Language selection

Government of Canada

Search

Canada Oil and Gas Drilling and Production Regulations (SOR/2009-315)

Regulations are current to 2026-05-26 and last amended on 2009-12-31. Previous Versions

 The operator shall ensure that a copy of the following is submitted to the Board daily:

  • (a) the daily drilling report;

  • (b) the daily geological report, including any formation evaluation logs and data; and

  • (c) in the case of a production installation, a summary, in the form of a daily production report, of the records referred to in paragraph 77(d) and the daily production record.

Page Details

Date modified: