Canada–Newfoundland and Labrador Offshore Area Petroleum Operations Framework Regulations (SOR/2024-25)

Regulations are current to 2026-09-30 and last amended on 2026-09-17. Previous Versions

Marginal note:Operations manual

  •  (1) An operator must develop an operations manual in respect of each installation that sets out or incorporates by reference the following documents and information:

    • (a) a general description of the installation, including its particular characteristics;

    • (b) the chain of command and the roles, responsibilities and authorities of persons during normal operations of the installation and in emergency situations;

    • (c) a brief description of the systems and equipment on the installation, including flow sheets and instructions for the assembly, use and maintenance of the systems and equipment;

    • (d) the operating limits of the installation, including those of its systems and equipment;

    • (e) the physical and environmental conditions under which the installation and any pipeline can operate without compromising safety or the protection of the environment and the physical and environmental conditions that the installation and pipeline can withstand, taking into account the results of any analyses, tests, numerical modelling or investigations undertaken under subsection 105(2);

    • (f) the results of the risk and reliability analysis conducted for the purpose of subsection 108(1);

    • (g) a list of the procedures necessary to ensure the safe operation of the installation, including its systems and equipment, within the limits described in paragraph (d);

    • (h) a list of the accidental events that would require implementing the contingency plan referred to in section 11, any possible triggers for such events and the measures to be implemented to avoid their occurrence;

    • (i) a list of the procedures, practices, resources and monitoring measures set out in the contingency plan referred to in section 11;

    • (j) the criteria for each platform’s minimum penetration into the seabed or for the maximum scour of the platform’s foundation and an indication of the arrangement of the platform’s anchoring system;

    • (k) a description of the characteristics of each platform’s foundation and its penetration into the seabed or an indication of the arrangement of the platform’s anchoring system, as well as a description of the measures to be implemented to monitor the integrity of the foundation or that of the mooring and anchoring systems;

    • (l) the criteria to identify meteorological and oceanographic conditions and phenomena that require subsea components and pipelines to be inspected;

    • (m) plans that show the arrangement of watertight and weathertight subdivisions;

    • (n) details of openings in watertight and weathertight subdivisions, including the location of vents, air pipes and all other means of water penetration, and the means of closure of the compartments, as well as the location of downflooding points;

    • (o) a plan that contains information concerning permissible deck loads, variable loading limits and preloading;

    • (p) details of all audible and visual signals and alarms used in the communication system referred to in section 129, the general alarm system referred to in section 130, the fire and gas detection system referred to in section 132 and the emergency shutdown system referred to in section 133, as well as details of any colour-coding systems used for the safety of persons on the installation;

    • (q) information on any corrosion protection and prevention systems, including their type and location, and any requirements for the safety and maintenance of those systems;

    • (r) technical drawings that show

      • (i) the arrangement of any deck structure and of the equipment located on it, of all accommodations areas and temporary safe refuges and of any aircraft landing area, including its obstacle-free approach zone,

      • (ii) sufficient details to permit verification and management, if applicable, of the integrity of hulls, mooring components, primary and critical structures, foundation elements, jacking mechanisms, risers and conductors,

      • (iii) the arrangement of hazardous areas and of any equipment located in those areas, and

      • (iv) a fire control and evacuation plan, including

        • (A) the location of escape routes, fixed fire suppression systems and life-saving appliances, and

        • (B) the arrangement of barriers that provide passive fire and blast protection and associated equipment, along with a description of those barriers and equipment;

    • (s) the operating and maintenance requirements for all the life-saving appliances referred to in section 119;

    • (t) information identifying the aircraft that were used for the design of any aircraft landing area on the installation and the maximum weight, size and wheel centres of those aircraft;

    • (u) any special arrangements in place to facilitate the inspection and maintenance of the installation, including its systems and equipment, and the storage of any crude oil on the installation;

    • (v) special precautions to be taken or instructions to be followed when repairs or alterations to the installation, including its systems or equipment, are to be carried out;

    • (w) any special operational or emergency requirements and procedures with respect to any systems and equipment that are critical to safety, including the emergency shutdown system referred to in section 133;

    • (x) a description of the air gap or freeboard and of the means of ensuring that the requirements under section 141 and subsections 142(2) and 145(1) and (3), as the case may be, are met;

    • (y) the number of persons who can be accommodated on the installation during normal operations;

    • (z) a description of the main electrical power supply referred to in subsection 122(4) and the emergency electrical power supply referred to in section 126 and any limitations on their operation;

    • (z.1) the procedure for periodically documenting the results of all inspections, monitoring, testing and maintenance of the installation’s integrity, including the format and presentation of that documentation; and

    • (z.2) the procedure for notifying the Chief Safety Officer and the certifying authority under subsections 162(1) and 170(1) and (2).

  • Marginal note:Additional information — floating platform

    (2) In the case of a floating platform, the operations manual must also contain

    • (a) a description of the platform’s station-keeping system and its capabilities, taking into account the platform’s operating limits;

    • (b) all procedures for addressing the failure of any component of the station-keeping system that is critical to safety;

    • (c) if the station-keeping system is a mooring system, descriptions of the environmental loads that the moorings can sustain to keep the platform moored in place, the estimated holding power and capacity of the anchors in relation to the soil at the drill site or production site and the physical and environmental conditions in which reconnection of the platform is permitted;

    • (d) the procedures for addressing an excursion outside of the limits established in the context of the analysis and model testing under subsections 147(2) and 149(2);

    • (e) a description and the limitations of any onboard computer or computer-based control systems used in operations such as ballasting and dynamic positioning and in the platform’s trim and stability calculations;

    • (f) instructions on how to assess the loading and ballast conditions of the platform to determine its stability and how to manage those conditions to maintain the platform’s stability in accordance with the provisions referred to in subsection 142(3);

    • (g) data on the location, type and weights of permanent ballast installed on the platform;

    • (h) hydrostatic curves or equivalent data;

    • (i) a plan that shows the capacities and the centres of gravity of tanks and bulk material stowage compartments;

    • (j) tank-sounding tables or curves that show the capacities and the centres of gravity in graduated intervals and the free surface data for each tank;

    • (k) stability data that take into account the maximum height of the centre of gravity above the keel in relation to the draught curve and other parameters relevant to the stability of the platform;

    • (l) the results of any inclining test, or of any lightweight survey together with the inclining test results, and the updated location of the platform centre of gravity following a deadweight survey;

    • (m) examples of loading conditions for each mode of operation, together with the means to evaluate any other loading conditions;

    • (n) technical drawings that

      • (i) show the arrangement and location of all openings that could affect the stability of the platform and their means of closure,

      • (ii) show the arrangement and operation of the ballast and bilge systems,

      • (iii) are accompanied by the operating instructions for the ballast and bilge systems, and

      • (iv) are sufficient in their scope and detail to ensure, in combination with the instructions referred to in subparagraph (iii), that

        • (A) the necessary draught, stability and hull strength can be maintained under all foreseeable operating conditions, and

        • (B) the floating platform can be returned to a safe condition from an unintended draught, trim or heel; and

    • (o) a towing arrangement plan, if necessary, and the operating limits of the towing equipment’s components.

  • Marginal note:Additional information — mobile offshore platform

    (3) In the case of a self-elevating mobile offshore platform, the operations manual must also contain

    • (a) a description of any equipment for elevating and lowering the installation and details of any special types of joints and their purpose, including any operating or maintenance instructions for the equipment and joints; and

    • (b) the allowable limits for hull inclination and rack phase differential.

  • Marginal note:Up-to-date

    (4) The operator must ensure that the operations manual is kept up-to-date.