Electricity and Gas Inspection Regulations
Version of section 31 from 2009-02-26 to 2024-10-30:
31 (1) For the purposes of subsections 24(1) and (2) of the Act, an error that is greater than
(a) 3% of the amount of electricity or gas supplied through the meter, and
(b) where the amount of electricity supplied and the time-related demand for electricity supplied are the joint basis of a charge for electricity sold to a purchaser, with respect to a time-related demand, two and one-half per cent of the maximum point of the electricity meter’s demand scale
is not permitted.
(2) For the purposes of subsection 24(3) of the Act, no error is permitted.
- SOR/2009-76, s. 6
- Date modified: