Government of Canada / Gouvernement du Canada
Symbol of the Government of Canada

Search

Electricity and Gas Inspection Regulations

Version of section 31 from 2006-03-22 to 2009-02-25:

  •  (1) For the purposes of subsections 24(1) and (2) of the Act, an error that is greater than

    • (a) three per cent of the amount of electricity or gas registered by the meter, and

    • (b) where the amount of electricity supplied and the time-related demand for electricity supplied are the joint basis of a charge for electricity sold to a purchaser, with respect to a time-related demand, two and one-half per cent of the maximum point of the electricity meter’s demand scale

    is not permitted.

  • (2) For the purposes of subsection 24(3) of the Act, no error is permitted.


Date modified: