Secondary Lead Smelter Release Regulations (SOR/91-155)
Full Document:
- HTMLFull Document: Secondary Lead Smelter Release Regulations (Accessibility Buttons available) |
- XMLFull Document: Secondary Lead Smelter Release Regulations [34 KB] |
- PDFFull Document: Secondary Lead Smelter Release Regulations [147 KB]
Regulations are current to 2024-11-26
SCHEDULE I(Subsection 9(1))Release Measurement Report
Name of Owner or Operator
Address of Smelter
Telephone Number of Smelter
Unit or Process Tested
Date of Measurement
Detailed Calculations to Be Appended or Forwarded Within 30 Days After Submission of This Report
Test Run No. | 1 | 2 | 3 | 4 | 5 | 6 |
---|---|---|---|---|---|---|
Production at time of test run (tonnes of lead/h) | ||||||
Average flue gas volume at time of test run (norm. m3/min) | ||||||
Particulate matter released (g/norm. m3) | ||||||
Lead content of particulate matter (%) | ||||||
(Signature) | ||||||
(Title) | ||||||
(Date) | ||||||
Valid Test runs |
Test result (average of valid test runs)
(a) particulate matter (g/norm. m3)
(b) lead content of particulate matter (%)
Signature of Attending Enforcement Officer
(if applicable)
- SOR/2000-102, s. 4
- Date modified: