Coastal Fisheries Protection Regulations
Version of section 37.1 from 2006-03-22 to 2014-06-05:
37.1 When an inspection vessel sends Signal SQ 3 to a fishing vessel of a participating state that has begun or is about to begin hauling its nets, the fishing vessel shall ensure that the nets are not hauled for a period of at least 30 minutes after the signal has been sent.
- SOR/2004-110, s. 13
- Date modified: