Clean Electricity Regulations (SOR/2024-263)
Full Document:
- HTMLFull Document: Clean Electricity Regulations (Accessibility Buttons available) |
- XMLFull Document: Clean Electricity Regulations [325 KB] |
- PDFFull Document: Clean Electricity Regulations [749 KB]
Regulations are current to 2025-12-10 and last amended on 2025-01-01. Previous Versions
SCHEDULE 4(Paragraph 18(3)(a))CEMS Report — Information Required
- The following provision is not in force.
1 The registration number assigned to the unit by the Minister under subsection 7(3) of these Regulations.
- The following provision is not in force.
2 The name, civic address and telephone number of the responsible person.
- The following provision is not in force.
3 The auditor’s name, qualifications, civic address, telephone number, email address and, if any, fax number.
- The following provision is not in force.
4 The procedures followed by the auditor to assess whether
- The following provision is not in force.
(a) the responsible person’s use of the CEMS complied with the quality assurance plan referred to in section 6.1 of the CEMS Protocol; and
- The following provision is not in force.
(b) the responsible person complied with the CEMS Protocol and the CEMS met the specifications set out in the CEMS Protocol, in particular those set out in sections 3 and 4 of the CEMS Protocol.
- The following provision is not in force.
5 A statement of the auditor’s opinion as to whether
- The following provision is not in force.
(a) the responsible person’s use of the CEMS complied with the quality assurance plan referred to in section 6.1 of the CEMS Protocol;
- The following provision is not in force.
(b) the responsible person complied with the CEMS Protocol and the CEMS met the specifications set out in the CEMS Protocol, in particular those set out in sections 3 and 4 of the CEMS Protocol; and
- The following provision is not in force.
(c) the responsible person complied with subsection 18(2) of these Regulations.
- The following provision is not in force.
6 A statement of the auditor’s opinion as to whether the responsible person has ensured that the quality assurance plan has been updated in accordance with sections 6.1 and 6.5.2 of the CEMS Protocol.
Page Details
- Date modified: