Metal and Diamond Mining Effluent Regulations
36 An owner or operator of a mine who has been issued a transitional authorization
(a) shall comply with sections 6 to 27 and, if the mine is depositing effluent into a tailings impoundment area, subsection 28(1);
(b) shall start the construction of the facilities and implement the procedures referred to in paragraph 34(4)(b) or (5)(b), as applicable, in a timely manner;
(c) shall report to the authorization officer, without delay, any change in the information provided under subsection 34(4) or (5);
(d) shall not deposit effluent that contains a deleterious substance set out in column 1 of Schedule 4 that exceeds the maximum concentration that is specified in the transitional authorization or has a pH that is outside the pH range specified in the transitional authorization; and
(e) shall not deposit effluent that is acutely lethal unless authorized to do so in the transitional authorization.
- Date modified: