Building Canada Act

Version of the schedule from 2026-10-01 to 2026-10-19:


SCHEDULE 1(Section 2 and subsections 5(1), (3) and (4))

National Interest Projects

Column 1Column 2
ItemName of ProjectDescription of Project
1West Coast Oil Pipeline

Interprovincial pipeline capable of transporting one million barrels per day of Canadian crude oil, from Bruderheim, Alberta (approximately 50 km northeast of Edmonton) to a deepwater port near Delta, British Columbia (approximately 35 km south of Vancouver), for transfer to vessels and shipping to global markets, including the following major components:

  • 1 
    a receipt tank terminal in Bruderheim, Alberta, where product will be received, measured, stored and then pumped through the pipeline;
  • 2 
    a pipeline up to approximately 1 250 km in length;
  • 3 
    power interconnection, transmission and possible generation;
  • 4 
    approximately 11 pump stations along the route to keep product flowing and maintain the required flow rate and pressure over long distances; and
  • 5 
    a delivery tanks terminal and offshore marine loading facility with capacity for Very Large Crude Carrier vessels where product will be delivered, stored and then loaded onto Very Large Crude Carrier vessels.
  • 2025, c. 2, s. 4 “Sch. 1”
  • P.C. 2026-925, Canada Gazette Part I, Volume 160, page 2620