province in which provincial legislation is in force to limit the amount of greenhouse gas emissions produced by oil sands sites in the province; or

    • (b) within a province in which provincial legislation is in force to limit the amount of greenhouse gas emissions produced by oil sands sites in the province and that limit has been reached.

    34 The drilling, testing and abandonment, in an area set out in one or more exploration licences issued in accordance with the Canada Petroleum Resources Act, the Canada–Newfoundland and Labrador Atlantic Accord Implementation Act or the Canada-Nova Scotia Offshore Petroleum Resources Accord Implementation Act, of offshore exploratory wells in the first drilling program, as defined in subsection 1(1) of the Canada Oil and Gas Drilling and Production Regulations, SOR/2009-315.

    35 The construction, installation and operation of a new offshore floating or fixed platform, vessel or artificial island used for the production of oil or gas.

    36 The decommissioning and abandonment of an existing offshore floating or fixed platform, vessel or artificial island used for the production of oil or gas that is proposed to be disposed of or abandoned offshore or converted on site to another role.

    37 The construction, operation, decommissioning and abandonment of one of the following:

    • (a) a new oil refinery, including a heavy oil upgrader, with an input capacity of 10 000 m3/day or more;

    38 The expansion of one of the following:

    • (a) an existing oil refinery, including a heavy oil upgrader, if the expansion would result in an increase in input capacity of 50% or more and a total input capacity of 10 000 m3/day or more;

    [...]

    40 The construction, operation, decommissioning and abandonment of a new offshore oil and gas pipeline, other than a flowline as defined in subsection 2(1) of the Canada Oil and Gas Installations Regulations.

    [...]


  2. Physical Activities Regulations - SOR/2019-285 (Section 1)
    Marginal note:Definitions
    •  (1) The following definitions apply in these Regulations.

      new right of way

      new right of way  means land that is to be developed for an international electrical transmission line, a pipeline, as defined in section 2 of the Canadian Energy Regulator Act, a railway line or an all-season public highway, and that is not alongside and contiguous to an area of land that was developed for an electrical transmission line, oil and gas pipeline, railway line or all-season public highway. (nouvelle emprise)

      offshore

      offshore  means, except in respect of an offshore area, anything that is located in

      oil and gas pipeline

      oil and gas pipeline  means a pipeline that is used, or is to be used, for the transmission of oil or gas alone or with any other commodity. (pipeline d’hydrocarbures)

    [...]


  3. Physical Activities Regulations - SOR/2019-285 (Section 1)

    [...]

    Marginal note:Definitions
    • [...]

       (1) The following definitions apply in these Regulations.

      new right of way

      new right of way  means land that is to be developed for an international electrical transmission line, a pipeline, as defined in section 2 of the Canadian Energy Regulator Act, a railway line or an all-season public highway, and that is not alongside and contiguous to an area of land that was developed for an electrical transmission line, oil and gas pipeline, railway line or all-season public highway. (nouvelle emprise)

      offshore

      offshore  means, except in respect of an offshore area, anything that is located in

      oil and gas pipeline

      oil and gas pipeline  means a pipeline that is used, or is to be used, for the transmission of oil or gas alone or with any other commodity. (pipeline d’hydrocarbures)



Date modified: