Canada–Nova Scotia Offshore Area Petroleum Operations Framework Regulations (SOR/2024-26)

Regulations are current to 2024-06-11

PART 8Drilling and Production (continued)

Spill-treating Agent (continued)

The following provision is not in force.

Marginal note:Variation of approval

  • The following provision is not in force.

     (1) The Chief Conservation Officer must vary the approval to use a spill-treating agent if new information indicates that a modification to the requirements set out in the approval is necessary to ensure that the approved use is likely to achieve a net environmental benefit.

  • The following provision is not in force.

    Marginal note:Revocation of approval

    (2) The Chief Conservation Officer must revoke the approval if new information indicates that, despite any modification, use of the agent will not likely achieve a net environmental benefit.

The following provision is not in force.

Marginal note:Use of spill-treating agent

  • The following provision is not in force.

     (1) An operator must ensure that any spill-treating agent is used in accordance with industry standards and best practices for spill-treating agent use, taking into account the local environment.

  • The following provision is not in force.

    Marginal note:Equipment and materials

    (2) The operator must ensure that all equipment and materials that are listed in the contingency plan as required by paragraph 11(4)(e) are available and maintained in accordance with the manufacturers’ specifications and ready for use at all times.

  • The following provision is not in force.

    Marginal note:Monitoring plan implementation

    (3) The operator must implement the monitoring plan that is included in the contingency plan as required by paragraph 11(4)(f) at the commencement of the use of a spill-treating agent in the case of a spill.

  • The following provision is not in force.

    Marginal note:Information to Chief Conservation Officer

    (4) The operator must inform the Chief Conservation Officer of the spill-treating agent’s efficacy, the effects of its use on the environment and any changes that may require a modification to its use.

Well Abandonment, Suspension or Completion

The following provision is not in force.

Marginal note:Conditions for suspension or abandonment

  • The following provision is not in force.

     (1) An operator that suspends or abandons a well must ensure that the well

    • The following provision is not in force.

      (a) can be readily located; and

    • The following provision is not in force.

      (b) is left in a condition such that

      • (i) all petroleum-bearing pools and zones and discrete pressure zones are isolated, and

      • (ii) any formation fluid is prevented from flowing through or escaping from the well-bore.

  • The following provision is not in force.

    Marginal note:Verification of isolation

    (2) Before suspending or abandoning the well, the operator must verify the effectiveness of the isolations referred to in subparagraph (1)(b)(i) in accordance with the methods set out in its well approval application under paragraph 17(4)(e).

The following provision is not in force.

Marginal note:Additional condition for suspension

 An operator that suspends a well must ensure that it is inspected and monitored to maintain its integrity and prevent pollution.

The following provision is not in force.

Marginal note:Additional condition for abandonment

 The operator of a well must ensure that, on the abandonment of the well, the seabed is cleared of any material or equipment that might have an adverse effect on the marine environment or interfere with fishing activities or other uses of the sea.

The following provision is not in force.

Marginal note:Conditions for drilling installation removal

 It is prohibited for the operator of a drilling installation to remove the drilling installation from a well or cause it to be removed unless

  • The following provision is not in force.

    (a) the well has been abandoned, suspended or completed in accordance with these Regulations; or

  • The following provision is not in force.

    (b) the removal of the drilling installation is for emergency purposes.

PART 9Diving Projects

The following provision is not in force.

Marginal note:Vessel used in diving project

 An operator that conducts a diving project must, in respect of a vessel used in the diving project, ensure that

  • The following provision is not in force.

    (a) the vessel is capable of providing the necessary dive support functions and operating safely;

  • The following provision is not in force.

    (b) the vessel is designed to withstand or avoid, without loss of its overall structural integrity or failure of its main safety functions, all foreseeable site-specific physical and environmental conditions or any foreseeable combination of those conditions;

  • The following provision is not in force.

    (c) the vessel is a Safety Convention vessel, as defined in section 2 of the Canada Shipping Act, 2001, and holds a valid certificate of class issued by a classification society;

  • The following provision is not in force.

    (d) if a permanent diving system is installed on the vessel, the certificate of class referred to in paragraph (c) includes a valid class notation for diving issued by the classification society referred to in that paragraph; and

  • The following provision is not in force.

    (e) a competent third party has assessed and certified the sea fastening of any equipment that is temporarily installed on the vessel for the diving project.

The following provision is not in force.

Marginal note:Dynamic positioning system

  • The following provision is not in force.

     (1) An operator must ensure that the dynamic positioning system on a vessel that is used in a diving project

    • The following provision is not in force.

      (a) includes safety-critical systems and components with sufficient segregation and redundancy to maintain the vessel’s position in the event that credible scenarios of equipment failure, fire or flooding are realized;

    • The following provision is not in force.

      (b) includes systems to monitor the parameters of critical system operability and the integrity of the dynamic positioning system and to provide alerts for critical system faults;

    • The following provision is not in force.

      (c) has sufficient redundancy to protect divers while diving;

    • The following provision is not in force.

      (d) is designed based on numerical analysis and model testing to ensure that the vessel’s position reference and directional control can be maintained within specified tolerances that satisfy design operational requirements in relation to all functional loads and environmental loads to which the system may be subjected; and

    • The following provision is not in force.

      (e) is designed to ensure that, if the diving project involves saturation diving, the dynamic positioning system can withstand the loss from fire or flooding of all of its components situated in any one watertight compartment or fire subdivision of the vessel.

  • The following provision is not in force.

    Marginal note:Verification

    (2) After the design of the dynamic positioning system is completed, the operator must ensure that a failure modes and effects analysis is conducted to verify that the dynamic positioning system meets the requirements set out in subsection (1).

  • The following provision is not in force.

    Marginal note:Maintenance

    (3) The operator must ensure that the dynamic positioning system is maintained so that it continues to perform in accordance with its design specifications.

The following provision is not in force.

Marginal note:Light dive craft

  • The following provision is not in force.

     (1) The operator must ensure that any light dive craft that is used for a diving project is

    • The following provision is not in force.

      (a) fit for the purposes for which it is to be used; and

    • The following provision is not in force.

      (b) designed to withstand or avoid, without loss of its overall structural integrity or failure of its main safety functions, all foreseeable site-specific physical and environmental conditions or any foreseeable combination of those conditions.

  • The following provision is not in force.

    Marginal note:Dive support vessel

    (2) The operator must ensure, during all dives from a light dive craft, the availability of a dive support vessel that

    • The following provision is not in force.

      (a) is fitted with emergency equipment, including a fast rescue boat, that can provide assistance to the light dive craft in any foreseeable emergency situation; and

    • The following provision is not in force.

      (b) has a launch and recovery system for the light dive craft that has been verified and certified by the certifying authority as being fit for the purposes for which it is to be used.

  • The following provision is not in force.

    Marginal note:Definition of light dive craft

    (3) In this section, light dive craft means a small vessel or secondary craft that is equipped to deploy divers from a primary vessel.

PART 10Installations, Wells and Pipelines

Definitions

The following provision is not in force.

Marginal note:Definitions

 The following definitions apply in this Part.

air gap

air gap means the clearance between the highest water or ice surface that occurs during extreme environmental conditions and the lowest exposed part of an installation not designed to withstand wave or ice impingement. (tirant d’air)

control station

control station means a work area that is not continuously staffed that provides an alternative location to a control centre and the minimum necessary control equipment to enable essential management of the installation or of specific key systems. (poste de contrôle)

damaged condition

damaged condition means, with respect to a floating platform, the condition of the platform after it has suffered damage up to the extent determined in accordance with the applicable provisions of the MODU Code or, in the case of a platform that is not a mobile offshore drilling unit, the applicable rules of a classification society. (état d’avarie)

design service life

design service life means the anticipated period during which any installation, including its systems or equipment, is to be used for its intended purpose, with anticipated maintenance but without substantial repair. (vie utile)

hazardous area

hazardous area means an area on an installation where flammable, explosive or combustible mixtures are or are likely to be present in sufficient quantities and for sufficient periods of time to require special precautions to be taken in the selection, installation or use of machinery and electrical equipment to prevent a fire or explosion. (aire dangereuse)

