Canadian Energy Regulator Act (S.C. 2019, c. 28, s. 10)
Full Document:
- HTMLFull Document: Canadian Energy Regulator Act (Accessibility Buttons available) |
- XMLFull Document: Canadian Energy Regulator Act [817 KB] |
- PDFFull Document: Canadian Energy Regulator Act [1355 KB]
Act current to 2026-03-17 and last amended on 2024-11-27. Previous Versions
Marginal note:Where certificate required
258 (1) The Governor in Council may, by order,
(a) designate an international power line as an international power line that is to be constructed and operated in accordance with a certificate issued under section 262; and
(b) revoke any permit issued in respect of the line.
Marginal note:Limitation
(2) No order may be made under subsection (1) in respect of a power line more than 45 days after the issuance of a permit in respect of the line.
Marginal note:Effect of order
(3) If an order is made under subsection (1),
(a) no permit is to be issued in respect of the power line; and
(b) any application in respect of the line is to be dealt with as an application for a certificate.
Page Details
- Date modified: