Canada – Nova Scotia Offshore Marine Installations and Structures Occupational Health and Safety Transitional Regulations
51 (1) A record of each inspection carried out under sections 44 and 47 to 50 must be completed and
(a) must be signed by the inspector; and
(b) must include
(i) the date of the inspection,
(ii) the identification and location of the boiler, pressure vessel or piping system that was inspected,
(iii) the maximum allowable working pressure and the maximum temperature at which the boiler or pressure vessel may be operated,
(iv) a declaration as to whether the boiler, pressure vessel or piping system meets the standards prescribed by this Part,
(v) a declaration as to whether, in the inspector’s opinion, the boiler, pressure vessel or piping system is safe for its intended use,
(vi) if appropriate in the inspector’s opinion, recommendations regarding the need for more frequent inspections or tests than are required by section 47, 48 or 49, and
(vii) any other observation that the inspector considers relevant to the safety of employees.
(2) The employer must keep every record for one year after the date that the next inspection is required by this Part.
- SOR/2017-116, s. 9