IS Code

IS Code means the annex to International Maritime Organization Resolution MSC.267(85), International Code on Intact Stability, 2008. (recueil IS)

MODU Code

MODU Code means the annex to International Maritime Organization Resolution A.1023(26), Code for the Construction and Equipment of Mobile Offshore Drilling Units, 2009. (Code MODU)

process vessel

process vessel means a heater, dehydrator, separator, treater or any other pressurized vessel used in the processing or treatment of produced petroleum. (cuve de traitement)

unattended installation

unattended installation means an installation on which persons are not normally present and in respect of which, when persons are present, it is for the purpose of performing operational duties, maintenance or inspections that will not require an overnight stay. (installation non fréquentée)

Installations

General

The following provision is not in force.

Marginal note:Safety and environmental protection

 An operator must ensure that an installation, including its systems and equipment, is designed, constructed, installed, arranged and commissioned so that it is fit for the purposes for which it is to be used and can be operated safely without posing a threat to persons or the environment.

The following provision is not in force.

Marginal note:Design of installation

 For the purpose of meeting the requirement under section 98 in respect of design, an operator must ensure that an installation, including its systems and equipment, is designed in accordance with the measures referred to in clauses 9(2)(b)(v)(A) and 10(2)(b)(v)(A) that are described in the operator’s safety plan and environmental protection plan, respectively.

Quality Assurance

The following provision is not in force.

Marginal note:Quality assurance program

  • The following provision is not in force.

     (1) An operator must, for the purpose of ensuring that an installation, including its systems and equipment, is fit for the purposes for which it is to be used, develop a quality assurance program that meets the following requirements:

    • The following provision is not in force.

      (a) it must be set out in writing;

    • The following provision is not in force.

      (b) it must be comprehensive;

    • The following provision is not in force.

      (c) it must include a process to achieve quality objectives and to comply with the requirements of these Regulations;

    • The following provision is not in force.

      (d) it must include the policies on which it is based and a process to communicate the policies to personnel and all other affected persons;

    • The following provision is not in force.

      (e) it must set out the roles, responsibilities and authorities of all persons exercising functions under it, as well as the processes for making those persons aware of their roles, responsibilities and authorities and ensuring that they comply with them;

    • The following provision is not in force.

      (f) it must include processes for establishing and maintaining measurable goals and performance indicators that are applicable to it;

    • The following provision is not in force.

      (g) it must include processes for its periodic internal audit and review to identify areas for improvement and the corrective measures to be implemented if deficiencies are identified;

    • The following provision is not in force.

      (h) it must include processes for ensuring that its integrity is preserved when changes to it are planned or implemented;

    • The following provision is not in force.

      (i) it must include processes for internal and external reporting on its performance; and

    • The following provision is not in force.

      (j) it must identify the resources that are necessary to ensure that the requirements under this section are being met.

  • The following provision is not in force.

    Marginal note:Implementation

    (2) The operator must ensure that each phase of the life cycle of the installation, from its design up to and including its decommissioning and abandonment, is carried out in accordance with the program and that any activity relating to the installation that is carried out under the control of a third party is also carried out in accordance with a quality assurance program.

  • The following provision is not in force.

    Marginal note:Accessibility

    (3) The operator must ensure that the processes and policies that are included in the program referred to in subsection (1) are readily accessible for consultation and examination.

  • The following provision is not in force.

    Marginal note:Organization

    (4) The operator must ensure that the documentation relating to the program referred to in subsection (1) is organized and set out in a logical fashion to allow for ease of understanding and efficient implementation.

  • The following provision is not in force.

    Marginal note:Processes and procedures

    (5) In this section, a reference to a process includes any procedures that are necessary to implement the process.

 