[...]
1 The construction, operation, decommissioning and abandonment, in a wildlife area or migratory bird sanctuary, of a new
[...]
8 The construction, operation, decommissioning and abandonment of a new oil sands mine with a bitumen production capacity of 10 000 m3/day or more.
9 The expansion of an existing oil sands mine that would result in an increase in the area of mine operations of 50% or more and a total bitumen production capacity of 10 000 m3/day or more.
[...]
11 The construction, installation and operation of a new offshore floating or fixed platform, vessel or artificial island used for the production of oil or gas.
12 The decommissioning and abandonment of an existing offshore floating or fixed platform, vessel or artificial island used for the production of oil or gas that is proposed to be disposed of or abandoned offshore or converted on site to another role.
13 The construction, operation, decommissioning and abandonment of a new offshore oil and gas pipeline, other than a flowline.
14 The construction, operation, decommissioning and abandonment of a new
15 The expansion of an existing
[...]
41 The construction, installation and operation of a new offshore floating or fixed platform, vessel or artificial island used for the production of oil or gas.
42 The decommissioning and abandonment of an existing offshore floating or fixed platform, vessel or artificial island used for the production of oil or gas that is proposed to be disposed of or abandoned offshore or converted on site to another role.
[...]
48 The construction, operation, decommissioning and abandonment, in a wildlife area or migratory bird sanctuary, of
[...]