Government of Canada / Gouvernement du Canada
Symbol of the Government of Canada

Search

Nova Scotia Offshore Petroleum Installations Regulations

Version of section 67 from 2006-03-22 to 2009-12-30:

  •  (1) Subject to subsection (2), no holder of a certificate of fitness in respect of an installation shall make any repair, replacement or modification to the installation, or bring on board any equipment, that could affect the strength, stability, integrity, operability or safety of the installation, without the approval of the Chief and the certifying authority.

  • (2) In an emergency, the operator of an installation may repair or modify the installation when the manager of the installation considers that the delay required to comply with subsection (1) would endanger personnel or the environment.

  • (3) Where an operator makes a repair or modification to an installation pursuant to subsection (2), the operator shall immediately notify the Chief and the certifying authority.

  • (4) The operator of an installation shall notify the certifying authority and the Chief immediately if the operator notices any deterioration of the installation that could impair the safety of the installation or damage the environment.


Date modified: