Large Fishing Vessel Inspection Regulations
Version of section 26 from 2017-02-03 to 2024-11-26:
26 Every vessel, the construction of which is commenced after May 31, 1974, shall be fitted with a carbon dioxide smothering system that
(a) discharges into the machinery space; and
(b) complies with the requirements of section 3 of Schedule III to the Fire Detection and Extinguishing Equipment Regulations, as they read immediately before being repealed.
- SOR/2017-14, s. 408
- Date modified: