Explosives Regulations, 2013
Marginal note:Information on packaging
51 (1) A holder of an in transit permit must ensure that the following information is legibly printed on the packaging, or on a label affixed to the packaging, of each explosive to be transported in transit:
(a) the name or product name of the explosive;
(b) a description of the explosive;
(c) the UN number of the explosive; and
(d) the quantity to be transported.
Marginal note:Interruption of in transit transportation
(2) If anything interrupts an in transit transportation of explosives and, as a consequence, the explosives need to be stored, the holder of the in transit permit must ensure that they are stored in a licensed magazine, storage unit or dwelling in accordance with these Regulations or at a secure storage site.
Marginal note:Report
(3) A holder of an in transit permit must complete, sign and send to the Chief Inspector of Explosives a report using the form provided by the Department of Natural Resources. The report must include the following information:
(a) the permit holder’s name, address, telephone number, fax number and email address;
(b) the holder’s permit number and its expiry date;
(c) the name or product name, the UN number and a description of each explosive that was transported in transit; and
(d) the quantity and UN number of each type of explosive that was transported in transit;
(e) the country of origin of each explosive;
(f) the means of transport used;
(g) the location of the Canadian port of entry and port of exit through which each explosive passed; and
(h) the date of the report and the name of the person who completed the report.
Marginal note:Deadline — annual permit
(4) A holder of an annual permit must submit the report before the permit is renewed or, if the permit is not renewed, within a year after it expires. The report must be submitted even if no explosives were transported in transit during the year for which the permit was valid.
Marginal note:Deadline — single use permit
(5) A holder of a single use permit must submit the report within 30 days after the date on which the explosives entered Canada.
- SOR/2016-75, s. 39
- SOR/2018-231, ss. 11, 44(F), 45(E)
- SOR/2022-121, s. 4
- Date modified: