Wastewater Systems Effluent Regulations
Marginal note:Deposit without or with partial treatment
43 (1) An owner or operator of a wastewater system may apply to an authorization officer for a temporary authorization to bypass at least one of the treatment processes normally applied to wastewater in the system and, as a result, to deposit effluent that contains any deleterious substance prescribed in section 5.
Marginal note:Conditions precedent
(2) An application for a temporary bypass authorization is not to be made unless
(a) the requirement to bypass those treatment processes arises from
(i) construction work to make changes to the system,
(ii) the maintenance of the system, or
(iii) the response to an anticipated event that is beyond the control of the owner or operator of the system; and
(b) the bypass is designed, within the constraints of technical and economic feasibility, to minimize the volume of effluent deposited and the concentration of deleterious substances prescribed in section 5 in the effluent deposited.
Marginal note:Period for application
(3) An application for a temporary bypass authorization must be made at least 45 days before the day on which the requirement referred to in paragraph (2)(a) is to arise.
- Date modified: