Gas Pipeline Uniform Accounting Regulations
Version of section 19 from 2006-03-22 to 2020-03-15:
19 (1) Cost of transportation incurred in the construction of plant shall include the cost of transporting men, equipment and material and supplies used for construction purposes.
(2) The cost of transportation of construction material to the point where material is received by the company shall be included, if practicable, in the cost of the material.
- Date modified: